Back to bathroom remodel contractors
Podesta Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Sep 2026
- Last 24 months
- 5 permits filed
103 permits since 2000: 77 completed, 3 in progress, 15 never finaled, 8 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 9 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 26 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Sep 2026 | 2009 14th Av | revision to permit#202608066209, relocation of master bath water closet and replace (e) plywood and (e) shear wall per inspectorDetails
revision to permit#202608066209, relocation of master bath water closet and replace (e) plywood and (e) shear wall per inspector | |
| Aug 6, 2026 | In progress issued Aug 2026 | 2009 14th Av | remodel to existing kitchen, m. bathroom, laudnry room and replacement of vanity and toilet in guest bathroom. removal of interior partitions as part of m. bathroom remodel. replacement of existing skylight in kind in kitchen.Details
remodel to existing kitchen, m. bathroom, laudnry room and replacement of vanity and toilet in guest bathroom. removal of interior partitions as part of m. bathroom remodel. replacement of existing skylight in kind in kitchen. | $30,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2025 | 626 17th Av | 2nd fl - relocation to existing kitchen and relocation of bathroom. demo and rebuild rear deck. window/door replacement in 1st flDetails
2nd fl - relocation to existing kitchen and relocation of bathroom. demo and rebuild rear deck. window/door replacement in 1st fl | $75,000 |
| Dec 27, 2023 | Completed final sign-off Apr 2024 | 640 Gennessee St | interior remodel to (e) primary bathroom on 2nd fl. new lighting in primary bedroom.Details
interior remodel to (e) primary bathroom on 2nd fl. new lighting in primary bedroom. | $20,000 |
| Apr 12, 2023 | Completed final sign-off Oct 2024 | 1118 De Haro St | 2/f interior remodel: (1) bathroom renovation to full bath, (1) powder room, kitchen alteration, replace (e) sliding door, add new skylights, expand w/d closet, fill in portion of lightwellDetails
2/f interior remodel: (1) bathroom renovation to full bath, (1) powder room, kitchen alteration, replace (e) sliding door, add new skylights, expand w/d closet, fill in portion of lightwell | $109,740 |
| Oct 14, 2022 | Completed final sign-off Jan 2024 | 640 Gennessee St | revision to plans of permit 202208311633 to show an additional sink in bathroom.Details
revision to plans of permit 202208311633 to show an additional sink in bathroom. | $500 |
| Aug 31, 2022 | Completed final sign-off Jan 2024 | 640 Gennessee St | interior remodel to downstairs bathroom, replace (2) windows @ rear in-kind, upgrade hvacDetails
interior remodel to downstairs bathroom, replace (2) windows @ rear in-kind, upgrade hvac | $50,000 |
| Feb 8, 2021 | Completed final sign-off Jul 2023 | 1093 De Haro St | (unit 1095): kitchen & bathroom remodel. replace all drywall. upgrade (e) electrical. replace rear window & door. (unit 1093): kitchen & bathroom remodel. replace all drywall. upgrade (e) electrical. replace rear window & door. infill lightwell. not visible from street.Details
(unit 1095): kitchen & bathroom remodel. replace all drywall. upgrade (e) electrical. replace rear window & door. (unit 1093): kitchen & bathroom remodel. replace all drywall. upgrade (e) electrical. replace rear window & door. infill lightwell. not visible from street. | $100,000 |
| May 12, 2020 | Completed final sign-off Aug 2020 | 239 Oak Park Dr | bathroom remodel of 2 bathrooms in-kind including shower pan. no change to exteriorDetails
bathroom remodel of 2 bathrooms in-kind including shower pan. no change to exterior | $15,000 |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 274 San Marcos Av | remdoel at 2 bathrooms . no change to layout.Details
remdoel at 2 bathrooms . no change to layout. | $40,000 |
