Back to bathroom remodel contractors
Parkin Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2026
- Last 24 months
- 14 permits filed
62 permits since 2000: 38 completed, 15 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 12 completed, 5 in progress, 2 never finaled, 3 expired or cancelled. Typically 3 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2026 | In progress issued Mar 2026 | 248 Naples St | revision to # 202509266243: 1f - remodel (e) master bedroom, (e) bathroom. add (n) media room, entertainment area w/ wetbar. 2/f - add (n) bedroom. remodel (e) kitchen, dining, master bedroom, living room & bathroom. light-well infill & replace exterior dry-rot wall like to like.Details
revision to # 202509266243: 1f - remodel (e) master bedroom, (e) bathroom. add (n) media room, entertainment area w/ wetbar. 2/f - add (n) bedroom. remodel (e) kitchen, dining, master bedroom, living room & bathroom. light-well infill & replace exterior dry-rot wall like to like. | $200,000 |
| Sep 26, 2025 | In progress issued Sep 2025 | 248 Naples St | replace all plumbing and electrical, remodel 3 bathrooms, 1 kitchen in kind. like for like. remove sheetrock and insulate.Details
replace all plumbing and electrical, remodel 3 bathrooms, 1 kitchen in kind. like for like. remove sheetrock and insulate. | $12,000 |
| Sep 16, 2025 | In progress issued Sep 2025 | 1119 Gilman Av | in-fill rear section underneath the (e) cantilever structure on 2/f. add (n) bedrooms, family room, entertainment area, & bathroom on 1/f. add new rear staircase on 2/f.Details
in-fill rear section underneath the (e) cantilever structure on 2/f. add (n) bedrooms, family room, entertainment area, & bathroom on 1/f. add new rear staircase on 2/f. | $150,000 |
| Jul 24, 2024 | Expired or cancelled expired Mar 2026 | 2609 Pine St | addition of (n) bathroom and remove (e) non functional fireplace.Details
addition of (n) bathroom and remove (e) non functional fireplace. | $25,000 |
| Nov 20, 2023 | In progress issued Nov 2023 | 875 Francisco St | demo & remodel (2) bathrooms. replace fixtures like for like. no strucutural.Details
demo & remodel (2) bathrooms. replace fixtures like for like. no strucutural. | $20,000 |
| Nov 20, 2023 | Completed final sign-off Mar 2026 | 2609 Pine St | remode 1 kitchen & 1 bathroom. replace electrical & plumbing fixtures in like for like kind.Details
remode 1 kitchen & 1 bathroom. replace electrical & plumbing fixtures in like for like kind. | $35,000 |
| Mar 10, 2023 | Completed final sign-off Aug 2023 | 5544 Diamond Heights Bl | remodel bathroom down to studs - shower pan. new shower valve, toilet, and sink. install new fan - lights. remove rear siding - replace in kind.Details
remodel bathroom down to studs - shower pan. new shower valve, toilet, and sink. install new fan - lights. remove rear siding - replace in kind. | $18,000 |
| Apr 19, 2022 | Completed final sign-off Jan 2024 | 254 28th St | front bldg -to comply with nov#202010302. legalize wet bar and bathroom at 2/f. remove illegal bathroom & bedroom at 1/fDetails
front bldg -to comply with nov#202010302. legalize wet bar and bathroom at 2/f. remove illegal bathroom & bedroom at 1/f | $50,000 |
| Apr 14, 2022 | Completed final sign-off Sep 2022 | 4229 Cabrillo St | remodel one kitcehn- 2 bathroom one 1/2 bath. no change in location. replace knob tube. replace gal pipe and cast iron.Details
remodel one kitcehn- 2 bathroom one 1/2 bath. no change in location. replace knob tube. replace gal pipe and cast iron. | $15,000 |
| Sep 21, 2021 | Completed final sign-off Sep 2023 | 262 Waller St | remove and replace: one kitchen and 2 bathrooms. upgrade plumbing and electrical. non structural. lighting shall comply with cec 150.0 (k)Details
remove and replace: one kitchen and 2 bathrooms. upgrade plumbing and electrical. non structural. lighting shall comply with cec 150.0 (k) | $15,000 |
| Jul 7, 2021 | In progress issued Nov 2024 | 672 28th St | horizontal additional at rear of single-family dwelling including: expand (e) 3rd story to rear over (e) flat roof for 2 (n) bedrooms & bathrooms, den, rear & light-well roof decks, & (n) interior stair to (n) roof deck above 3rd story w/ skylight accessDetails
