Pk International
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jan 2013
- Last 24 months
- 0 permits filed
50 permits since 2000: 44 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2013 | Completed final sign-off Feb 2013 | 1920 Franklin St | common area- build 6' tall wood property fence approx. 60 l.f.Details
common area- build 6' tall wood property fence approx. 60 l.f. | $4,500 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 1930 Franklin St | repair section of concrete slab in garage 15x18, repair dry-rot portions of soffit in front 3x25, no structural work.Details
repair section of concrete slab in garage 15x18, repair dry-rot portions of soffit in front 3x25, no structural work. | $12,000 |
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 1920 Franklin St | unit #12: tilework in bathroom, countertops in ktichenDetails
unit #12: tilework in bathroom, countertops in ktichen | $15,000 |
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 1930 Franklin St | unit #5: tilework in bathroom, countertop in kitchenDetails
unit #5: tilework in bathroom, countertop in kitchen | $15,000 |
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 1920 Franklin St | replace vinyl tile in main stairs, work to take place in common areaDetails
replace vinyl tile in main stairs, work to take place in common area | $3,000 |
| Oct 7, 2011 | Completed final sign-off Nov 2011 | 3750 Webster St | install anchor bolts, holdowns, plywood wall at garageDetails
install anchor bolts, holdowns, plywood wall at garage | $2,000 |
| Aug 4, 2011 | Completed final sign-off Oct 2011 | 2932 26th Av | add bedroom 3 and full bath at ground floor with new stair to 2nd floorDetails
add bedroom 3 and full bath at ground floor with new stair to 2nd floor | $25,000 |
| Jul 25, 2011 | Never finaled issued Jul 2011, no final | 182 Commonwealth Av | replace 2 front window on 1st floor(56x64 casement pair) with width pair 56"x28" radius fixed sash wood window extg on top of extg casement pair. u factor 0.40 max.Details
replace 2 front window on 1st floor(56x64 casement pair) with width pair 56"x28" radius fixed sash wood window extg on top of extg casement pair. u factor 0.40 max. | $4,000 |
| Jul 19, 2011 | Completed final sign-off May 2012 | 3004 Laguna St | remove bearing wall between kitchen & family room, rebuilt back stair as-in-kind, kitchen remodeling, rebuilt foundation & wall below kitchen.Details
remove bearing wall between kitchen & family room, rebuilt back stair as-in-kind, kitchen remodeling, rebuilt foundation & wall below kitchen. | $38,000 |
| Jul 13, 2011 | Completed final sign-off Mar 2012 | 2465 Pacific Av | remodel bathroom on 2nd floor. replace extg skylight same size and location.Details
remodel bathroom on 2nd floor. replace extg skylight same size and location. | $20,000 |
| Jun 17, 2011 | Completed final sign-off Dec 2011 | 1976 Hayes St | interior remodel incl. relocate kitchen and bathrooms on 2nd floor unit at 1976 hayes. new rear deck at 2nd floor.Details
interior remodel incl. relocate kitchen and bathrooms on 2nd floor unit at 1976 hayes. new rear deck at 2nd floor. | $20,000 |
| May 19, 2011 | Expired or cancelled cancelled Jan 2026 | 101 Spear St | suite a20: headers and louvers only @ dining rm. entrance to corridor. refferance to extg permit #200905208765.Details
suite a20: headers and louvers only @ dining rm. entrance to corridor. refferance to extg permit #200905208765. | $1,000 |
| Nov 22, 2010 | Completed final sign-off May 2011 | 1976 Hayes St | revision to pa# 2010.08.23.9355 and 2010.09.30.1965 ( no plans). convert one bedroom to two bedrooms for unit 1976 and 1978 hayes st. adding a partition wall to create one bedroom per planDetails
