Pjd Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Aug 2026
- Last 24 months
- 19 permits filed
55 permits since 2000: 39 completed, 5 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Deck permits
3 deck permits: 1 completed, 2 in progress. Typically 121 days from filing to permit and 1084 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Jul 2026 | 70 Grand View Tr | structural repairs to (e) decks at rear of the building. replace (e) deteriorated framing members. replace (e) cantilvered beams w/ new beams & columns.Details
structural repairs to (e) decks at rear of the building. replace (e) deteriorated framing members. replace (e) cantilvered beams w/ new beams & columns. | $50,000 |
| Jul 14, 2026 | In progress issued Nov 2026 | 2728 Vicente St | 1200sqf 2-story horizontal addition of (e) sfh. 1/f addition includes 2 bedrooms, 2 baths, closets, laundry room, mech room.2/f addition includes kitchen, dining, living room, new deck. interior remodel of (e) spacesDetails
1200sqf 2-story horizontal addition of (e) sfh. 1/f addition includes 2 bedrooms, 2 baths, closets, laundry room, mech room.2/f addition includes kitchen, dining, living room, new deck. interior remodel of (e) spaces | $250,000 |
| Apr 16, 2014 | Completed final sign-off Aug 2024 | 893 Clayton St | install a garage in the lower 1st floor with new garage door & ramp / driveway. install new spiral stair from 2nd to 1st floor. install play romm / office, bath, closet & low height deck @ 1st floor level behind garage @ rear.Details
install a garage in the lower 1st floor with new garage door & ramp / driveway. install new spiral stair from 2nd to 1st floor. install play romm / office, bath, closet & low height deck @ 1st floor level behind garage @ rear. | $125,000 |