Block 6566, lot 035
3857 26th St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 3
- Units
- 2
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,789 sq ft
- Lot
- 2,850 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 3857 26th St | Olcan Construction Inc | kitchen remodel: new cabinets, new sink, new tiles. no moving walls.Details
kitchen remodel: new cabinets, new sink, new tiles. no moving walls. | $15,000 |
| Nov 13, 2020 | Completed final sign-off Mar 2021 | 3857 26th St | Olcan Construction Inc | install new washing machine and dryer in garage with new hook ups. no new walls and no new closetsDetails
install new washing machine and dryer in garage with new hook ups. no new walls and no new closets | $7,500 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 3857 26th St | Restoration Builders Inc | replacing 6 windows, wood for wood like for like.Details
replacing 6 windows, wood for wood like for like. | $18,837 |
| Apr 23, 2018 | Completed final sign-off Oct 2018 | 3857 26th St | Roofing Logistics | re-roofingDetails
re-roofing | $13,900 |
| Mar 23, 2016 | Completed final sign-off Jun 2016 | 3857 26th St | All Construction Services | demo shower, repair sheetrock move plumbing, install bathtub & tile at lower unit.Details
demo shower, repair sheetrock move plumbing, install bathtub & tile at lower unit. | $3,600 |
| Feb 14, 2013 | Completed final sign-off Feb 2013 | 3857 26th St | Milo Construction | to obtain final inspectionfor work approved under pa # 201007277485. all work is complete.Details
to obtain final inspectionfor work approved under pa # 201007277485. all work is complete. | |
| Feb 14, 2013 | Completed final sign-off Feb 2013 | 3857 26th St | Milo Construction | to obtain final inspectionfor work approved under pa # 201009171077. all work is complete.Details
to obtain final inspectionfor work approved under pa # 201009171077. all work is complete. | |
| Feb 14, 2013 | Completed final sign-off Feb 2013 | 3857 26th St | Milo Construction | to obtain final inspectionfor work approved under pa # 201010153142. all work is complete.Details
to obtain final inspectionfor work approved under pa # 201010153142. all work is complete. | |
| Jan 14, 2011 | Completed final sign-off Feb 2011 | 3857 26th St | Milo Construction | insulate garage ceiling and sheetrock garage space; 5/8" type xDetails
insulate garage ceiling and sheetrock garage space; 5/8" type x | $5,000 |
| Oct 15, 2010 | Expired or cancelled expired Jan 2013 | 3857 26th St | Milo Construction | revision to pa# 2010.09.17.1077.revise anchor bolts to match holes of fabricated steel plates.install simpson angle "hc" for post1 to wood beam.install simpson strap.mst60 symetrically at split point above (n) column1.install2x6 df# 2x6 poststo fillthe placeabove (e)posts# 3&4 after removal ofs.beamDetails
revision to pa# 2010.09.17.1077.revise anchor bolts to match holes of fabricated steel plates.install simpson angle "hc" for post1 to wood beam.install simpson strap.mst60 symetrically at split point above (n) column1.install2x6 df# 2x6 poststo fillthe placeabove (e)posts# 3&4 after removal ofs.beam | |
| Sep 17, 2010 | Expired or cancelled expired Jan 2013 | 3857 26th St | Milo Construction | rev. to pa# 2010.07.27.7485. remove a cross beam and install post n footing. change wdw from 4x6 to 6x4 ( side), replace (e) wdws w/ insulated vinyl wdw (rear), change wdw size in light well. windows not visible fronm streetDetails
rev. to pa# 2010.07.27.7485. remove a cross beam and install post n footing. change wdw from 4x6 to 6x4 ( side), replace (e) wdws w/ insulated vinyl wdw (rear), change wdw size in light well. windows not visible fronm street | $3,000 |
| Jul 27, 2010 | Expired or cancelled expired Jan 2013 | 3857 26th St | unit 3857 gr fl: convert previous child care facility into study/laundry/family room for the 3rd fl unit. new interior door to garage, close off e door to hallway. raise lower ceiling height area to ceiling height 7 1/2 " headroom min.Details
unit 3857 gr fl: convert previous child care facility into study/laundry/family room for the 3rd fl unit. new interior door to garage, close off e door to hallway. raise lower ceiling height area to ceiling height 7 1/2 " headroom min. | $40,000 | |
| Nov 16, 2000 | Completed final sign-off Jan 2001 | 3859 26th St | Alco Construction | show additional floor plan changes on permits 2000/08/11/7631, 2000/08/30/9264, &2000/08/24/8832.Details
show additional floor plan changes on permits 2000/08/11/7631, 2000/08/30/9264, &2000/08/24/8832. | $18,000 |
| Aug 30, 2000 | Expired or cancelled expired Dec 2000 | 3857 26th St | enlarge (e) door opening @ 2nd fl nit bearing wall between kitchen & dining rm.Details
enlarge (e) door opening @ 2nd fl nit bearing wall between kitchen & dining rm. | $500 | |
| Aug 24, 2000 | Completed final sign-off Dec 2000 | 3857 26th St | Alco Construction | remodel existing bathroom, provide mechanical ventilation, new title and floor in unit 3857Details
remodel existing bathroom, provide mechanical ventilation, new title and floor in unit 3857 | $4,000 |
| Aug 11, 2000 | Completed final sign-off Dec 2000 | 3857 26th St | Alco Construction | Details
| $4,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.