Podesta Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Sep 2026
- Last 24 months
- 5 permits filed
103 permits since 2000: 77 completed, 3 in progress, 15 never finaled, 8 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 9 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 176 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2024 | Completed final sign-off Oct 2025 | 626 17th Av | 2nd fl - relocation to existing kitchen and relocation of bathroom. demo and rebuild rear deck. window/door replacement in 1st flDetails
2nd fl - relocation to existing kitchen and relocation of bathroom. demo and rebuild rear deck. window/door replacement in 1st fl | $75,000 |
| Nov 24, 2021 | Never finaled filed Nov 2021, never issued | 352 Castro St | new backyard site work that includes new planting, decks & retaining walls.Details
new backyard site work that includes new planting, decks & retaining walls. | $30,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2020 | 1118 De Haro St | replace (e) 2 story deck at rear with new 2 stroy deck in same locationDetails
replace (e) 2 story deck at rear with new 2 stroy deck in same location | $60,000 |
| Dec 5, 2016 | Completed final sign-off Feb 2018 | 160 Beaver St | conversion of basement to living space, rebuild of (e)stairs to basement, interior addition of bathroom, (n)deck @rear. deck less than 30" in height. replace of (e)furnace,replacement of (4) windows and (2) doors, not visible from street.Details
conversion of basement to living space, rebuild of (e)stairs to basement, interior addition of bathroom, (n)deck @rear. deck less than 30" in height. replace of (e)furnace,replacement of (4) windows and (2) doors, not visible from street. | $100,000 |
| Jan 8, 2014 | Completed final sign-off Dec 2016 | 619 Rhode Island St | construction of (n) 3-level deck & stair @ rear (east), replacement of windows & exterior doors @ east & north facade.Details
construction of (n) 3-level deck & stair @ rear (east), replacement of windows & exterior doors @ east & north facade. | $110,000 |
| Jul 20, 2005 | Completed final sign-off Nov 2006 | 27 Rosewood Dr | new family room over (e) garage renova. entry walkway area and install new stair and decks @ rear (horiz. addt'n)Details
new family room over (e) garage renova. entry walkway area and install new stair and decks @ rear (horiz. addt'n) | $150,000 |
| Jul 6, 2005 | Expired or cancelled expired Oct 2007 | 3806 22nd St | remodel house & add deck.no change to 3/f area. add 1 additional parking space in garage to allow a 2nd dwelling unit on the ground floor.Details
remodel house & add deck.no change to 3/f area. add 1 additional parking space in garage to allow a 2nd dwelling unit on the ground floor. | $90,000 |
| Oct 5, 2004 | Completed final sign-off Jan 2005 | 2455 Leavenworth St | structual work ( stl. beam per eng. plans) to reinforce decks#5 cantilever.Details
structual work ( stl. beam per eng. plans) to reinforce decks#5 cantilever. | $4,500 |