Back to kitchen remodel contractors
Poas Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Aug 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 20 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2019 | Completed final sign-off Nov 2019 | 574 24th Av | kitchen remodel 144 sq ft- appliances to remain in current locations. addition of a wet bar at (e) peninsular countertop.Details
kitchen remodel 144 sq ft- appliances to remain in current locations. addition of a wet bar at (e) peninsular countertop. | $60,000 |
| Dec 11, 2017 | Completed final sign-off Mar 2018 | 614 18th Av | kitchen remodel. replace cabinets & counter tops, resurface hardwood floors, install new appliances in same location. no moving of walls, windows or doors.Details
kitchen remodel. replace cabinets & counter tops, resurface hardwood floors, install new appliances in same location. no moving of walls, windows or doors. | $28,000 |
| Sep 19, 2013 | Completed final sign-off Jan 2014 | 701 03rd Av | demo and reconfigure kitchen island cabinets, reconfigure (e) pony wall and base cabinets misc. plumbing and electrical associated with alteration, demo & tile floor, rebuiled pony plumbing wall @ island. lighting work to comply with cec 150(k)Details
demo and reconfigure kitchen island cabinets, reconfigure (e) pony wall and base cabinets misc. plumbing and electrical associated with alteration, demo & tile floor, rebuiled pony plumbing wall @ island. lighting work to comply with cec 150(k) | $49,000 |