revision to pa# 2010.08.23.9355 and 2010.09.30.1965 ( no plans). convert one bedroom to two bedrooms for unit 1976 and 1978 hayes st. adding a partition wall to create one bedroom per plan | $3,000 |
| Sep 30, 2010 | Completed final sign-off May 2011 | 1978 Hayes St | unit #b: remodel apartment unit b: remodel one bathroom, remodel kitchen with new cabinets and appliances. plumbing include tankless wh, gas stove , kitchen sink and bath tub, toilet and vaninty. electrical include 20 outlets, 10 light fixtures, 6 switches, new subpanel.Details
unit #b: remodel apartment unit b: remodel one bathroom, remodel kitchen with new cabinets and appliances. plumbing include tankless wh, gas stove , kitchen sink and bath tub, toilet and vaninty. electrical include 20 outlets, 10 light fixtures, 6 switches, new subpanel. | $24,000 |
| Aug 23, 2010 | Completed final sign-off May 2011 | 1974 Hayes St | work in unit #1976 hayes st #b-remodel apt. unit includes kitchen, bathroom, replace cabinets, countertop & fixtures. plumbing will consists of kitchen sink, gas line for stove, vanity for bathroom, toilet & shower. electrical will consists of 20 outlet, 10 lights fixtures & 6 switches.Details
work in unit #1976 hayes st #b-remodel apt. unit includes kitchen, bathroom, replace cabinets, countertop & fixtures. plumbing will consists of kitchen sink, gas line for stove, vanity for bathroom, toilet & shower. electrical will consists of 20 outlet, 10 lights fixtures & 6 switches. | $20,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2010 | 182 Commonwealth Av | replace stucco (approx 100 sq ft) & 3 windows in rear of buildingDetails
replace stucco (approx 100 sq ft) & 3 windows in rear of building | $18,000 |
| Apr 30, 2010 | Completed final sign-off Jul 2010 | 340 Kansas St | install (e) gas fire furnaces, flues, new exposed duct work, registers. outside fire ducts, 1 roof exhaust fans, 2 digital thermostat. ti approved under pa# 2009.10.07.8517. height of flue on roof is 16"Details
install (e) gas fire furnaces, flues, new exposed duct work, registers. outside fire ducts, 1 roof exhaust fans, 2 digital thermostat. ti approved under pa# 2009.10.07.8517. height of flue on roof is 16" | $24,884 |
| Mar 25, 2010 | Completed final sign-off May 2010 | 340 Kansas St | title-24 documentation to be included in separate permit as described in issued permit #2009/1007/8517.Details
title-24 documentation to be included in separate permit as described in issued permit #2009/1007/8517. | $5,000 |
| Oct 28, 2009 | Completed final sign-off Nov 2009 | 118 Cayuga Av | stucco repair at front of building, lower floor entire width.Details
stucco repair at front of building, lower floor entire width. | $2,500 |
| May 13, 2009 | Completed final sign-off Apr 2010 | 37 Magnolia St | add roof deck at roof above 4th floor of existing houseDetails
add roof deck at roof above 4th floor of existing house | $5,000 |
| Apr 23, 2009 | Completed final sign-off Apr 2010 | 37 Magnolia St | revision to 200704209296-s1 change flat roof areas to roof decks (3rd fl) change roof deck to flat roof area 4th fl. shear wall revision at 2nd fl, window revised at center bedroom. other updates to plans per as built conditions. add 30" parapets at e/w roof edgesDetails
revision to 200704209296-s1 change flat roof areas to roof decks (3rd fl) change roof deck to flat roof area 4th fl. shear wall revision at 2nd fl, window revised at center bedroom. other updates to plans per as built conditions. add 30" parapets at e/w roof edges | |
| Jul 3, 2008 | Completed final sign-off Oct 2008 | 1133 Taylor St | sheetrock storage rooms with type "x" drywall to comply with nov# 200732493, item# 2.Details
