Back to bathroom remodel contractors
Pacific General Construction
- Based in
- Milipitas
- On San Francisco permits
- May 2000 to Feb 2020
- Last 24 months
- 0 permits filed
51 permits since 2000: 32 completed, 11 never finaled, 8 expired or cancelled.
Of the 11 never-finaled permits, 1 is 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 3 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2018 | Completed final sign-off Dec 2018 | 2730 Octavia St | kitchen remodel. replace cabinets, counters, appliances, flooring, light fixtures. bath remodel. cabinets, light fixtures, faucet, toilet, tub.Details
kitchen remodel. replace cabinets, counters, appliances, flooring, light fixtures. bath remodel. cabinets, light fixtures, faucet, toilet, tub. | $22,000 |
| Mar 15, 2016 | Completed final sign-off Oct 2016 | 1 Market St | revision to pa #2015-0814-4307 - reconfiguration of space due to reduction of square footage. changing internal access to studio, bathroom & storage locations, ada ramps.Details
revision to pa #2015-0814-4307 - reconfiguration of space due to reduction of square footage. changing internal access to studio, bathroom & storage locations, ada ramps. | |
| Nov 15, 2013 | Completed final sign-off Mar 2014 | 1801 Gough St | unit # 403: remove non-bearing walls. add laundry outlet, and a den and a closet. relocate extg kitchen fixutures and cabs. remodel bathroom.Details
unit # 403: remove non-bearing walls. add laundry outlet, and a den and a closet. relocate extg kitchen fixutures and cabs. remodel bathroom. | $6,000 |
| Oct 31, 2013 | Completed final sign-off Jan 2014 | 1840 Clay St | unit #403-remodel bathroom, relocate kitchen with new cabinets, remove non bearing walls- relocating a bedroom, escape rescue window provided with door to stairwellDetails
unit #403-remodel bathroom, relocate kitchen with new cabinets, remove non bearing walls- relocating a bedroom, escape rescue window provided with door to stairwell | $30,000 |
| Oct 31, 2013 | Completed final sign-off Jan 2014 | 1801 Gough St | unit #203-remodel bathroom, relocate kitchen, painting, remove non bearing walls. new kitchen cabinetsDetails
unit #203-remodel bathroom, relocate kitchen, painting, remove non bearing walls. new kitchen cabinets | $30,000 |