Paragon Management
- Based in
- Daly City
- On San Francisco permits
- Dec 2008 to Jun 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 383 days from filing to permit and 25 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2014 | Completed final sign-off Aug 2014 | 10 Brighton Av | add interior stair connects 1st & 2nd fl. add new laundry hook up. replace furnace.Details
add interior stair connects 1st & 2nd fl. add new laundry hook up. replace furnace. | $5,000 |
| May 27, 2010 | Completed final sign-off May 2012 | 236 Leavenworth St | nov #200565702; repair rear stair (rise, run & guardrails) less than 50%. repair repair window @ 1st. flr., cover window opening w/ stucco. replace bathroom vent @ 1st. flr. bathrm. patch clg. sheetrock between 1st. flr. & 2nd. flr.Details
nov #200565702; repair rear stair (rise, run & guardrails) less than 50%. repair repair window @ 1st. flr., cover window opening w/ stucco. replace bathroom vent @ 1st. flr. bathrm. patch clg. sheetrock between 1st. flr. & 2nd. flr. | $2,500 |