Back to bathroom remodel contractors
P F Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Nov 2024
- Last 24 months
- 1 permit filed
126 permits since 2000: 109 completed, 1 in progress, 8 never finaled, 8 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 36 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2021 | Completed final sign-off Feb 2024 | 3109 Fillmore St | convert existing retail on 2/f to camabes sales & consumption louge: new ada bathroom, new service storage; new finishes. new filtration and ventilation system.Details
convert existing retail on 2/f to camabes sales & consumption louge: new ada bathroom, new service storage; new finishes. new filtration and ventilation system. | $187,000 |
| Aug 14, 2019 | Completed final sign-off Jan 2020 | 514 Myra Wy | due to water damage by wind. repair 2 bedroom drywall, ceiling wall, bathroom, kitchen, hallway, replace a furnace. a separate mechanical permit is required. no framing work/modification - no structural work.Details
due to water damage by wind. repair 2 bedroom drywall, ceiling wall, bathroom, kitchen, hallway, replace a furnace. a separate mechanical permit is required. no framing work/modification - no structural work. | $30,000 |
| Oct 1, 2018 | Completed final sign-off Jul 2019 | 984 Harrison St | all work in unit a. remove 8ft of linear internal wall; convert 1/2 bath to full bath, add door between kitchen and bedroom, create new wall, reconfigure 2 hall door ways (interior), replace kitchen cabinets. maher n/aDetails
all work in unit a. remove 8ft of linear internal wall; convert 1/2 bath to full bath, add door between kitchen and bedroom, create new wall, reconfigure 2 hall door ways (interior), replace kitchen cabinets. maher n/a | $2,000 |
| Oct 30, 2017 | Completed final sign-off Mar 2019 | 1362 07th Av | 1st fl: convert e space to have a bedroom, den , family rm, full bath. 2nd fl: remodel e kitchen and bath. 3rd fl and 4th fl: remodel e bath, add 2 full bathsDetails
1st fl: convert e space to have a bedroom, den , family rm, full bath. 2nd fl: remodel e kitchen and bath. 3rd fl and 4th fl: remodel e bath, add 2 full baths | $100,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2019 | 1974 46th Av | 1st fl convert e space to have a bedroom, 1 study rm, family rm, full bath, a powder rmDetails
1st fl convert e space to have a bedroom, 1 study rm, family rm, full bath, a powder rm | $70,000 |
| Aug 11, 2017 | Completed final sign-off Jan 2019 | 1808 17th Av | provide new 2 bedrooms, one living room and new full bathroom at lower level. new footing at lower level.Details
provide new 2 bedrooms, one living room and new full bathroom at lower level. new footing at lower level. | $15,000 |
| May 31, 2017 | Completed final sign-off Mar 2018 | 2008 Lombard St | unit b: interior remodel - kitchen and bathroom. add a bathroomDetails
unit b: interior remodel - kitchen and bathroom. add a bathroom | $20,000 |
| Feb 15, 2017 | Completed final sign-off Apr 2018 | 51 Moss St | 1st floor, #unit a: relocate bedrooms, remodel kitchen, bathroom, add a full bath. minor fooring repair. maher naDetails
1st floor, #unit a: relocate bedrooms, remodel kitchen, bathroom, add a full bath. minor fooring repair. maher na | $42,000 |
| Feb 15, 2017 | Completed final sign-off Apr 2018 | 51 Moss St | 2nd floor, #unit b: relocate bedrooms, remodel kitchen, bathroom, add a full bath. maher n/aDetails
2nd floor, #unit b: relocate bedrooms, remodel kitchen, bathroom, add a full bath. maher n/a | $40,000 |
| Jan 19, 2017 | Completed final sign-off Apr 2018 | 51 Moss St | 3rd floor #unit c: relocate bedrooms, remodel kitchen, bathroom, add a full bath. add 1 hr. rated egress passageway at garage level. n/a maher ordinanceDetails
3rd floor #unit c: relocate bedrooms, remodel kitchen, bathroom, add a full bath. add 1 hr. rated egress passageway at garage level. n/a maher ordinance | $45,000 |
| Jan 5, 2017 | Never finaled issued Jan 2017, no final | 2010 Lombard St | add a bath, remodel kitchen, and replace furnace on 2nd floor. n/a for maherDetails
add a bath, remodel kitchen, and replace furnace on 2nd floor. n/a for maher | $15,000 |
| Feb 5, 2016 | Never finaled issued Mar 2016, no final | 505 Oak St | interior remodel of extg 3-story with garage, 3 unit apartment/unit #505 including. remodel of extg kitchen and 2 bathrooms. creation of master bedroom suite with new bathroom(within extg bedroom #2). removal/replacement of misc. interior non-load bearing partitions.Details
