Back to bathroom remodel contractors
Peng Fei Tan
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to May 2016
- Last 24 months
- 0 permits filed
41 permits since 2000: 35 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 1 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2016 | Completed final sign-off Apr 2017 | 1955 29th Av | frist floor: to add a bedroom & a full bathroom, 2nd flr: remodel kitchen and bathroom on 2nd floor.Details
frist floor: to add a bedroom & a full bathroom, 2nd flr: remodel kitchen and bathroom on 2nd floor. | $36,000 |
| Apr 14, 2014 | Completed final sign-off Aug 2014 | 1789 08th Av | kitchen, bathroom remodel (same to same). no layout change.Details
kitchen, bathroom remodel (same to same). no layout change. | $13,000 |
| Dec 3, 2013 | Completed final sign-off Mar 2014 | 2638 Phelps St | 1/f: add 1 bedroom, full bath and storage room. 2/f: romodel kitchen and bath.Details
1/f: add 1 bedroom, full bath and storage room. 2/f: romodel kitchen and bath. | $54,000 |
| Nov 7, 2013 | Completed final sign-off Mar 2014 | 1791 08th Av | 3rd floor: remodel kitchen and bath. rearrange plumbing fixturesDetails
3rd floor: remodel kitchen and bath. rearrange plumbing fixtures | $10,000 |
| Oct 15, 2013 | Completed final sign-off Feb 2014 | 180 Guttenberg St | to comply with complaint # 201328881 to legalize 1 bedroom, 1 bath, playroom and storage on 1st fl per planDetails
to comply with complaint # 201328881 to legalize 1 bedroom, 1 bath, playroom and storage on 1st fl per plan | $38,000 |
| Oct 10, 2013 | Completed final sign-off Jan 2014 | 2732 Taraval St | 1st floor: add playroom, half bath and laudnry room in garage level.Details
1st floor: add playroom, half bath and laudnry room in garage level. | $30,000 |
| Jul 9, 2013 | Completed final sign-off Oct 2013 | 91 Maddux Av | add 2 bedrooms, one full bath, laundry and storage at ground floor.Details
add 2 bedrooms, one full bath, laundry and storage at ground floor. | $33,600 |
| Jun 3, 2013 | Completed final sign-off Jun 2014 | 843 35th Av | new exterior doors and windows on 1st floor level, a new conditioned space on the 1st floor, renovation of uncompliant stairway to new conditioned space on 1st floor and bathroom remodel. no exterior finishes are affected by proposed work.Details
new exterior doors and windows on 1st floor level, a new conditioned space on the 1st floor, renovation of uncompliant stairway to new conditioned space on 1st floor and bathroom remodel. no exterior finishes are affected by proposed work. | $100,000 |
| Sep 7, 2012 | Completed final sign-off Jan 2013 | 10 Bannan Pl | revision to appl #2010.0923.1479 - convert the dining back to bedroom, add a new bathroom & change the master bath.Details
revision to appl #2010.0923.1479 - convert the dining back to bedroom, add a new bathroom & change the master bath. | $10,000 |
| May 9, 2012 | Completed final sign-off Jan 2013 | 79 Putnam St | revised to appn. 200809262704; enlarged bathroom area, add wall heat, 2. relocated kitchen counter, 3, relocated closet, 4. remain (e) window and reduced propsed glass area at front entrance, 5. 1-5/8" gyp board type "x" at property line insideDetails
revised to appn. 200809262704; enlarged bathroom area, add wall heat, 2. relocated kitchen counter, 3, relocated closet, 4. remain (e) window and reduced propsed glass area at front entrance, 5. 1-5/8" gyp board type "x" at property line inside | |
| Sep 30, 2011 | Completed final sign-off Jan 2012 | 2075 16th Av | remodel ground floor - add playroom, family room, full bath & storage room. add half bath on 2nd floor.Details
remodel ground floor - add playroom, family room, full bath & storage room. add half bath on 2nd floor. | $55,000 |
| Sep 23, 2010 | Expired or cancelled expired Jan 2013 | 10 Bannan Pl | rev. to pa# 2009.12.31.4083. relocation of new bathroom and kitchen. delete new half bath. replace plaster wall to install r-13 insulation and install 5/8" gyp bd on all wallsDetails
rev. to pa# 2009.12.31.4083. relocation of new bathroom and kitchen. delete new half bath. replace plaster wall to install r-13 insulation and install 5/8" gyp bd on all walls | $30,000 |
| Jan 22, 2009 | Completed final sign-off Apr 2009 | 842 Madrid St | add 2 bedrooms & 1 bathroom on ground floor (no structural work involved)Details
add 2 bedrooms & 1 bathroom on ground floor (no structural work involved) | $15,000 |
| Sep 10, 2008 | Expired or cancelled expired Jun 2014 | 843 35th Av | upgrade fixtures to both bathrooms, relocate shower, tub and sink in full bath, add toilet. demo/upgrade electrical and plumbing. remove and replace non bearing wallDetails
upgrade fixtures to both bathrooms, relocate shower, tub and sink in full bath, add toilet. demo/upgrade electrical and plumbing. remove and replace non bearing wall | $10,000 |
| May 8, 2008 | Completed final sign-off Sep 2008 | 1437 Sacramento St | convert bathroom to master bathroom. remodel kitchen to include cabinets and fixtures. no structural changes. work in 1437 sacramento only.Details
convert bathroom to master bathroom. remodel kitchen to include cabinets and fixtures. no structural changes. work in 1437 sacramento only. | $15,000 |
| Feb 28, 2008 | Completed final sign-off May 2008 | 18 Joy St | shower remove and replaced with bathtub and shower, toilet replaced with low flow, old sink replaced, install exhaust fan, electrical outlet, tile around bath and showerDetails
shower remove and replaced with bathtub and shower, toilet replaced with low flow, old sink replaced, install exhaust fan, electrical outlet, tile around bath and shower | $6,500 |
| Feb 28, 2006 | Never finaled issued Feb 2006, no final | 119 Pierce St | reinforce existing 3rd floor bathroom floor.Details
reinforce existing 3rd floor bathroom floor. | $15,000 |
| Jan 12, 2006 | Completed final sign-off Aug 2006 | 119 Pierce St | kitchen and bath remodel. all work to be within (e) envelope no changes to building footprint. no structural walls have been altered. new lighting.Details
kitchen and bath remodel. all work to be within (e) envelope no changes to building footprint. no structural walls have been altered. new lighting. | $10,000 |
| Dec 2, 2004 | Completed final sign-off Mar 2005 | 20 Ventura Av | kitchen remodeling at 2nd master bathroom. remodel master bedroom closet made larger at 3rd floor.Details
kitchen remodeling at 2nd master bathroom. remodel master bedroom closet made larger at 3rd floor. | $20,000 |
| Oct 14, 2004 | Completed final sign-off Feb 2005 | 294 Parker Av | intrior remodel: 1 bathroom and 1 kitchen with new cabinet and ne fixtures, new dry wall on each uniDetails
intrior remodel: 1 bathroom and 1 kitchen with new cabinet and ne fixtures, new dry wall on each uni | $20,000 |