Back to bathroom remodel contractors
Poas Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Aug 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 20 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2020 | Completed final sign-off May 2020 | 264 Dublin St | hall bathroom remodel. all utilities to remain in same locations. no removal of wallsDetails
hall bathroom remodel. all utilities to remain in same locations. no removal of walls | $15,000 |
| Nov 1, 2019 | Completed final sign-off Feb 2020 | 701 03rd Av | hall bathroom remodel, all plumbing locations to remain in kind (in-kind bathroom)Details
hall bathroom remodel, all plumbing locations to remain in kind (in-kind bathroom) | $20,000 |
| Oct 16, 2015 | Completed final sign-off Jan 2016 | 574 24th Av | master bath remodel. demo all, new tile, tub, shower, vanity, toilet, window, lightingDetails
master bath remodel. demo all, new tile, tub, shower, vanity, toilet, window, lighting | $30,000 |
| Jun 24, 2015 | Completed final sign-off Sep 2015 | 1800 Turk St | one bath remodel: demo, install new tub, tole, shower valve, vanity, toilet, fixtures. (no electrical). non-structural.Details
one bath remodel: demo, install new tub, tole, shower valve, vanity, toilet, fixtures. (no electrical). non-structural. | $8,000 |
| Mar 26, 2015 | Completed final sign-off Apr 2015 | 1800 Turk St | bathroom remodel, demo old tub & tile & install new tub/tile, vanity mirror, etc.Details
bathroom remodel, demo old tub & tile & install new tub/tile, vanity mirror, etc. | $9,000 |
| Feb 4, 2015 | Completed final sign-off Aug 2016 | 221 Dublin St | convert (e) attic space to a bathroom, add a dormer to the roof.Details
convert (e) attic space to a bathroom, add a dormer to the roof. | $28,000 |
| Oct 2, 2014 | Completed final sign-off Nov 2015 | 221 Dublin St | convert an existing crawl space to a habitable media room, laundry room & half bath. construct a new exterior access stair to the lower level. no vertical or horiz. addition is proposed under this permit.Details
convert an existing crawl space to a habitable media room, laundry room & half bath. construct a new exterior access stair to the lower level. no vertical or horiz. addition is proposed under this permit. | $68,000 |
| Mar 13, 2014 | Completed final sign-off Jun 2014 | 574 24th Av | hall bathroom remodel, new tile, vanities, remove linen closet wall, new tub, toilet, fill in doorway/new electric and plumbing configurationDetails
hall bathroom remodel, new tile, vanities, remove linen closet wall, new tub, toilet, fill in doorway/new electric and plumbing configuration | $35,330 |