Back to bathroom remodel contractors
Pop Construction A Parnership
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Apr 2021
- Last 24 months
- 0 permits filed
29 permits since 2000: 26 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 6 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2021 | Completed final sign-off Sep 2021 | 257 Wawona St | removal of portion of 2nd fl bearing wall & widening of other doormays. add bears & compensating shear wall. kitchen & bathroom remodel under previous pa# 202103055974.Details
removal of portion of 2nd fl bearing wall & widening of other doormays. add bears & compensating shear wall. kitchen & bathroom remodel under previous pa# 202103055974. | $6,000 |
| Mar 5, 2021 | Completed final sign-off Sep 2021 | 257 Wawona St | in-kind bathroom remodel. new plumbing/electrical. bathroom demo, new shower fixtures. new shower tile/floor.Details
in-kind bathroom remodel. new plumbing/electrical. bathroom demo, new shower fixtures. new shower tile/floor. | $35,000 |
| Sep 20, 2019 | Completed final sign-off Nov 2019 | 760 Guerrero St | ref pa# 201906203978; build new skylight in new bathroom (apartment #3)Details
ref pa# 201906203978; build new skylight in new bathroom (apartment #3) | $3,000 |
| Jul 17, 2019 | Completed final sign-off Nov 2019 | 64 Rosemont Pl | remodel bathroom- install new toilet, walk in shower and finishes.Details
remodel bathroom- install new toilet, walk in shower and finishes. | $40,000 |
| Jun 20, 2019 | Completed final sign-off Nov 2019 | 760 Guerrero St | apt 3: remove (e) closet walls and build new bathroom addition with walk-in shower, including plbmg and electrical work. n/a for maherDetails
apt 3: remove (e) closet walls and build new bathroom addition with walk-in shower, including plbmg and electrical work. n/a for maher | $50,000 |
| Mar 28, 2019 | Completed final sign-off Dec 2021 | 235 Corbett Av | upper unit remodel kitchen and bath. add 2nd bath, replace windows & doors not visible to street. reframe ceiling joists if necssary. general mep upgradesDetails
upper unit remodel kitchen and bath. add 2nd bath, replace windows & doors not visible to street. reframe ceiling joists if necssary. general mep upgrades | $59,000 |
| Dec 3, 2018 | Completed final sign-off Mar 2019 | 233 Corbett Av | in-kind remodel of bathroom in street level story including removing existing bathtub and replacing it with new walk-in shower. also includes upgrading existing fixtures, cabinets, toilet, and sink.Details
in-kind remodel of bathroom in street level story including removing existing bathtub and replacing it with new walk-in shower. also includes upgrading existing fixtures, cabinets, toilet, and sink. | $20,000 |
| Jul 3, 2018 | Completed final sign-off Jul 2019 | 1255 Oak St | unit 4: bathroom remodel in-kind, replace (e) bathtub, medicine cabinet, sink & lighting fixtures, all plubming/electrical work needed for remodel, 5.5'x8'Details
unit 4: bathroom remodel in-kind, replace (e) bathtub, medicine cabinet, sink & lighting fixtures, all plubming/electrical work needed for remodel, 5.5'x8' | $20,000 |
| Apr 13, 2018 | Completed final sign-off Jan 2019 | 2407 Greenwich St | remodel of bathroom. no new square footage on 2nd floor.Details
remodel of bathroom. no new square footage on 2nd floor. | $35,000 |
| Nov 8, 2017 | Completed final sign-off Sep 2019 | 785 Rhode Island St | 2 bath remodel including new finishes, fixturesDetails
2 bath remodel including new finishes, fixtures | $30,000 |
| Nov 7, 2017 | Completed final sign-off Jan 2018 | 469 Tehama St | bathroom remodel in 2nd floor, unit #2. same location. no moving of walls, doors or windows. maher n/aDetails
bathroom remodel in 2nd floor, unit #2. same location. no moving of walls, doors or windows. maher n/a | $6,000 |