| Oct 18, 2018 | Completed final sign-off Feb 2019 | 1583 Treat Av | remodel of e 2nd fl bath, addition of water closet in e garage. replacement of e window e in bath in kindDetails
remodel of e 2nd fl bath, addition of water closet in e garage. replacement of e window e in bath in kind | $30,000 |
| Jul 26, 2018 | Completed final sign-off May 2019 | 1608 20th St | interior remodel of kitchen and bathroom in kind. new skylight, replacement of all windows in kind. no structural work under this permit.Details
interior remodel of kitchen and bathroom in kind. new skylight, replacement of all windows in kind. no structural work under this permit. | $50,000 |
| Apr 11, 2018 | Completed final sign-off Aug 2018 | 344 Connecticut St | ti on 1st fl office/retai: no work at existing office at mezzanine, improvements to involve: upgrade electrical with new outlets & lighting, install new insulation & drywall, remove (e) water closer & sink & create ada bathroom.Details
ti on 1st fl office/retai: no work at existing office at mezzanine, improvements to involve: upgrade electrical with new outlets & lighting, install new insulation & drywall, remove (e) water closer & sink & create ada bathroom. | $60,000 |
| Oct 11, 2017 | Completed final sign-off May 2018 | 900 Green St | 5h fl #500: remodel of two (e) bathrooms. replace fixtures & finishes in both bathrooms. add 2nd shower valve in master bathroom shower. minor electrical in master bedroom.Details
5h fl #500: remodel of two (e) bathrooms. replace fixtures & finishes in both bathrooms. add 2nd shower valve in master bathroom shower. minor electrical in master bedroom. | $40,000 |
| Aug 11, 2017 | Completed final sign-off Feb 2018 | 273 Chenery St | interior remodel of bathroom, converting front bedroom into 2 bedrooms; remodel of master bedroom, replacement of master bedroom window in-kind (back), replacement of front windows in-kindDetails
interior remodel of bathroom, converting front bedroom into 2 bedrooms; remodel of master bedroom, replacement of master bedroom window in-kind (back), replacement of front windows in-kind | $20,000 |
| Dec 5, 2016 | Completed final sign-off Feb 2018 | 160 Beaver St | conversion of basement to living space, rebuild of (e)stairs to basement, interior addition of bathroom, (n)deck @rear. deck less than 30" in height. replace of (e)furnace,replacement of (4) windows and (2) doors, not visible from street.Details
conversion of basement to living space, rebuild of (e)stairs to basement, interior addition of bathroom, (n)deck @rear. deck less than 30" in height. replace of (e)furnace,replacement of (4) windows and (2) doors, not visible from street. | $100,000 |
| Oct 27, 2016 | Completed final sign-off Apr 2017 | 239 Oak Park Dr | conversion of g/f (basement) into living space, rebuild (e) stairs, interior addition of bathroom, replace three(3) existing windows and one (1) existing rear sliding door.Details
conversion of g/f (basement) into living space, rebuild (e) stairs, interior addition of bathroom, replace three(3) existing windows and one (1) existing rear sliding door. | $30,000 |
| Aug 19, 2016 | Completed final sign-off Jun 2017 | 342 Connecticut St | remodel of(e)2 bed/1 bath residence. remodel to include partial reconfiguration of interior walls to achieve 2bed/2 bath and 1 office configuration.repair of (e)roof deck membrane. .removing 4windows & 2doors @rear & replacing w/new patio door &window.install(2)Details
remodel of(e)2 bed/1 bath residence. remodel to include partial reconfiguration of interior walls to achieve 2bed/2 bath and 1 office configuration.repair of (e)roof deck membrane. .removing 4windows & 2doors @rear & replacing w/new patio door &window.install(2) | $50,000 |
| Dec 5, 2014 | Completed final sign-off Mar 2015 | 2225 23rd St | remodel of 1 (e) bathroom, replacement of (e) plumbing fixtures in same location. remodel to iclude replacement of shower pan with hot mop application. no alteration of wall, window and door.Details
