Pk International
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2013
- Last 24 months
- 0 permits filed
50 permits since 2000: 44 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 2 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2009 | Completed final sign-off Apr 2010 | 37 Magnolia St | add roof deck at roof above 4th floor of existing houseDetails
add roof deck at roof above 4th floor of existing house | $5,000 |
| Apr 23, 2009 | Completed final sign-off Apr 2010 | 37 Magnolia St | revision to 200704209296-s1 change flat roof areas to roof decks (3rd fl) change roof deck to flat roof area 4th fl. shear wall revision at 2nd fl, window revised at center bedroom. other updates to plans per as built conditions. add 30" parapets at e/w roof edgesDetails
revision to 200704209296-s1 change flat roof areas to roof decks (3rd fl) change roof deck to flat roof area 4th fl. shear wall revision at 2nd fl, window revised at center bedroom. other updates to plans per as built conditions. add 30" parapets at e/w roof edges |