Back to kitchen remodel contractors
Olcan Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Apr 2011 to Sep 2026
- Last 24 months
- 6 permits filed
63 permits since 2000: 60 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 3857 26th St | kitchen remodel: new cabinets, new sink, new tiles. no moving walls.Details
kitchen remodel: new cabinets, new sink, new tiles. no moving walls. | $15,000 |
| Mar 17, 2023 | Completed final sign-off Jul 2025 | 2111 Hyde St | unit 601: remodel (1) kitchen, (2) bathrooms, add (1) powder room, new fixtures, lights, move washer/dryer. no exterior work. new doors; no structural workDetails
unit 601: remodel (1) kitchen, (2) bathrooms, add (1) powder room, new fixtures, lights, move washer/dryer. no exterior work. new doors; no structural work | $400,000 |
| Sep 28, 2021 | Completed final sign-off Jul 2025 | 2111 Hyde St | bathrooms and 1 kitchen remodel. lighting comply with cec 150.0(k).no wall changesDetails
bathrooms and 1 kitchen remodel. lighting comply with cec 150.0(k).no wall changes | $100,000 |
| Apr 2, 2021 | Completed final sign-off Sep 2025 | 2111 Hyde St | remodel 2 baths in kind. install new powder room (bath), remodel kitchen in kind. refinish floor, upgrade electrical to code, remodel bedrooms & common areas, install 3 new windows (not visible from st) in kind. install recessed & flish fixture lighting.Details
remodel 2 baths in kind. install new powder room (bath), remodel kitchen in kind. refinish floor, upgrade electrical to code, remodel bedrooms & common areas, install 3 new windows (not visible from st) in kind. install recessed & flish fixture lighting. | $385,000 |
| Feb 15, 2019 | Completed final sign-off Mar 2019 | 1950 08th Av | remove sheetrock ceilings in kitchen and dining room (due to leak) replace sheetrock and paint no other workDetails
remove sheetrock ceilings in kitchen and dining room (due to leak) replace sheetrock and paint no other work | $9,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 2064 Great Hy | kitchen update, change counter top, sink, back splash, new outlets, range, kitchen size 90 sfDetails
kitchen update, change counter top, sink, back splash, new outlets, range, kitchen size 90 sf | $8,000 |
| Jan 8, 2018 | Completed final sign-off May 2018 | 1501 Beach St | unit 202: install new kitchen caibnets, new floor finsihes, new bathroom fixtures & finishes: new lights, like for like, kitchen & bath remodel.Details
unit 202: install new kitchen caibnets, new floor finsihes, new bathroom fixtures & finishes: new lights, like for like, kitchen & bath remodel. | $49,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2025 | 25 Hartford St | renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms &Details
renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms & | $405,044 |
| May 20, 2011 | Completed final sign-off Oct 2011 | 2810 Laguna St | repair & replace dry rot, sister stud to existing 4"x4" @16 in o.c. with taperoo 2x8, studs to straighten walls, repair mudsill in kitchen, dining room & office on main floor, raise foundation stem in 6 thk min. wall 12" on southern explosure, bolt 5/8" 24" o.c., reinforced with #5 rebar,Details
repair & replace dry rot, sister stud to existing 4"x4" @16 in o.c. with taperoo 2x8, studs to straighten walls, repair mudsill in kitchen, dining room & office on main floor, raise foundation stem in 6 thk min. wall 12" on southern explosure, bolt 5/8" 24" o.c., reinforced with #5 rebar, | $10,000 |