interior remodel of extg 3-story with garage, 3 unit apartment/unit #505 including. remodel of extg kitchen and 2 bathrooms. creation of master bedroom suite with new bathroom(within extg bedroom #2). removal/replacement of misc. interior non-load bearing partitions. | $62,500 |
| Jun 11, 2013 | Completed final sign-off Apr 2014 | 563 11th Av | remodel (e) space to have a family room, two baths & two bedrooms in 1st floor. infill (e) rear sunroom.Details
remodel (e) space to have a family room, two baths & two bedrooms in 1st floor. infill (e) rear sunroom. | $45,000 |
| Sep 16, 2011 | Completed final sign-off Feb 2012 | 5358 Mission St | interior renovation for 2nd floor unit. comply with nov 201116241 e kitchen and bath with new, add mster bath, new interior finishes, replace e windows with new in kindDetails
interior renovation for 2nd floor unit. comply with nov 201116241 e kitchen and bath with new, add mster bath, new interior finishes, replace e windows with new in kind | $68,000 |
| Apr 29, 2011 | Completed final sign-off Feb 2012 | 1727 Greenwich St | remodel (4) bath, (2) kitchens, replace (2) central heat at garage of two dwelling units. provide min. 50% of kitchen lighting in high efficacy lights. provide high efficacy lights or "manual on" occupancy sensor in bathroom.Details
remodel (4) bath, (2) kitchens, replace (2) central heat at garage of two dwelling units. provide min. 50% of kitchen lighting in high efficacy lights. provide high efficacy lights or "manual on" occupancy sensor in bathroom. | $50,000 |
| Apr 12, 2011 | Completed final sign-off Jan 2014 | 1468 Masonic Av | revision to appl #201007096290-s1 & pa #201003228630: change (e) storage space into exercise room & a guest room in basement. change part of 1st floor rear roof into deck. relocate (e) bath in attic space.Details
revision to appl #201007096290-s1 & pa #201003228630: change (e) storage space into exercise room & a guest room in basement. change part of 1st floor rear roof into deck. relocate (e) bath in attic space. | $30,000 |
| Jul 26, 2010 | Completed final sign-off Nov 2010 | 218 Sadowa St | remodel a kitchen and a bath, including lighting plugs; kitchen 10x10 sq. ft.; bath 5'x 8'Details
remodel a kitchen and a bath, including lighting plugs; kitchen 10x10 sq. ft.; bath 5'x 8' | $12,000 |
| Jun 17, 2010 | Completed final sign-off May 2011 | 74 Almaden Ct | remodeling master bath room at top floor.Details
remodeling master bath room at top floor. | $9,037 |
| Jan 19, 2010 | Completed final sign-off Aug 2012 | 670 38th Av | rear addition: 1st. floor; to add a playroom, family room, a full bathroom, a bedroom & guest suite; 2nd. floor; to add a master suite, a study, a powder room.Details
rear addition: 1st. floor; to add a playroom, family room, a full bathroom, a bedroom & guest suite; 2nd. floor; to add a master suite, a study, a powder room. | $200,000 |
| Sep 10, 2009 | Completed final sign-off Mar 2010 | 222 Sadowa St | rev. to pa# 2007.06.07.3325. delete bath #2 at first level. relocate washer dryer. master bath double vanity change to one. add a furnace at upper floor storage room.Details
rev. to pa# 2007.06.07.3325. delete bath #2 at first level. relocate washer dryer. master bath double vanity change to one. add a furnace at upper floor storage room. | |
| Nov 26, 2008 | Completed final sign-off May 2009 | 538 11th Av | alteration of second bathroom on 3rd floor. new fixtures, tub,toilet, vanity,tile and finishesDetails
alteration of second bathroom on 3rd floor. new fixtures, tub,toilet, vanity,tile and finishes | $8,000 |
| Oct 22, 2008 | Completed final sign-off May 2009 | 538 11th Av | add a new master bath at master bedroom at 3rd floor. remodel a kitchen at 2nd floor. replace a furnace in kind at garageDetails
add a new master bath at master bedroom at 3rd floor. remodel a kitchen at 2nd floor. replace a furnace in kind at garage | $28,000 |
| Nov 1, 2007 | Completed final sign-off Apr 2008 | 2660 Filbert St | interior remodel of three existing bathrooms, new partition walls in media room, new lighting at ground level, new 1st floor heat registers,replace 4 wood windows in kind @ front of building. all work on 1st and 3rd floorsDetails
interior remodel of three existing bathrooms, new partition walls in media room, new lighting at ground level, new 1st floor heat registers,replace 4 wood windows in kind @ front of building. all work on 1st and 3rd floors | $26,300 |
| Apr 4, 2007 | Completed final sign-off Nov 2007 | 575 11th Av | remodling two baths and kitchen.Details
remodling two baths and kitchen. | $20,000 |
| Mar 20, 2007 | Completed final sign-off Jul 2007 | 1447 46th Av | to add 2 bedroom, one full bath room, one storage and laundry area on extg ground floor and also to add one half bathroom and remodel extg kchn, bathroom on 2nd floor per planDetails
