Podesta Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Sep 2026
- Last 24 months
- 5 permits filed
103 permits since 2000: 77 completed, 3 in progress, 15 never finaled, 8 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 9 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 5 days from filing to permit and 305 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2016 | Completed final sign-off Feb 2018 | 160 Beaver St | conversion of basement to living space, rebuild of (e)stairs to basement, interior addition of bathroom, (n)deck @rear. deck less than 30" in height. replace of (e)furnace,replacement of (4) windows and (2) doors, not visible from street.Details
conversion of basement to living space, rebuild of (e)stairs to basement, interior addition of bathroom, (n)deck @rear. deck less than 30" in height. replace of (e)furnace,replacement of (4) windows and (2) doors, not visible from street. | $100,000 |
| Oct 27, 2016 | Completed final sign-off Apr 2017 | 239 Oak Park Dr | conversion of g/f (basement) into living space, rebuild (e) stairs, interior addition of bathroom, replace three(3) existing windows and one (1) existing rear sliding door.Details
conversion of g/f (basement) into living space, rebuild (e) stairs, interior addition of bathroom, replace three(3) existing windows and one (1) existing rear sliding door. | $30,000 |
| Jan 8, 2014 | Completed final sign-off Dec 2016 | 619 Rhode Island St | construction of (n) 3-level deck & stair @ rear (east), replacement of windows & exterior doors @ east & north facade.Details
construction of (n) 3-level deck & stair @ rear (east), replacement of windows & exterior doors @ east & north facade. | $110,000 |
| Oct 22, 2008 | Completed final sign-off Aug 2009 | 263 Andover St | installation of interior staircase, removal of two interior walls to capture space in lightwell. removal of rear landing and stairs and installation of new skylight. enlarge three doorways.Details
installation of interior staircase, removal of two interior walls to capture space in lightwell. removal of rear landing and stairs and installation of new skylight. enlarge three doorways. | $65,000 |
| Jul 20, 2005 | Completed final sign-off Nov 2006 | 27 Rosewood Dr | new family room over (e) garage renova. entry walkway area and install new stair and decks @ rear (horiz. addt'n)Details
new family room over (e) garage renova. entry walkway area and install new stair and decks @ rear (horiz. addt'n) | $150,000 |