Poas Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Aug 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 20 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | Completed final sign-off Dec 2025 | 701 03rd Av | remove wood composite siding at south facing exterior wall and +/- 5lf at west facing exterior wall at rear staircase. replace w/stucco remove and repair less than 50% of rear staircase for access during work. like for like. replace 4 windows u factor >.30. replace 1 rear entry door. all in kind.Details
remove wood composite siding at south facing exterior wall and +/- 5lf at west facing exterior wall at rear staircase. replace w/stucco remove and repair less than 50% of rear staircase for access during work. like for like. replace 4 windows u factor >.30. replace 1 rear entry door. all in kind. | $45,000 |
| May 15, 2018 | Completed final sign-off Jun 2018 | 256 Guerrero St | replace dry rot at rear staircase, less than 50%, in-kindDetails
replace dry rot at rear staircase, less than 50%, in-kind | $4,500 |
| Aug 8, 2017 | Completed final sign-off Aug 2017 | 1552 Dolores St | repair rear staircase and landings in kind, less than 50%Details
repair rear staircase and landings in kind, less than 50% | $4,000 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 14 Divisadero St | rebuild extg staircase at exterior rear of building in kind, extg layout footprint. no extension beyond existing footprint.Details
rebuild extg staircase at exterior rear of building in kind, extg layout footprint. no extension beyond existing footprint. | $20,000 |
| Dec 16, 2014 | Completed final sign-off Dec 2015 | 221 Dublin St | rev. to 201410027948; removal of exterior staircase and light wellDetails
rev. to 201410027948; removal of exterior staircase and light well | |
| Oct 2, 2014 | Completed final sign-off Nov 2015 | 221 Dublin St | convert an existing crawl space to a habitable media room, laundry room & half bath. construct a new exterior access stair to the lower level. no vertical or horiz. addition is proposed under this permit.Details
convert an existing crawl space to a habitable media room, laundry room & half bath. construct a new exterior access stair to the lower level. no vertical or horiz. addition is proposed under this permit. | $68,000 |