Back to kitchen remodel contractors
Paragon Management
- Based in
- Daly City
- On San Francisco permits
- Dec 2008 to Jun 2016
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2016 | Completed final sign-off Jul 2016 | 2295 Vallejo St | #403 - kitchen remodel; removal hall closet. new recessed ledlight, new cabinets, sink, countertop & appliancesDetails
#403 - kitchen remodel; removal hall closet. new recessed ledlight, new cabinets, sink, countertop & appliances | $12,000 |
| Feb 4, 2015 | Completed final sign-off Apr 2015 | 559 26th Av | kitchen & bathroom remodel, relocate sub panel install recessed lighting, no walls moved, removed or added, all layouts to remain unchanged.Details
kitchen & bathroom remodel, relocate sub panel install recessed lighting, no walls moved, removed or added, all layouts to remain unchanged. | $20,000 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 557 26th Av | remodel kitchen, update elecrical, relocate subpanel, bathroom remodel. replace bathtub, update plumbing, update elecrical. replacing bathroom window and 2 bedroom windows. no structural work will be done.Details
remodel kitchen, update elecrical, relocate subpanel, bathroom remodel. replace bathtub, update plumbing, update elecrical. replacing bathroom window and 2 bedroom windows. no structural work will be done. | $15,000 |
| Jul 8, 2014 | Completed final sign-off Aug 2014 | 222 Diamond St | kitchen remodel, replace cabinets and countertop. update elect. replace dish washer. no structural work.Details
kitchen remodel, replace cabinets and countertop. update elect. replace dish washer. no structural work. | $14,000 |
| Nov 17, 2010 | Completed final sign-off May 2011 | 2790 19th Av | 2 bathroom remodeling, replace bath tub, bath aucet, toilet, cabinets, sink, tiles and paint, no change to lighting, repl 1 kitchen counter top, sink and faucet, repl kitchen floor tile, no door and no window & no wall work on this permitDetails
2 bathroom remodeling, replace bath tub, bath aucet, toilet, cabinets, sink, tiles and paint, no change to lighting, repl 1 kitchen counter top, sink and faucet, repl kitchen floor tile, no door and no window & no wall work on this permit | $6,500 |
| Jan 26, 2010 | Completed final sign-off Jun 2010 | 148 Ellert St | remodel (e) 2nd floor kitchen. (replace (e) lighting, plumbing, counter, sink. remove & replace load bearing wall (support existing ceiling joist) between 2nd floor kitchen and living room by new beam glb.Details
remodel (e) 2nd floor kitchen. (replace (e) lighting, plumbing, counter, sink. remove & replace load bearing wall (support existing ceiling joist) between 2nd floor kitchen and living room by new beam glb. | $12,000 |
| May 1, 2009 | Completed final sign-off Mar 2010 | 505 Molimo Dr | remodel (e) kitchen. remove (e) bearing wall and install new beam for support, per ref. approved pa #200810285316.Details
remodel (e) kitchen. remove (e) bearing wall and install new beam for support, per ref. approved pa #200810285316. | $20,000 |
| Dec 23, 2008 | Completed final sign-off May 2009 | 190 02nd Av | wokr @ unit# 190 only. alteration to existing 3rd. floor. (190-2nd. ave.) 1. to add on new full bathroom on 3rd. floor. 2. remodel 3rd. floor existing kitchen & bathroom. 3. install 1 new furnace to provide heating for all 3rd. floor habitable rooms. 4. remove all existing (5) heaters on 3rd. floor.Details
wokr @ unit# 190 only. alteration to existing 3rd. floor. (190-2nd. ave.) 1. to add on new full bathroom on 3rd. floor. 2. remodel 3rd. floor existing kitchen & bathroom. 3. install 1 new furnace to provide heating for all 3rd. floor habitable rooms. 4. remove all existing (5) heaters on 3rd. floor. | $22,000 |