Back to kitchen remodel contractors
Pjd Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Aug 2026
- Last 24 months
- 19 permits filed
54 permits since 2000: 37 completed, 6 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 2 expired or cancelled. Typically 1 days from filing to permit and 123 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2025 | Completed final sign-off Jun 2025 | 3821 26th St | kitchen remodel at one units: remodel kitchen cabinets countertops, and sink. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
kitchen remodel at one units: remodel kitchen cabinets countertops, and sink. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $30,000 |
| Jan 22, 2025 | Completed final sign-off Mar 2025 | 455 25th Av | refurbish existing kitchen, remove counter tops & install new counter top, change sink. add electric oven. install breakfast bar. add backsplash.Details
refurbish existing kitchen, remove counter tops & install new counter top, change sink. add electric oven. install breakfast bar. add backsplash. | $15,000 |
| Jun 18, 2024 | Completed final sign-off Feb 2026 | 601 19th St | remodel (e) service bar/prep kitchen on mezzanie to provide service counters, new plumbing fixtures layout and finsihesDetails
remodel (e) service bar/prep kitchen on mezzanie to provide service counters, new plumbing fixtures layout and finsihes | $50,000 |
| Jan 9, 2024 | Completed final sign-off Jun 2024 | 2530 Franklin St | remodel existing bathroom on top floor and half bathroom. remodel existing laundry room on top floor. install new ceiling fan on 2nd floor bathroom. tile kitchen floor new plumbing. no moving wallsDetails
remodel existing bathroom on top floor and half bathroom. remodel existing laundry room on top floor. install new ceiling fan on 2nd floor bathroom. tile kitchen floor new plumbing. no moving walls | $45,000 |
| Oct 28, 2022 | Completed final sign-off Mar 2023 | 4317 25th St | remove and replace kitchen cabinets. remove and replace bathroom tile and new shower pan.Details
remove and replace kitchen cabinets. remove and replace bathroom tile and new shower pan. | $25,000 |
| Dec 3, 2021 | Completed final sign-off Mar 2025 | 4348 18th St | interior remodel of units 4348 & 4350 18th st. new kitchen and bathroom in each unit. response to nov #202183534.Details
interior remodel of units 4348 & 4350 18th st. new kitchen and bathroom in each unit. response to nov #202183534. | $50,000 |
| Jun 29, 2017 | Expired or cancelled expired Aug 2025 | 1856 29th Av | remodel kitchen, remodel bathrooms, upgrade interior doors reframe, repair dryrot in walls bathroom, move non bearing walls & add closet in bedroom 1&2Details
remodel kitchen, remodel bathrooms, upgrade interior doors reframe, repair dryrot in walls bathroom, move non bearing walls & add closet in bedroom 1&2 | $50,000 |
| Jun 14, 2017 | Expired or cancelled expired Aug 2025 | 1856 29th Av | remodel 1 kitchen & 1-1/2 bathrooms, re-tile both bathrooms, redo all kitchen cabinets & countertops. no walls to be moved. all work on 2nd floor.Details
remodel 1 kitchen & 1-1/2 bathrooms, re-tile both bathrooms, redo all kitchen cabinets & countertops. no walls to be moved. all work on 2nd floor. | $35,000 |
| Apr 3, 2017 | Completed final sign-off May 2017 | 1625 Pacific Av | remove old tile sheetrock re -waterproof and re-tile floor and shower walls. tile kitchen floor, new countertops and new hardwood floors in living room and hallways. new vanities in bathroom and 1/2 bathroom.Details
remove old tile sheetrock re -waterproof and re-tile floor and shower walls. tile kitchen floor, new countertops and new hardwood floors in living room and hallways. new vanities in bathroom and 1/2 bathroom. | $14,500 |