remodel of 1 (e) bathroom, replacement of (e) plumbing fixtures in same location. remodel to iclude replacement of shower pan with hot mop application. no alteration of wall, window and door. | $15,000 |
| Jun 25, 2014 | Completed final sign-off Feb 2015 | 481 Arkansas St | interior bathroom remodel. removal of (e) guest bathroom fixtures and finishes, demolition of select interior closet walls and doors. convert closet to a new study room.Details
interior bathroom remodel. removal of (e) guest bathroom fixtures and finishes, demolition of select interior closet walls and doors. convert closet to a new study room. | $30,000 |
| Nov 30, 2012 | Completed final sign-off May 2013 | 4532 17th St | remodel 3 bathrooms & 1 kitchenDetails
remodel 3 bathrooms & 1 kitchen | $100,000 |
| Jan 17, 2012 | Completed final sign-off Sep 2012 | 241 San Fernando Wy | addition of bathroom remodel to permit # 201112070221. no wall removal/replace. no wall openings, no window replacement. remocel of (1) bathroom on 2nd floor to include replacement of (e) shower and vanity. shower to be hot mopDetails
addition of bathroom remodel to permit # 201112070221. no wall removal/replace. no wall openings, no window replacement. remocel of (1) bathroom on 2nd floor to include replacement of (e) shower and vanity. shower to be hot mop | $15,000 |
| Aug 28, 2009 | Completed final sign-off Dec 2009 | 27 Rosewood Dr | revision to application 200908114540. remodel existing bathroom, replace 2 windows and 1 door in existing opening in back of the house (in kind). addition of recessed lighting to (e) study & (e) hall.Details
revision to application 200908114540. remodel existing bathroom, replace 2 windows and 1 door in existing opening in back of the house (in kind). addition of recessed lighting to (e) study & (e) hall. | $20,000 |
| Jul 2, 2009 | Completed final sign-off Dec 2009 | 326 06th Av | remodel to (e) 3rd floor & 2nd floor bathrooms, sash replacement to 2nd floor bathroom window, no interior wall removalDetails
remodel to (e) 3rd floor & 2nd floor bathrooms, sash replacement to 2nd floor bathroom window, no interior wall removal | $30,000 |
| Jun 19, 2008 | Completed final sign-off Sep 2008 | 706 De Haro St | interior improvements: installation of cabinetry in living room & dining room, reconfiguration of existing downstairs guest bath, upgrade to existing master bathroom on second floor.Details
interior improvements: installation of cabinetry in living room & dining room, reconfiguration of existing downstairs guest bath, upgrade to existing master bathroom on second floor. | $20,000 |
| Jan 31, 2008 | Expired or cancelled expired Jul 2009 | 361 Pennsylvania Av | remodel of (e) master bathroom, reconfiguration of master closet to include new laundry area on 2nd floorDetails
remodel of (e) master bathroom, reconfiguration of master closet to include new laundry area on 2nd floor | $60,000 |
| Dec 20, 2007 | Completed final sign-off Apr 2008 | 655 Duncan St | remodel of existing bathroom. replacement of bathroom window. window to be like for like. replacement of finishes/fixture. no structural.Details
remodel of existing bathroom. replacement of bathroom window. window to be like for like. replacement of finishes/fixture. no structural. | $45,000 |
| Jun 2, 2005 | Completed final sign-off Aug 2005 | 520 06th St | interior bath remodel x 2. no structural, only tile and fixtures, small amount electricalDetails
interior bath remodel x 2. no structural, only tile and fixtures, small amount electrical | $37,000 |
| Nov 23, 2004 | Completed final sign-off Feb 2005 | 4834 19th St | bathroom remodel project in 3rd floorDetails
bathroom remodel project in 3rd floor | $23,000 |
| Sep 12, 2003 | Completed final sign-off Jun 2004 | 633 Burrows St | upgrade of two bathrooms.Details
upgrade of two bathrooms. | $40,000 |