Back to kitchen remodel contractors
P F Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Nov 2024
- Last 24 months
- 1 permit filed
126 permits since 2000: 109 completed, 1 in progress, 8 never finaled, 8 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 23 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2019 | Completed final sign-off Jan 2020 | 514 Myra Wy | due to water damage by wind. repair 2 bedroom drywall, ceiling wall, bathroom, kitchen, hallway, replace a furnace. a separate mechanical permit is required. no framing work/modification - no structural work.Details
due to water damage by wind. repair 2 bedroom drywall, ceiling wall, bathroom, kitchen, hallway, replace a furnace. a separate mechanical permit is required. no framing work/modification - no structural work. | $30,000 |
| Oct 1, 2018 | Completed final sign-off Jul 2019 | 984 Harrison St | all work in unit a. remove 8ft of linear internal wall; convert 1/2 bath to full bath, add door between kitchen and bedroom, create new wall, reconfigure 2 hall door ways (interior), replace kitchen cabinets. maher n/aDetails
all work in unit a. remove 8ft of linear internal wall; convert 1/2 bath to full bath, add door between kitchen and bedroom, create new wall, reconfigure 2 hall door ways (interior), replace kitchen cabinets. maher n/a | $2,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2019 | 1362 07th Av | 1st fl: convert e space to have a bedroom, den , family rm, full bath. 2nd fl: remodel e kitchen and bath. 3rd fl and 4th fl: remodel e bath, add 2 full bathsDetails
1st fl: convert e space to have a bedroom, den , family rm, full bath. 2nd fl: remodel e kitchen and bath. 3rd fl and 4th fl: remodel e bath, add 2 full baths | $100,000 |
| May 31, 2017 | Completed final sign-off Mar 2018 | 2008 Lombard St | unit b: interior remodel - kitchen and bathroom. add a bathroomDetails
unit b: interior remodel - kitchen and bathroom. add a bathroom | $20,000 |
| Feb 15, 2017 | Completed final sign-off Apr 2018 | 51 Moss St | 1st floor, #unit a: relocate bedrooms, remodel kitchen, bathroom, add a full bath. minor fooring repair. maher naDetails
1st floor, #unit a: relocate bedrooms, remodel kitchen, bathroom, add a full bath. minor fooring repair. maher na | $42,000 |
| Feb 15, 2017 | Completed final sign-off Apr 2018 | 51 Moss St | 2nd floor, #unit b: relocate bedrooms, remodel kitchen, bathroom, add a full bath. maher n/aDetails
2nd floor, #unit b: relocate bedrooms, remodel kitchen, bathroom, add a full bath. maher n/a | $40,000 |
| Jan 19, 2017 | Completed final sign-off Apr 2018 | 51 Moss St | 3rd floor #unit c: relocate bedrooms, remodel kitchen, bathroom, add a full bath. add 1 hr. rated egress passageway at garage level. n/a maher ordinanceDetails
3rd floor #unit c: relocate bedrooms, remodel kitchen, bathroom, add a full bath. add 1 hr. rated egress passageway at garage level. n/a maher ordinance | $45,000 |
| Jan 5, 2017 | Never finaled issued Jan 2017, no final | 2010 Lombard St | add a bath, remodel kitchen, and replace furnace on 2nd floor. n/a for maherDetails
add a bath, remodel kitchen, and replace furnace on 2nd floor. n/a for maher | $15,000 |
| Jun 28, 2016 | Completed final sign-off Feb 2019 | 505 Oak St | minor revision to pa#201402058987, interior remodel to revise kitchen layout, complete replace (e) #505 gas forced air heating system & relocate g/f utility room.Details
minor revision to pa#201402058987, interior remodel to revise kitchen layout, complete replace (e) #505 gas forced air heating system & relocate g/f utility room. | $5,000 |
| Feb 5, 2016 | Never finaled issued Mar 2016, no final | 505 Oak St | interior remodel of extg 3-story with garage, 3 unit apartment/unit #505 including. remodel of extg kitchen and 2 bathrooms. creation of master bedroom suite with new bathroom(within extg bedroom #2). removal/replacement of misc. interior non-load bearing partitions.Details
interior remodel of extg 3-story with garage, 3 unit apartment/unit #505 including. remodel of extg kitchen and 2 bathrooms. creation of master bedroom suite with new bathroom(within extg bedroom #2). removal/replacement of misc. interior non-load bearing partitions. | $62,500 |
| Sep 16, 2011 | Completed final sign-off Feb 2012 | 5358 Mission St | interior renovation for 2nd floor unit. comply with nov 201116241 e kitchen and bath with new, add mster bath, new interior finishes, replace e windows with new in kindDetails
interior renovation for 2nd floor unit. comply with nov 201116241 e kitchen and bath with new, add mster bath, new interior finishes, replace e windows with new in kind | $68,000 |
| May 2, 2011 | Completed final sign-off Sep 2011 | 222 Sadowa St | comply with notice of violation #201199586 dated 3/24/11 to remove illegal exterior door,interior door, kitchen counter. revert illegal living room and dining room back to storage and utility room.Details
comply with notice of violation #201199586 dated 3/24/11 to remove illegal exterior door,interior door, kitchen counter. revert illegal living room and dining room back to storage and utility room. | $2,000 |
