Back to bathroom remodel contractors
Patrick Uniacke
- Based in
- San Bruno
- On San Francisco permits
- Jun 2010 to May 2025
- Last 24 months
- 1 permit filed
39 permits since 2000: 26 completed, 1 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 120 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2023 | Completed final sign-off Aug 2024 | 2370 39th Av | remodel existing garage to create 1 new bedroom and 1 new bathroom. relocattion of existing laundry roomDetails
remodel existing garage to create 1 new bedroom and 1 new bathroom. relocattion of existing laundry room | $40,000 |
| Dec 17, 2018 | Completed final sign-off Sep 2020 | 1545 Pine St | unit 101: first time t.i.:outpatient pvt med office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom,ada accessbile platform, lift, new stairs and mezz level, (n) lithging and power/data; finishes throughout. mep+l/s+f/s sep permits.Details
unit 101: first time t.i.:outpatient pvt med office.(n) ceiling, partitions,doors and hardware, millwork,flooring, ada accessible bathroom,ada accessbile platform, lift, new stairs and mezz level, (n) lithging and power/data; finishes throughout. mep+l/s+f/s sep permits. | $220,000 |