Patrick Uniacke
- Based in
- San Bruno
- On San Francisco permits
- Jun 2010 to May 2025
- Last 24 months
- 1 permit filed
39 permits since 2000: 26 completed, 1 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 98 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2024 | Completed final sign-off Sep 2024 | 39 Treasure Island Rd | construction of temporary (1-day) scaffolding/emergency exit stair in parking lot for concert venue per sffd operations request.Details
construction of temporary (1-day) scaffolding/emergency exit stair in parking lot for concert venue per sffd operations request. | $10,000 |
| Dec 17, 2018 | Completed final sign-off Sep 2020 | 1545 Pine St | unit 101: first time t.i.:outpatient pvt med office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom,ada accessbile platform, lift, new stairs and mezz level, (n) lithging and power/data; finishes throughout. mep+l/s+f/s sep permits.Details
unit 101: first time t.i.:outpatient pvt med office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom,ada accessbile platform, lift, new stairs and mezz level, (n) lithging and power/data; finishes throughout. mep+l/s+f/s sep permits. | $220,000 |
| Aug 16, 2013 | Completed final sign-off Mar 2015 | 15 West Portal Av | revision to 2013-02-25-0889 addition of 111 sf on 2nd floor. enclosure of stairs to roof and addition of equipment room on roof.Details
revision to 2013-02-25-0889 addition of 111 sf on 2nd floor. enclosure of stairs to roof and addition of equipment room on roof. | $6,000 |
| Jun 30, 2010 | Completed final sign-off Nov 2010 | 360 09th Av | remodel (e) 2nd fl classrooms and spaces into a single classroom. add new base cabinets, flooring,and lighting. replace (e) guard rail and handrail at exterior balcony and stairs. fire alarm on separate permit.Details
remodel (e) 2nd fl classrooms and spaces into a single classroom. add new base cabinets, flooring,and lighting. replace (e) guard rail and handrail at exterior balcony and stairs. fire alarm on separate permit. | $135,000 |