| Apr 29, 2011 | Completed final sign-off Feb 2012 | 1727 Greenwich St | remodel (4) bath, (2) kitchens, replace (2) central heat at garage of two dwelling units. provide min. 50% of kitchen lighting in high efficacy lights. provide high efficacy lights or "manual on" occupancy sensor in bathroom.Details
remodel (4) bath, (2) kitchens, replace (2) central heat at garage of two dwelling units. provide min. 50% of kitchen lighting in high efficacy lights. provide high efficacy lights or "manual on" occupancy sensor in bathroom. | $50,000 |
| Jul 26, 2010 | Completed final sign-off Nov 2010 | 218 Sadowa St | remodel a kitchen and a bath, including lighting plugs; kitchen 10x10 sq. ft.; bath 5'x 8'Details
remodel a kitchen and a bath, including lighting plugs; kitchen 10x10 sq. ft.; bath 5'x 8' | $12,000 |
| Oct 22, 2008 | Completed final sign-off May 2009 | 538 11th Av | add a new master bath at master bedroom at 3rd floor. remodel a kitchen at 2nd floor. replace a furnace in kind at garageDetails
add a new master bath at master bedroom at 3rd floor. remodel a kitchen at 2nd floor. replace a furnace in kind at garage | $28,000 |
| Apr 11, 2007 | Completed final sign-off Oct 2007 | 1245 Jones St | unit 1247a only-comply w/title 24 energy codes. remodel bathrm-new flourscent lighting, ceiling. install insulation in walls. remodel kitchen-new ceiling lights, reposition sink (1 ft), new stove/appliances, new windows to code. billingsby windows/doors. no structural work.Details
unit 1247a only-comply w/title 24 energy codes. remodel bathrm-new flourscent lighting, ceiling. install insulation in walls. remodel kitchen-new ceiling lights, reposition sink (1 ft), new stove/appliances, new windows to code. billingsby windows/doors. no structural work. | $80,000 |
| Apr 4, 2007 | Completed final sign-off Nov 2007 | 575 11th Av | remodling two baths and kitchen.Details
remodling two baths and kitchen. | $20,000 |
| Feb 20, 2007 | Completed final sign-off Oct 2007 | 131 03rd Av | interior remodel-new family, bathrooms at 1st floor, new interior stair 2nd floor, kitchen remodel, relocate powder room, new master suite at 3rd floor. repair dry rot at rear of building. replace (e) furnace, extend (e) deck at 2nd floor, new sheetrock in areas of remodel.Details
interior remodel-new family, bathrooms at 1st floor, new interior stair 2nd floor, kitchen remodel, relocate powder room, new master suite at 3rd floor. repair dry rot at rear of building. replace (e) furnace, extend (e) deck at 2nd floor, new sheetrock in areas of remodel. | $80,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 2001 Grove St | work in unit# 12. remodel 1 kitchen & a bath. replace cabinets fixtures & appliances; patch sheet rock or plasters from rewiring. no structural work.Details
work in unit# 12. remodel 1 kitchen & a bath. replace cabinets fixtures & appliances; patch sheet rock or plasters from rewiring. no structural work. | $15,000 |
| Aug 15, 2005 | Completed final sign-off Mar 2006 | 343 14th Av | remodel 1 kitchen and 3 1/2 bathrooms, replace (e) furnace, bolt foundation of 32" each bolt,Details
remodel 1 kitchen and 3 1/2 bathrooms, replace (e) furnace, bolt foundation of 32" each bolt, | $50,000 |
| Jul 14, 2005 | Expired or cancelled cancelled Mar 2009 | 106 Grand View Av | relocate walls, remodel baths, kitchen relocate stair and kitchen. revision to pa#200505162464 (noDetails
relocate walls, remodel baths, kitchen relocate stair and kitchen. revision to pa#200505162464 (no | $20,000 |
| Jul 22, 2004 | Completed final sign-off Oct 2004 | 353 Noe St | remodel kitchen & one 1/2 bath at each unit. repair termite items 2a,5a,5c,5d,5e, 5g & 3a-less thanDetails
remodel kitchen & one 1/2 bath at each unit. repair termite items 2a,5a,5c,5d,5e, 5g & 3a-less than | $20,000 |
| Jun 16, 2004 | Completed final sign-off Mar 2005 | 536 Funston Av | remodel a kitchen, 3 baths, or remove lath & plaster in bathroom and 2 bedroomsDetails
remodel a kitchen, 3 baths, or remove lath & plaster in bathroom and 2 bedrooms | $30,000 |
| Apr 17, 2003 | Completed final sign-off Jul 2003 | 2907 Octavia St | remodeling kitchen & bathroomDetails
remodeling kitchen & bathroom | $8,000 |
| Oct 3, 2002 | Completed final sign-off Mar 2003 | 579 Duncan St | remodeling 2 kitchen & 4 bathrooms. replace single pane windows to double pane both unit (front &Details
remodeling 2 kitchen & 4 bathrooms. replace single pane windows to double pane both unit (front & | $22,000 |
| Sep 11, 2002 | Expired or cancelled expired Feb 2004 | 1578 Newcomb Av | remodeling kitchen,bathrm. repair rear stairway dryrot repair in kind. replace wall & base cabinet,aDetails
remodeling kitchen,bathrm. repair rear stairway dryrot repair in kind. replace wall & base cabinet,a | $9,000 |
| Jun 20, 2002 | Completed final sign-off Oct 2002 | 1740 Franklin St | kitchen remodel,remove cabinet & counter top install new appliances,cabinet & counter top floor coveDetails
kitchen remodel,remove cabinet & counter top install new appliances,cabinet & counter top floor cove | $7,000 |