Back to kitchen remodel contractors
Pacific Rim Design + Build
- Based in
- San Francisco
- On San Francisco permits
- Feb 2016 to Apr 2022
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 48 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2020 | Completed final sign-off May 2021 | 682 Haight St | renovation of (e) ground floor restaurant including: converting sushi bar to cocktail bar; updating some kitchen equipment; updating some decorative finishes; upgrade hood exhaust & mua; replace some lighting fixtures for high efficacy fixtures; new floor sink & floor drain at bar.Details
renovation of (e) ground floor restaurant including: converting sushi bar to cocktail bar; updating some kitchen equipment; updating some decorative finishes; upgrade hood exhaust & mua; replace some lighting fixtures for high efficacy fixtures; new floor sink & floor drain at bar. | $188,676 |
| Jun 6, 2019 | Completed final sign-off Sep 2019 | 532 Jessie St | renovation of extg commissary kitchen, include 2 new hoos, new equipment, ada restroom renovation, new roof equipment, new front window.Details
renovation of extg commissary kitchen, include 2 new hoos, new equipment, ada restroom renovation, new roof equipment, new front window. | $85,000 |
| Apr 15, 2019 | Completed final sign-off Oct 2022 | 1030 Polk St | change of use: tenant improvement - limited restaurant - new kitchen, new restrooms, new lighting, new customer services counter, new dining area, new side exit door. .Details
change of use: tenant improvement - limited restaurant - new kitchen, new restrooms, new lighting, new customer services counter, new dining area, new side exit door. . | $225,000 |
| Feb 6, 2017 | Completed final sign-off Jun 2018 | 1906 Market St | change of use/tenant improvement from laundromat to restaurant. demo of (e) laundromat, install (n) kitchen, dining, accessible restroom, (n) lighting, (n) front door, remove (e) exterior awning, no change to square footageDetails
change of use/tenant improvement from laundromat to restaurant. demo of (e) laundromat, install (n) kitchen, dining, accessible restroom, (n) lighting, (n) front door, remove (e) exterior awning, no change to square footage | $150,000 |
| Sep 22, 2016 | Never finaled issued Oct 2016, no final | 758 Valencia St | ti of (e) restaurant including plumbing, electrical, kitchen equipment, cabinets, new lighting. not included - hvac/mechanical work, exterior doors and windowsDetails
ti of (e) restaurant including plumbing, electrical, kitchen equipment, cabinets, new lighting. not included - hvac/mechanical work, exterior doors and windows | $125,000 |