Back to kitchen remodel contractors
Pop Construction A Parnership
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Apr 2021
- Last 24 months
- 0 permits filed
29 permits since 2000: 26 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 18 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2021 | Completed final sign-off Sep 2021 | 257 Wawona St | removal of portion of 2nd fl bearing wall & widening of other doormays. add bears & compensating shear wall. kitchen & bathroom remodel under previous pa# 202103055974.Details
removal of portion of 2nd fl bearing wall & widening of other doormays. add bears & compensating shear wall. kitchen & bathroom remodel under previous pa# 202103055974. | $6,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2019 | 2972 21st St | remodel kitchen, remove non-bearing wals, add plywood at (e) wall for lateral, add sound proofing at ceiling, lower/raise sprinkler heads and cig, lts as necessary, sprinkler work under separate permit no work to upper unit & lower garage floors, mep under separate permitDetails
remodel kitchen, remove non-bearing wals, add plywood at (e) wall for lateral, add sound proofing at ceiling, lower/raise sprinkler heads and cig, lts as necessary, sprinkler work under separate permit no work to upper unit & lower garage floors, mep under separate permit | $26,000 |
| Mar 28, 2019 | Completed final sign-off Dec 2021 | 235 Corbett Av | upper unit remodel kitchen and bath. add 2nd bath, replace windows & doors not visible to street. reframe ceiling joists if necssary. general mep upgradesDetails
upper unit remodel kitchen and bath. add 2nd bath, replace windows & doors not visible to street. reframe ceiling joists if necssary. general mep upgrades | $59,000 |
| Jan 11, 2017 | Completed final sign-off Jan 2017 | 74 Museum Wy | remove (e) drywall, then installnew drywall with greenglue and new rc channels in kitchen and dining room ceiling.Details
remove (e) drywall, then installnew drywall with greenglue and new rc channels in kitchen and dining room ceiling. | $6,750 |