Peng Fei Tan
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to May 2016
- Last 24 months
- 0 permits filed
41 permits since 2000: 35 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 2 days from filing to permit and 432 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 6, 2015 | Completed final sign-off May 2016 | 1630 32nd Av | remodel existing storage and laundry room into new media and game room. add r-13 insulation at all perimeter walls, 5/8" gyp board on all walls and ceiling, lighting. open existing stair case connect gr fl and 2nd fl by removing partitions and door at gr level. move existing washer dryer to newDetails
remodel existing storage and laundry room into new media and game room. add r-13 insulation at all perimeter walls, 5/8" gyp board on all walls and ceiling, lighting. open existing stair case connect gr fl and 2nd fl by removing partitions and door at gr level. move existing washer dryer to new | $5,000 |
| Nov 27, 2013 | Completed final sign-off Jun 2014 | 843 35th Av | revision for application #2013.06.03.8503. kitchen remodel, two bedrooms and one office remodel at 2nd floor. change to a straight run stairway between 1st and 2nd floor.Details
revision for application #2013.06.03.8503. kitchen remodel, two bedrooms and one office remodel at 2nd floor. change to a straight run stairway between 1st and 2nd floor. | $20,000 |
| Jun 3, 2013 | Completed final sign-off Jun 2014 | 843 35th Av | new exterior doors and windows on 1st floor level, a new conditioned space on the 1st floor, renovation of uncompliant stairway to new conditioned space on 1st floor and bathroom remodel. no exterior finishes are affected by proposed work.Details
new exterior doors and windows on 1st floor level, a new conditioned space on the 1st floor, renovation of uncompliant stairway to new conditioned space on 1st floor and bathroom remodel. no exterior finishes are affected by proposed work. | $100,000 |
| Jan 8, 2008 | Completed final sign-off Jun 2010 | 1114 Montgomery St | interior remodeling and alteration to all floors. infill walls under (e) porch area at basement level. replace 2nd exit wood stairs with spiral stairs at lightwell. replace all windows with vinyl frame in kind. add 6 more posts at ground floor and 2 on 1st floor.Details
interior remodeling and alteration to all floors. infill walls under (e) porch area at basement level. replace 2nd exit wood stairs with spiral stairs at lightwell. replace all windows with vinyl frame in kind. add 6 more posts at ground floor and 2 on 1st floor. | $325,000 |