Back to bathroom remodel contractors
Prague Property Management Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2014 to Aug 2026
- Last 24 months
- 6 permits filed
76 permits since 2000: 46 completed, 7 in progress, 14 never finaled, 9 expired or cancelled.
Of the 14 never-finaled permits, 4 are 3 to 5 years old, 6 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 1 in progress, 3 expired or cancelled. Typically 20 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2025 | Completed final sign-off Dec 2025 | 376 Missouri St | replace damaged wall in-kind due to plumbing leak from upstairs bathroom and add insulations.Details
replace damaged wall in-kind due to plumbing leak from upstairs bathroom and add insulations. | $2,500 |
| Nov 12, 2024 | In progress issued Feb 2025 | 805 Vermont St | comply with nov # 202180046 legalize bathroom & laundry room at ground flDetails
comply with nov # 202180046 legalize bathroom & laundry room at ground fl | $10,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 401 Upper Tr | reconfigure e pantry space to 1/2 bath (water closet and vanity) new water heater. elec/mech under sep permit. no structural workDetails
reconfigure e pantry space to 1/2 bath (water closet and vanity) new water heater. elec/mech under sep permit. no structural work | $7,100 |
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 2240 Bay St | unit 105: bathroom upgrade - replace tub surround and new vanityDetails
unit 105: bathroom upgrade - replace tub surround and new vanity | $2,500 |
| Apr 3, 2019 | Completed final sign-off Jun 2019 | 4204 Mission St | unit 3: maintenance retile tub surround, replace deteriorated decking (in-kind) at rear; repair furnace, repair stove; replace floor tile @ kitchen hallway as needed; repair bathroom window; paint as needed in approved mannerDetails
unit 3: maintenance retile tub surround, replace deteriorated decking (in-kind) at rear; repair furnace, repair stove; replace floor tile @ kitchen hallway as needed; repair bathroom window; paint as needed in approved manner | $4,500 |
| Oct 14, 2016 | Completed final sign-off Apr 2018 | 151 Coleridge St | kitchen abd bath remodelDetails
kitchen abd bath remodel | $23,000 |
| Aug 29, 2016 | Completed final sign-off Jun 2018 | 109 17th Av | add 2nd unit at ground floor behind garage, structural work, upgrade (e) family room to kitchen. recess (e) garage door. 1 bedroom & 1 bath. existing legal 1st floor rooms approved under bpa#2004-0913-3903. 6" excavation for (n) corridor less than 50 cubic yards.Details
add 2nd unit at ground floor behind garage, structural work, upgrade (e) family room to kitchen. recess (e) garage door. 1 bedroom & 1 bath. existing legal 1st floor rooms approved under bpa#2004-0913-3903. 6" excavation for (n) corridor less than 50 cubic yards. | $12,350 |
| Oct 13, 2015 | Completed final sign-off Mar 2017 | 1771 10th Av | upgrade kitchen: new countertop/cabinets, replace window sash in extg frame opening, replace hardwood floor, repair dryrot at front room, paint throughout. no structural work. upgrade bathroom. new fixtures and retile shower stall. comply with nov #201541901.Details
upgrade kitchen: new countertop/cabinets, replace window sash in extg frame opening, replace hardwood floor, repair dryrot at front room, paint throughout. no structural work. upgrade bathroom. new fixtures and retile shower stall. comply with nov #201541901. | $26,500 |
| Sep 18, 2015 | Expired or cancelled expired Mar 2026 | 1133 Tennessee St | new horiz add'n at rear of (e) 3 story bldg, remodel + expansion of 2 (e) top floor units, & renovation of (e) garage & addition of (n) 1 br unit, 2 (e) top units have 1 remodeled kitchen & 1 remodeled bath, plus 1.5 baths each. new plumbing & electrical throughout new exterior. sprinkler deferredDetails
new horiz add'n at rear of (e) 3 story bldg, remodel + expansion of 2 (e) top floor units, & renovation of (e) garage & addition of (n) 1 br unit, 2 (e) top units have 1 remodeled kitchen & 1 remodeled bath, plus 1.5 baths each. new plumbing & electrical throughout new exterior. sprinkler deferred | $400,000 |
| Jun 24, 2015 | Completed final sign-off Oct 2015 | 2240 Bay St | work in unit 202: upgrade kitchen and bathroom. new cabinets, counter, vanity and water closet.Details
work in unit 202: upgrade kitchen and bathroom. new cabinets, counter, vanity and water closet. | $18,500 |
| Jun 9, 2015 | Expired or cancelled cancelled Dec 2015 | 1050 North Point St | unit 802 - upgrade kitchen: new cabinets, appliances, floor tiles - replacement; upgrade bathroom: new toilet, vanity, machine cabinet; install 3 hardwired smoke alarms (under separate electricl permit) & co alarm. smooth ceilings throughout with smooth surface. refinish floor throughoutDetails
unit 802 - upgrade kitchen: new cabinets, appliances, floor tiles - replacement; upgrade bathroom: new toilet, vanity, machine cabinet; install 3 hardwired smoke alarms (under separate electricl permit) & co alarm. smooth ceilings throughout with smooth surface. refinish floor throughout | $35,000 |
| Jun 9, 2015 | Expired or cancelled cancelled Nov 2016 | 2641 20th St | convert finished storage space at first floor into a home office/art studio (510 sq.ft.) part of lower unit. install half bathroom.Details
convert finished storage space at first floor into a home office/art studio (510 sq.ft.) part of lower unit. install half bathroom. | $8,975 |
| Jul 25, 2014 | Completed final sign-off May 2015 | 3422 16th St | upgrade kitchen - counters, dishwasher, new appliances, add electrical outlets, new floor, painting. upgrade for one (1) kitchen only and upgrade bathroom - shower stall, vanity, toilet.Details
upgrade kitchen - counters, dishwasher, new appliances, add electrical outlets, new floor, painting. upgrade for one (1) kitchen only and upgrade bathroom - shower stall, vanity, toilet. | $12,500 |