sheetrock storage rooms with type "x" drywall to comply with nov# 200732493, item# 2. | $1,500 |
| Aug 9, 2007 | Completed final sign-off May 2008 | 562 10th Av | restoration of original windows on property-line 3 fire-rated windows will be installed on the property line where the original windows existed.Details
restoration of original windows on property-line 3 fire-rated windows will be installed on the property line where the original windows existed. | $6,000 |
| Aug 10, 2006 | Completed final sign-off Aug 2006 | 728 Vallejo St | repair and replace wood guardrail @ rooftop (less than 50%) per complaint #200671105.Details
repair and replace wood guardrail @ rooftop (less than 50%) per complaint #200671105. | $500 |
| May 8, 2006 | Expired or cancelled withdrawn May 2006 | 562 10th Av | remove front facade stucco, replace with wood shingles.Details
remove front facade stucco, replace with wood shingles. | $30,000 |
| May 4, 2006 | Completed final sign-off Oct 2006 | 2348 Funston Av | kitchen remodel: remove existing cabinets and install new cabinets, appliances and fixtures.Details
kitchen remodel: remove existing cabinets and install new cabinets, appliances and fixtures. | $35,000 |
| Apr 19, 2006 | Completed final sign-off Apr 2006 | 182 Commonwealth Av | renew appl#200509294312 for f inal inspection only.Details
renew appl#200509294312 for f inal inspection only. | |
| Feb 24, 2006 | Completed final sign-off Mar 2006 | 2309 Divisadero St | backyard deck repairs-replace dryrotted joists with pressure treated lumber. less than 50% if > 50% bldg insp. may require plans & city planning approval.Details
backyard deck repairs-replace dryrotted joists with pressure treated lumber. less than 50% if > 50% bldg insp. may require plans & city planning approval. | $1,050 |
| Nov 30, 2005 | Completed final sign-off Dec 2005 | 12 Pleasant St | in reference to app 200508160338, no work to be performed in unit no 16, work limited to unit no 12 onlyDetails
in reference to app 200508160338, no work to be performed in unit no 16, work limited to unit no 12 only | |
| Sep 29, 2005 | Expired or cancelled expired Apr 2006 | 182 Commonwealth Av | rev. to pa32005/06/23/5950 - reduce width of deck stairs; reduce width of deck columns, change location of stairs to basement entranceDetails
rev. to pa32005/06/23/5950 - reduce width of deck stairs; reduce width of deck columns, change location of stairs to basement entrance | |
| Aug 23, 2005 | Expired or cancelled expired Aug 2007 | 118 29th St | fixing back stairs. less than 50% of work.Details
fixing back stairs. less than 50% of work. | $11,000 |
| Jun 23, 2005 | Completed final sign-off Apr 2006 | 182 Commonwealth Av | demolish (e) deck, construct new deck & stair to garden.Details
demolish (e) deck, construct new deck & stair to garden. | $50,000 |
| Jun 20, 2005 | Completed final sign-off Apr 2006 | 182 Commonwealth Av | kitchen & powder room remodel:remove wall between (e)kitchen & breakfast room,install (n)cabinets &Details
kitchen & powder room remodel:remove wall between (e)kitchen & breakfast room,install (n)cabinets & | $120,000 |
| Apr 13, 2005 | Completed final sign-off Feb 2006 | 1857 24th Av | demolish 1 dwelling unit, 1 story cottage.Details
demolish 1 dwelling unit, 1 story cottage. | |
| Dec 1, 2004 | Completed final sign-off Jan 2006 | 655 14th Av | revision to appln #2004/10/14/6827 change post cap and add pad footing revise post sizeDetails
revision to appln #2004/10/14/6827 change post cap and add pad footing revise post size | $500 |
| Nov 22, 2004 | Completed final sign-off Jan 2006 | 655 14th Av | replace (e)footing at southwest corner of foundation.rev.to appl#200410146827Details