to add 2 bedroom, one full bath room, one storage and laundry area on extg ground floor and also to add one half bathroom and remodel extg kchn, bathroom on 2nd floor per plan | $26,000 |
| Feb 20, 2007 | Completed final sign-off Oct 2007 | 131 03rd Av | interior remodel-new family, bathrooms at 1st floor, new interior stair 2nd floor, kitchen remodel, relocate powder room, new master suite at 3rd floor. repair dry rot at rear of building. replace (e) furnace, extend (e) deck at 2nd floor, new sheetrock in areas of remodel.Details
interior remodel-new family, bathrooms at 1st floor, new interior stair 2nd floor, kitchen remodel, relocate powder room, new master suite at 3rd floor. repair dry rot at rear of building. replace (e) furnace, extend (e) deck at 2nd floor, new sheetrock in areas of remodel. | $80,000 |
| Jan 23, 2007 | Completed final sign-off Nov 2007 | 152 06th Av | new master bathroom (1) new skylightDetails
new master bathroom (1) new skylight | $10,000 |
| Sep 27, 2006 | Expired or cancelled expired Feb 2009 | 563 11th Av | remodel bathrooms x 2 @ 2nd & 3rd floor. new light to be title 24 compliant.Details
remodel bathrooms x 2 @ 2nd & 3rd floor. new light to be title 24 compliant. | $10,000 |
| Aug 11, 2006 | Completed final sign-off Jan 2007 | 508 18th Av | provide the opening at the 1st floor to make the dining family room area bigger. also remodel the bathroom & add a move bathroom at the 2nd floor. also provide 3 sky lights at the 2nd floor.Details
provide the opening at the 1st floor to make the dining family room area bigger. also remodel the bathroom & add a move bathroom at the 2nd floor. also provide 3 sky lights at the 2nd floor. | $50,000 |
| Jul 10, 2006 | Completed final sign-off Dec 2006 | 2001 Grove St | work in unit# 12. remodel 1 kitchen & a bath. replace cabinets fixtures & appliances; patch sheet rock or plasters from rewiring. no structural work.Details
work in unit# 12. remodel 1 kitchen & a bath. replace cabinets fixtures & appliances; patch sheet rock or plasters from rewiring. no structural work. | $15,000 |
| Sep 12, 2005 | Completed final sign-off Mar 2006 | 343 14th Av | removed wall not structural 12 windows. remove deck add (2) baths. revision to #200508150255.Details
removed wall not structural 12 windows. remove deck add (2) baths. revision to #200508150255. | $5,000 |
| Aug 15, 2005 | Completed final sign-off Mar 2006 | 343 14th Av | remodel 1 kitchen and 3 1/2 bathrooms, replace (e) furnace, bolt foundation of 32" each bolt,Details
remodel 1 kitchen and 3 1/2 bathrooms, replace (e) furnace, bolt foundation of 32" each bolt, | $50,000 |
| Jul 14, 2005 | Expired or cancelled cancelled Mar 2009 | 106 Grand View Av | relocate walls, remodel baths, kitchen relocate stair and kitchen. revision to pa#200505162464 (noDetails
relocate walls, remodel baths, kitchen relocate stair and kitchen. revision to pa#200505162464 (no | $20,000 |
| May 16, 2005 | Completed final sign-off Jun 2006 | 106 Grand View Av | remodel 2 full bath & 1/2 bath. provide flour. lights on 1st switches & exh. fan per sfbc 1203.3.Details
remodel 2 full bath & 1/2 bath. provide flour. lights on 1st switches & exh. fan per sfbc 1203.3. | $90,000 |
| Aug 31, 2004 | Completed final sign-off Jan 2005 | 349 Jersey St | add study room & bathroom in basement.(n) study room not for sleeping purposeDetails
add study room & bathroom in basement.(n) study room not for sleeping purpose | $7,000 |
| Jul 22, 2004 | Completed final sign-off Oct 2004 | 353 Noe St | remodel kitchen & one 1/2 bath at each unit. repair termite items 2a,5a,5c,5d,5e, 5g & 3a-less thanDetails
remodel kitchen & one 1/2 bath at each unit. repair termite items 2a,5a,5c,5d,5e, 5g & 3a-less than | $20,000 |
| Jun 16, 2004 | Completed final sign-off Mar 2005 | 536 Funston Av | remodel a kitchen, 3 baths, or remove lath & plaster in bathroom and 2 bedroomsDetails
remodel a kitchen, 3 baths, or remove lath & plaster in bathroom and 2 bedrooms | $30,000 |
| Apr 17, 2003 | Completed final sign-off Jul 2003 | 2907 Octavia St | remodeling kitchen & bathroomDetails
remodeling kitchen & bathroom | $8,000 |
| Oct 3, 2002 | Completed final sign-off Mar 2003 | 579 Duncan St | remodeling 2 kitchen & 4 bathrooms. replace single pane windows to double pane both unit (front &Details
remodeling 2 kitchen & 4 bathrooms. replace single pane windows to double pane both unit (front & | $22,000 |
| May 7, 2002 | Completed final sign-off Aug 2002 | 607 04th Av | remodel 4 baths/2 ktichensDetails
remodel 4 baths/2 ktichens | $10,000 |