Pacific General Construction
- Based in
- Milipitas
- On San Francisco permits
- May 2000 to Feb 2020
- Last 24 months
- 0 permits filed
51 permits since 2000: 32 completed, 11 never finaled, 8 expired or cancelled.
Of the 11 never-finaled permits, 1 is 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 554 days from filing to permit and 489 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2013 | Completed final sign-off Jan 2016 | 722 Montgomery St | rev 200501253986. change hotaling facade mat'l from used brick to stucco; stucco wall & wood window w/metal-clad exterior at n & s light courts; install fire-rated insulated metal panels at n & s lotline walls; (n) elevator access & deck at r/f; (n) s lotline wdw; c201062370 & revise floor layoutDetails
rev 200501253986. change hotaling facade mat'l from used brick to stucco; stucco wall & wood window w/metal-clad exterior at n & s light courts; install fire-rated insulated metal panels at n & s lotline walls; (n) elevator access & deck at r/f; (n) s lotline wdw; c201062370 & revise floor layout | $10,000 |