horizontal additional at rear of single-family dwelling including: expand (e) 3rd story to rear over (e) flat roof for 2 (n) bedrooms & bathrooms, den, rear & light-well roof decks, & (n) interior stair to (n) roof deck above 3rd story w/ skylight access | $1,132,000 |
| Jun 18, 2021 | Expired or cancelled expired Jun 2026 | 130 Maywood Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s). | $40,000 |
| Mar 29, 2021 | Never finaled issued May 2023, no final | 317 Rutledge St | vert & horiz addition to an (e) non-historic sfr. will create a a fully sprinklered single fam res. 4 bed & 4.5 baths, parking for one car, two cargo bikers, and site improvements. the maximum depth of excavation shall be 8' and total soil disturbance shall be 166 cubic yards. site permit.Details
vert & horiz addition to an (e) non-historic sfr. will create a a fully sprinklered single fam res. 4 bed & 4.5 baths, parking for one car, two cargo bikers, and site improvements. the maximum depth of excavation shall be 8' and total soil disturbance shall be 166 cubic yards. site permit. | $450,000 |
| Jan 28, 2021 | Never finaled issued May 2023, no final | 315 Rutledge St | (n) construction on an empty lot, 3-story over basement single family home, (4) bed (3.5) bath, fully sprinklered, 2-car parking, excavation in excess of 100 cy, conforming, no zoning variances, demolish (e) retaining wall, add (n) curb cut, (n) utilities.Details
(n) construction on an empty lot, 3-story over basement single family home, (4) bed (3.5) bath, fully sprinklered, 2-car parking, excavation in excess of 100 cy, conforming, no zoning variances, demolish (e) retaining wall, add (n) curb cut, (n) utilities. | $650,000 |
| Dec 17, 2020 | Completed final sign-off Mar 2022 | 1266 Treat Av | remove bearing wall at 2nd floor and connect 2nd & 1st floor (garage) with new stairs. add a bath at 2nd fl.Details
remove bearing wall at 2nd floor and connect 2nd & 1st floor (garage) with new stairs. add a bath at 2nd fl. | $15,000 |
| Jun 12, 2020 | Expired or cancelled cancelled Jan 2026 | 44 Mirabel Av | remodel kitchen & 2 bathroomsDetails
remodel kitchen & 2 bathrooms | $26,000 |
| May 26, 2020 | Completed final sign-off Sep 2020 | 153 28th St | remodel kitchen and bathroom like for likeDetails
remodel kitchen and bathroom like for like | $15,000 |
| Oct 21, 2019 | Completed final sign-off Jun 2021 | 800 Carolina St | horizontal addition & interior renovation: add storage rm to basement, redesign interior layout on 1st & 2nd flr, add bay & new windows to facade, add laundry & bathroom to the 2nd flr and enlarge the master rm. replace all exterior doors & windows.Details
horizontal addition & interior renovation: add storage rm to basement, redesign interior layout on 1st & 2nd flr, add bay & new windows to facade, add laundry & bathroom to the 2nd flr and enlarge the master rm. replace all exterior doors & windows. | $200,000 |
| Aug 12, 2019 | Completed final sign-off Jun 2021 | 800 Carolina St | remodel bathroom (2) & kitchen (1). new electrical and plumbing throughout, new doors (use existing frames), new flooring. replace boilder, new 200a panel.Details
remodel bathroom (2) & kitchen (1). new electrical and plumbing throughout, new doors (use existing frames), new flooring. replace boilder, new 200a panel. | $25,000 |
| Dec 13, 2018 | Completed final sign-off Aug 2019 | 4229 Cabrillo St | to comply with nov 201879341 - remove bathroom, sink & partitions wall at 1st floorDetails
to comply with nov 201879341 - remove bathroom, sink & partitions wall at 1st floor | $3,000 |
| Oct 31, 2018 | Completed final sign-off Oct 2019 | 115 Cambridge St | remodel kitchen and bathroom, construct a real deck with stairs on 2nd floor. add a family room, a bedroom and a full bathroom on 1st floor. replace furnace and water heaterDetails
remodel kitchen and bathroom, construct a real deck with stairs on 2nd floor. add a family room, a bedroom and a full bathroom on 1st floor. replace furnace and water heater | $50,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 101 Sweeny St | add stairway at rear to 2nd floor. add 3 bedrooms, 2 baths, wet bar and relocate washer & dryer at 1st floor per planDetails
add stairway at rear to 2nd floor. add 3 bedrooms, 2 baths, wet bar and relocate washer & dryer at 1st floor per plan | $51,200 |