Back to kitchen remodel contractors
Pk International
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2013
- Last 24 months
- 0 permits filed
50 permits since 2000: 44 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 1930 Franklin St | unit #5: tilework in bathroom, countertop in kitchenDetails
unit #5: tilework in bathroom, countertop in kitchen | $15,000 |
| Jul 19, 2011 | Completed final sign-off May 2012 | 3004 Laguna St | remove bearing wall between kitchen & family room, rebuilt back stair as-in-kind, kitchen remodeling, rebuilt foundation & wall below kitchen.Details
remove bearing wall between kitchen & family room, rebuilt back stair as-in-kind, kitchen remodeling, rebuilt foundation & wall below kitchen. | $38,000 |
| Jun 17, 2011 | Completed final sign-off Dec 2011 | 1976 Hayes St | interior remodel incl. relocate kitchen and bathrooms on 2nd floor unit at 1976 hayes. new rear deck at 2nd floor.Details
interior remodel incl. relocate kitchen and bathrooms on 2nd floor unit at 1976 hayes. new rear deck at 2nd floor. | $20,000 |
| Sep 30, 2010 | Completed final sign-off May 2011 | 1978 Hayes St | unit #b: remodel apartment unit b: remodel one bathroom, remodel kitchen with new cabinets and appliances. plumbing include tankless wh, gas stove , kitchen sink and bath tub, toilet and vaninty. electrical include 20 outlets, 10 light fixtures, 6 switches, new subpanel.Details
unit #b: remodel apartment unit b: remodel one bathroom, remodel kitchen with new cabinets and appliances. plumbing include tankless wh, gas stove , kitchen sink and bath tub, toilet and vaninty. electrical include 20 outlets, 10 light fixtures, 6 switches, new subpanel. | $24,000 |
| Aug 23, 2010 | Completed final sign-off May 2011 | 1974 Hayes St | work in unit #1976 hayes st #b-remodel apt. unit includes kitchen, bathroom, replace cabinets, countertop & fixtures. plumbing will consists of kitchen sink, gas line for stove, vanity for bathroom, toilet & shower. electrical will consists of 20 outlet, 10 lights fixtures & 6 switches.Details
work in unit #1976 hayes st #b-remodel apt. unit includes kitchen, bathroom, replace cabinets, countertop & fixtures. plumbing will consists of kitchen sink, gas line for stove, vanity for bathroom, toilet & shower. electrical will consists of 20 outlet, 10 lights fixtures & 6 switches. | $20,000 |
| May 4, 2006 | Completed final sign-off Oct 2006 | 2348 Funston Av | kitchen remodel: remove existing cabinets and install new cabinets, appliances and fixtures.Details
kitchen remodel: remove existing cabinets and install new cabinets, appliances and fixtures. | $35,000 |
| Jun 20, 2005 | Completed final sign-off Apr 2006 | 182 Commonwealth Av | kitchen & powder room remodel:remove wall between (e)kitchen & breakfast room,install (n)cabinets &Details
kitchen & powder room remodel:remove wall between (e)kitchen & breakfast room,install (n)cabinets & | $120,000 |
| Oct 29, 2002 | Completed final sign-off Dec 2002 | 6248 03rd St | replace windows to insulate type. replace plumbing fixts in kitchen & bathrm no change in location,Details
replace windows to insulate type. replace plumbing fixts in kitchen & bathrm no change in location, | $11,000 |
| Mar 31, 2000 | Completed final sign-off Aug 2000 | 100 Edgewood Av | kitchen remodel-new cabinets,oak floor,replace rotting sashesDetails
kitchen remodel-new cabinets,oak floor,replace rotting sashes | $19,000 |
| Mar 14, 2000 | Completed final sign-off Sep 2000 | 2430 Broadway | remodel kitchen, some windows at existing locations, lv room & diningDetails
remodel kitchen, some windows at existing locations, lv room & dining | |
| Mar 14, 2000 | Completed final sign-off Oct 2000 | 2616 Buchanan St | remodel kitchen bathroom some windowsDetails
remodel kitchen bathroom some windows |