Parkin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2026
- Last 24 months
- 14 permits filed
62 permits since 2000: 38 completed, 15 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 34 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | Completed final sign-off Mar 2026 | 2609 Pine St | replace part of existing foundaion; voluntary seismic retrofit; new interior stairs; remoe existing rear deckDetails
replace part of existing foundaion; voluntary seismic retrofit; new interior stairs; remoe existing rear deck | $300,000 |
| Jul 5, 2023 | Completed final sign-off Sep 2023 | 105 Fillmore St | general maintenance - repair dry rot, replace in kind. less than 50%. use pressure treated lumber. rear of house. deck structuresDetails
general maintenance - repair dry rot, replace in kind. less than 50%. use pressure treated lumber. rear of house. deck structures | $8,000 |
| Feb 6, 2020 | Completed final sign-off Apr 2022 | 601 Arkansas St | construction phase change under pa 2001-0326-5166. deck restored to extent shown on pa 2001-0326-5166. extend office beyond scope of pa 2001-0326-5166Details
construction phase change under pa 2001-0326-5166. deck restored to extent shown on pa 2001-0326-5166. extend office beyond scope of pa 2001-0326-5166 | $1,000 |
| Oct 31, 2018 | Completed final sign-off Oct 2019 | 115 Cambridge St | remodel kitchen and bathroom, construct a real deck with stairs on 2nd floor. add a family room, a bedroom and a full bathroom on 1st floor. replace furnace and water heaterDetails
remodel kitchen and bathroom, construct a real deck with stairs on 2nd floor. add a family room, a bedroom and a full bathroom on 1st floor. replace furnace and water heater | $50,000 |