Back to kitchen remodel contractors
Peng Fei Tan
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to May 2016
- Last 24 months
- 0 permits filed
41 permits since 2000: 35 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 15 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2016 | Completed final sign-off Apr 2017 | 1955 29th Av | frist floor: to add a bedroom & a full bathroom, 2nd flr: remodel kitchen and bathroom on 2nd floor.Details
frist floor: to add a bedroom & a full bathroom, 2nd flr: remodel kitchen and bathroom on 2nd floor. | $36,000 |
| Jul 22, 2014 | Completed final sign-off Sep 2015 | 1630 32nd Av | garage door widening and push garage door inside & higher, add separate wall in garage area, add decorative balcony & kitchen remodel.Details
garage door widening and push garage door inside & higher, add separate wall in garage area, add decorative balcony & kitchen remodel. | $5,000 |
| Apr 14, 2014 | Completed final sign-off Aug 2014 | 1789 08th Av | kitchen, bathroom remodel (same to same). no layout change.Details
kitchen, bathroom remodel (same to same). no layout change. | $13,000 |
| Dec 3, 2013 | Completed final sign-off Mar 2014 | 2638 Phelps St | 1/f: add 1 bedroom, full bath and storage room. 2/f: romodel kitchen and bath.Details
1/f: add 1 bedroom, full bath and storage room. 2/f: romodel kitchen and bath. | $54,000 |
| Nov 27, 2013 | Completed final sign-off Jun 2014 | 843 35th Av | revision for application #2013.06.03.8503. kitchen remodel, two bedrooms and one office remodel at 2nd floor. change to a straight run stairway between 1st and 2nd floor.Details
revision for application #2013.06.03.8503. kitchen remodel, two bedrooms and one office remodel at 2nd floor. change to a straight run stairway between 1st and 2nd floor. | $20,000 |
| Nov 7, 2013 | Completed final sign-off Mar 2014 | 1791 08th Av | 3rd floor: remodel kitchen and bath. rearrange plumbing fixturesDetails
3rd floor: remodel kitchen and bath. rearrange plumbing fixtures | $10,000 |
| May 9, 2012 | Completed final sign-off Jan 2013 | 79 Putnam St | revised to appn. 200809262704; enlarged bathroom area, add wall heat, 2. relocated kitchen counter, 3, relocated closet, 4. remain (e) window and reduced propsed glass area at front entrance, 5. 1-5/8" gyp board type "x" at property line insideDetails
revised to appn. 200809262704; enlarged bathroom area, add wall heat, 2. relocated kitchen counter, 3, relocated closet, 4. remain (e) window and reduced propsed glass area at front entrance, 5. 1-5/8" gyp board type "x" at property line inside | |
| Sep 23, 2010 | Expired or cancelled expired Jan 2013 | 10 Bannan Pl | rev. to pa# 2009.12.31.4083. relocation of new bathroom and kitchen. delete new half bath. replace plaster wall to install r-13 insulation and install 5/8" gyp bd on all wallsDetails
rev. to pa# 2009.12.31.4083. relocation of new bathroom and kitchen. delete new half bath. replace plaster wall to install r-13 insulation and install 5/8" gyp bd on all walls | $30,000 |
| May 8, 2008 | Completed final sign-off Sep 2008 | 1437 Sacramento St | convert bathroom to master bathroom. remodel kitchen to include cabinets and fixtures. no structural changes. work in 1437 sacramento only.Details
convert bathroom to master bathroom. remodel kitchen to include cabinets and fixtures. no structural changes. work in 1437 sacramento only. | $15,000 |
| Jan 4, 2008 | Completed final sign-off Mar 2008 | 1322 Ulloa St | kitchen remodel only. approx 11' x 12'. remove (e) cabinet, flooring, drywall. new plumbing & electrical according to the city code & title 24. new drywall. new cabinet, new plumbing & electrical fixture. new flooring, new appliances.Details
kitchen remodel only. approx 11' x 12'. remove (e) cabinet, flooring, drywall. new plumbing & electrical according to the city code & title 24. new drywall. new cabinet, new plumbing & electrical fixture. new flooring, new appliances. | $15,000 |
| Jun 27, 2007 | Completed final sign-off Jan 2008 | 2463 46th Av | kitchen remodel only, altleat 50% light wallage must be florescedbtm r-13min insulation for wall. r-19 min for celing. exhaust termination 3 min form p.l. and bldg opening.Details
kitchen remodel only, altleat 50% light wallage must be florescedbtm r-13min insulation for wall. r-19 min for celing. exhaust termination 3 min form p.l. and bldg opening. | $8,000 |
| Jan 12, 2006 | Completed final sign-off Aug 2006 | 119 Pierce St | kitchen and bath remodel. all work to be within (e) envelope no changes to building footprint. no structural walls have been altered. new lighting.Details
kitchen and bath remodel. all work to be within (e) envelope no changes to building footprint. no structural walls have been altered. new lighting. | $10,000 |
| Oct 26, 2005 | Completed final sign-off Nov 2006 | 1865 Golden Gate Av | kitchen remodel. all work to be within (e) building envelope. no change to building footprint. no structural walls have been altered.Details
kitchen remodel. all work to be within (e) building envelope. no change to building footprint. no structural walls have been altered. | $5,000 |
| Jun 9, 2005 | Completed final sign-off Mar 2006 | 420 Connecticut St | interior one kitchen remodel:remove (e) new plumbing and new electric for kitchen. insulation andDetails
interior one kitchen remodel:remove (e) new plumbing and new electric for kitchen. insulation and | $12,500 |
| Dec 2, 2004 | Completed final sign-off Mar 2005 | 20 Ventura Av | kitchen remodeling at 2nd master bathroom. remodel master bedroom closet made larger at 3rd floor.Details
kitchen remodeling at 2nd master bathroom. remodel master bedroom closet made larger at 3rd floor. | $20,000 |
| Oct 14, 2004 | Completed final sign-off Feb 2005 | 294 Parker Av | intrior remodel: 1 bathroom and 1 kitchen with new cabinet and ne fixtures, new dry wall on each uniDetails
intrior remodel: 1 bathroom and 1 kitchen with new cabinet and ne fixtures, new dry wall on each uni | $20,000 |