replace (e)footing at southwest corner of foundation.rev.to appl#200410146827 | $2,000 |
| Aug 17, 2004 | Expired or cancelled expired Sep 2013 | 2430 Hyde St | revision to 200306116764:modify 2nf floor w/o structural changes to existing building partition *Details
revision to 200306116764:modify 2nf floor w/o structural changes to existing building partition * | |
| Mar 4, 2004 | Completed final sign-off Aug 2004 | 563 10th Av | lower (e) slab @ basement playroom 7". replace (e) slab @ basement ofice & laundry rooms. refer toDetails
lower (e) slab @ basement playroom 7". replace (e) slab @ basement ofice & laundry rooms. refer to | $20,000 |
| Dec 18, 2003 | Completed final sign-off Dec 2003 | 920 Rockdale Dr | renewal for final inspection for app # 2002/02/11/8893 s1, 200211010591, 200303109214Details
renewal for final inspection for app # 2002/02/11/8893 s1, 200211010591, 200303109214 | |
| May 9, 2003 | Completed final sign-off Dec 2004 | 285 San Anselmo Av | all revision to app 200207020506-switch breakfast rm dr & window, nw roof, new stucco, new sheetrockDetails
all revision to app 200207020506-switch breakfast rm dr & window, nw roof, new stucco, new sheetrock | $56,000 |
| Oct 29, 2002 | Completed final sign-off Dec 2002 | 6248 03rd St | replace windows to insulate type. replace plumbing fixts in kitchen & bathrm no change in location,Details
replace windows to insulate type. replace plumbing fixts in kitchen & bathrm no change in location, | $11,000 |
| Jul 2, 2002 | Completed final sign-off Dec 2004 | 285 San Anselmo Av | widen extg garage lower floor in bsmnt to create an office and guest bdrm & bth/rmdl kchn/create fmlDetails
widen extg garage lower floor in bsmnt to create an office and guest bdrm & bth/rmdl kchn/create fml | $400,000 |
| Apr 5, 2002 | Completed final sign-off Jul 2002 | 2910 Pacific Av | renew #9910723s for final inspectionDetails
renew #9910723s for final inspection | |
| Mar 26, 2002 | Completed final sign-off Jul 2002 | 2910 Pacific Av | revise to app #9910723 show minor changes in basement plan made during const. at request of pg & eDetails
revise to app #9910723 show minor changes in basement plan made during const. at request of pg & e | $1,000 |
| Aug 3, 2000 | Completed final sign-off Aug 2000 | 45 Mccoppin St | repair rear stairs, repalce dryrot wood w/pressure-treated to correct n.o.v. 200006458Details
repair rear stairs, repalce dryrot wood w/pressure-treated to correct n.o.v. 200006458 | $2,500 |
| Aug 1, 2000 | Completed final sign-off Sep 2000 | 2436 Jackson St | rev. to pa#9917692-this is a minor rev. to an (e) permit applic. change in the design of a deck railDetails
rev. to pa#9917692-this is a minor rev. to an (e) permit applic. change in the design of a deck rail | |
| Apr 5, 2000 | Completed final sign-off Sep 2000 | 2430 Broadway | revise pa#2000-03-14-4319-submit structural calculations & plans for widen door openingsDetails
revise pa#2000-03-14-4319-submit structural calculations & plans for widen door openings | $5,000 |
| Mar 31, 2000 | Completed final sign-off Aug 2000 | 100 Edgewood Av | kitchen remodel-new cabinets,oak floor,replace rotting sashesDetails
kitchen remodel-new cabinets,oak floor,replace rotting sashes | $19,000 |
| Mar 14, 2000 | Completed final sign-off Sep 2000 | 2430 Broadway | remodel kitchen, some windows at existing locations, lv room & diningDetails
remodel kitchen, some windows at existing locations, lv room & dining | |
| Mar 14, 2000 | Completed final sign-off Oct 2000 | 2616 Buchanan St | remodel kitchen bathroom some windowsDetails
remodel kitchen bathroom some windows |