Back to bathroom remodel contractors
Olcan Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Apr 2011 to Sep 2026
- Last 24 months
- 6 permits filed
63 permits since 2000: 60 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | Completed final sign-off Aug 2026 | 2111 Hyde St | interior alteration to update fixtures in primary bedroom, and add one half bathroom in existing closet. no wall removal.Details
interior alteration to update fixtures in primary bedroom, and add one half bathroom in existing closet. no wall removal. | $30,000 |
| Mar 17, 2023 | Completed final sign-off Jul 2025 | 2111 Hyde St | unit 601: remodel (1) kitchen, (2) bathrooms, add (1) powder room, new fixtures, lights, move washer/dryer. no exterior work. new doors; no structural workDetails
unit 601: remodel (1) kitchen, (2) bathrooms, add (1) powder room, new fixtures, lights, move washer/dryer. no exterior work. new doors; no structural work | $400,000 |
| Feb 16, 2023 | Completed final sign-off Oct 2023 | 2111 Hyde St | remodel bathroom: new fixtures, new tile. no structural work, no wall removed.Details
remodel bathroom: new fixtures, new tile. no structural work, no wall removed. | $20,000 |
| Oct 6, 2022 | Completed final sign-off Oct 2023 | 2111 Hyde St | remodel bathroom: change tub to shower up date fiixtures and new tile. install new wood windows to replace in kind. existing windows street facing throughtout condo. all windows to be wood. u-factor less than 0.58Details
remodel bathroom: change tub to shower up date fiixtures and new tile. install new wood windows to replace in kind. existing windows street facing throughtout condo. all windows to be wood. u-factor less than 0.58 | $88,000 |
| Sep 28, 2021 | Completed final sign-off Jul 2025 | 2111 Hyde St | bathrooms and 1 kitchen remodel. lighting comply with cec 150.0(k).no wall changesDetails
bathrooms and 1 kitchen remodel. lighting comply with cec 150.0(k).no wall changes | $100,000 |
| Apr 2, 2021 | Completed final sign-off Sep 2025 | 2111 Hyde St | remodel 2 baths in kind. install new powder room (bath), remodel kitchen in kind. refinish floor, upgrade electrical to code, remodel bedrooms & common areas, install 3 new windows (not visible from st) in kind. install recessed & flish fixture lighting.Details
remodel 2 baths in kind. install new powder room (bath), remodel kitchen in kind. refinish floor, upgrade electrical to code, remodel bedrooms & common areas, install 3 new windows (not visible from st) in kind. install recessed & flish fixture lighting. | $385,000 |
| Dec 2, 2019 | Completed final sign-off Jan 2020 | 57 Thrift St | repair house due to water damage new floors, new cabinets, slight bathroom remodel (48 sf), removal of sheetrock & insulation and installation of new insulation & sheetrock.Details
repair house due to water damage new floors, new cabinets, slight bathroom remodel (48 sf), removal of sheetrock & insulation and installation of new insulation & sheetrock. | $72,673 |
| Nov 7, 2019 | Completed final sign-off Sep 2020 | 4308 21st St | remove tub and install shower pan. remove medicine cab and replace with new. approx 45 sf bathroom remodelDetails
remove tub and install shower pan. remove medicine cab and replace with new. approx 45 sf bathroom remodel | $28,000 |
| Oct 11, 2018 | Completed final sign-off Aug 2020 | 39 Dashiell Hammett St | unit #301 - interior alterations to (e) condo residence including kithcne and bath reno. no change in occupancy/area/exit path or envelope.Details
unit #301 - interior alterations to (e) condo residence including kithcne and bath reno. no change in occupancy/area/exit path or envelope. | $150,000 |
| Jan 8, 2018 | Completed final sign-off May 2018 | 1501 Beach St | unit 202: install new kitchen caibnets, new floor finsihes, new bathroom fixtures & finishes: new lights, like for like, kitchen & bath remodel.Details
unit 202: install new kitchen caibnets, new floor finsihes, new bathroom fixtures & finishes: new lights, like for like, kitchen & bath remodel. | $49,000 |
| Aug 18, 2015 | Completed final sign-off Sep 2025 | 25 Hartford St | renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms &Details
renovation of a single family res'd completer remodel of all interiors, grow rear of building horizontally, convert (e) storage to (n) guestroom at ground level, (n) bath, (n) atrium, (n) rec room, reconfiguration of (e) powder kitchen & living at second level, reconfig. of (e)3 bedrms & | $405,044 |
| Apr 19, 2011 | Completed final sign-off Oct 2011 | 2810 Laguna St | remodel 1-bathroom & closets. inspector to verify in field for accurate pricing to work stated.Details
remodel 1-bathroom & closets. inspector to verify in field for accurate pricing to work stated. | $4,200 |