Paragon Management
- Based in
- Daly City
- On San Francisco permits
- Dec 2008 to Jun 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2015 | Completed final sign-off Apr 2015 | 559 26th Av | kitchen & bathroom remodel, relocate sub panel install recessed lighting, no walls moved, removed or added, all layouts to remain unchanged.Details
kitchen & bathroom remodel, relocate sub panel install recessed lighting, no walls moved, removed or added, all layouts to remain unchanged. | $20,000 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 557 26th Av | remodel kitchen, update elecrical, relocate subpanel, bathroom remodel. replace bathtub, update plumbing, update elecrical. replacing bathroom window and 2 bedroom windows. no structural work will be done.Details
remodel kitchen, update elecrical, relocate subpanel, bathroom remodel. replace bathtub, update plumbing, update elecrical. replacing bathroom window and 2 bedroom windows. no structural work will be done. | $15,000 |
| Nov 17, 2010 | Completed final sign-off May 2011 | 2790 19th Av | 2 bathroom remodeling, replace bath tub, bath aucet, toilet, cabinets, sink, tiles and paint, no change to lighting, repl 1 kitchen counter top, sink and faucet, repl kitchen floor tile, no door and no window & no wall work on this permitDetails
2 bathroom remodeling, replace bath tub, bath aucet, toilet, cabinets, sink, tiles and paint, no change to lighting, repl 1 kitchen counter top, sink and faucet, repl kitchen floor tile, no door and no window & no wall work on this permit | $6,500 |
| May 27, 2010 | Completed final sign-off May 2012 | 236 Leavenworth St | nov #200565702; repair rear stair (rise, run & guardrails) less than 50%. repair repair window @ 1st. flr., cover window opening w/ stucco. replace bathroom vent @ 1st. flr. bathrm. patch clg. sheetrock between 1st. flr. & 2nd. flr.Details
nov #200565702; repair rear stair (rise, run & guardrails) less than 50%. repair repair window @ 1st. flr., cover window opening w/ stucco. replace bathroom vent @ 1st. flr. bathrm. patch clg. sheetrock between 1st. flr. & 2nd. flr. | $2,500 |
| Dec 23, 2008 | Completed final sign-off May 2009 | 190 02nd Av | wokr @ unit# 190 only. alteration to existing 3rd. floor. (190-2nd. ave.) 1. to add on new full bathroom on 3rd. floor. 2. remodel 3rd. floor existing kitchen & bathroom. 3. install 1 new furnace to provide heating for all 3rd. floor habitable rooms. 4. remove all existing (5) heaters on 3rd. floor.Details
wokr @ unit# 190 only. alteration to existing 3rd. floor. (190-2nd. ave.) 1. to add on new full bathroom on 3rd. floor. 2. remodel 3rd. floor existing kitchen & bathroom. 3. install 1 new furnace to provide heating for all 3rd. floor habitable rooms. 4. remove all existing (5) heaters on 3rd. floor. | $22,000 |