Pjd Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Aug 2026
- Last 24 months
- 19 permits filed
54 permits since 2000: 37 completed, 6 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 84 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2025 | Completed final sign-off Jun 2026 | 3900 Kirkham St | install exterior pre-manufactured metal spiral staircase for access between yard, 2nd floor, and roof deck.deferred submittal for permit application #202502200678.Details
install exterior pre-manufactured metal spiral staircase for access between yard, 2nd floor, and roof deck.deferred submittal for permit application #202502200678. | $22,000 |
| Mar 7, 2025 | Completed final sign-off Jul 2026 | 3900 Kirkham St | interior remodel and 2 story addition at the rear of an (e) 2 story 1305 sq ft sfr with a proposed total increase of 690 sq ft. the project includes a 142 sq ft roof deck above the addition with an exterior spiral staircase for access.Details
interior remodel and 2 story addition at the rear of an (e) 2 story 1305 sq ft sfr with a proposed total increase of 690 sq ft. the project includes a 142 sq ft roof deck above the addition with an exterior spiral staircase for access. | $300,000 |
| Apr 10, 2024 | Completed final sign-off Aug 2024 | 893 Clayton St | revision to 201404163412 s1. removal of 2 dormers from scope. reduce of window size. clarification of storage/mech area for 4th fl & adding roof deck off of 4th fl within rear setback at rear of property. driveway surface change to paveable paversDetails
revision to 201404163412 s1. removal of 2 dormers from scope. reduce of window size. clarification of storage/mech area for 4th fl & adding roof deck off of 4th fl within rear setback at rear of property. driveway surface change to paveable pavers |