Parkin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2026
- Last 24 months
- 14 permits filed
62 permits since 2000: 38 completed, 15 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 5 completed, 3 in progress. Typically 9 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2025 | In progress issued Sep 2025 | 1119 Gilman Av | in-fill rear section underneath the (e) cantilever structure on 2/f. add (n) bedrooms, family room, entertainment area, & bathroom on 1/f. add new rear staircase on 2/f.Details
in-fill rear section underneath the (e) cantilever structure on 2/f. add (n) bedrooms, family room, entertainment area, & bathroom on 1/f. add new rear staircase on 2/f. | $150,000 |
| Oct 18, 2024 | In progress issued Oct 2024 | 71 Valley St | (front building) repair dryrot at rear stairs. replace in like kind. replace less than 50%. replace and repair rails. complaint# 2024-26262.Details
(front building) repair dryrot at rear stairs. replace in like kind. replace less than 50%. replace and repair rails. complaint# 2024-26262. | $15,000 |
| Oct 15, 2024 | Completed final sign-off Mar 2026 | 2609 Pine St | replace part of existing foundaion; voluntary seismic retrofit; new interior stairs; remoe existing rear deckDetails
replace part of existing foundaion; voluntary seismic retrofit; new interior stairs; remoe existing rear deck | $300,000 |
| Dec 21, 2021 | Completed final sign-off Aug 2022 | 212 Clement St | for general exterior maintenence, repair as neede, including flashing, existing gutters and rain water leaders and roof flashing & roof patching minor dryrot repairs of existing wood siding repairs to match existing repair existing exterior stairs less 50% all work not visible from street.Details
for general exterior maintenence, repair as neede, including flashing, existing gutters and rain water leaders and roof flashing & roof patching minor dryrot repairs of existing wood siding repairs to match existing repair existing exterior stairs less 50% all work not visible from street. | $25,000 |
| Jul 7, 2021 | In progress issued Nov 2024 | 672 28th St | horizontal additional at rear of single-family dwelling including: expand (e) 3rd story to rear over (e) flat roof for 2 (n) bedrooms & bathrooms, den, rear & light-well roof decks, & (n) interior stair to (n) roof deck above 3rd story w/ skylight accessDetails
horizontal additional at rear of single-family dwelling including: expand (e) 3rd story to rear over (e) flat roof for 2 (n) bedrooms & bathrooms, den, rear & light-well roof decks, & (n) interior stair to (n) roof deck above 3rd story w/ skylight access | $1,132,000 |
| Dec 17, 2020 | Completed final sign-off Mar 2022 | 1266 Treat Av | remove bearing wall at 2nd floor and connect 2nd & 1st floor (garage) with new stairs. add a bath at 2nd fl.Details
remove bearing wall at 2nd floor and connect 2nd & 1st floor (garage) with new stairs. add a bath at 2nd fl. | $15,000 |
| Oct 31, 2018 | Completed final sign-off Oct 2019 | 115 Cambridge St | remodel kitchen and bathroom, construct a real deck with stairs on 2nd floor. add a family room, a bedroom and a full bathroom on 1st floor. replace furnace and water heaterDetails
remodel kitchen and bathroom, construct a real deck with stairs on 2nd floor. add a family room, a bedroom and a full bathroom on 1st floor. replace furnace and water heater | $50,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 101 Sweeny St | add stairway at rear to 2nd floor. add 3 bedrooms, 2 baths, wet bar and relocate washer & dryer at 1st floor per planDetails
add stairway at rear to 2nd floor. add 3 bedrooms, 2 baths, wet bar and relocate washer & dryer at 1st floor per plan | $51,200 |