All Construction Services
- Based in
- El Granada
- On San Francisco permits
- Sep 2013 to Dec 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2018 | Completed final sign-off May 2019 | 209 Gates St | revision to pa201810042303: reframe kitchen ceiling. dryrot repair om 1/2 bathroom. all work repair in-kind.Details
revision to pa201810042303: reframe kitchen ceiling. dryrot repair om 1/2 bathroom. all work repair in-kind. | $10,000 |
| Oct 4, 2018 | Completed final sign-off May 2019 | 209 Gates St | remodel kitchen, 1/2 bathroom, full bathroom, move plumbing from floor to inside wall, bring elelctrical up to code.Details
remodel kitchen, 1/2 bathroom, full bathroom, move plumbing from floor to inside wall, bring elelctrical up to code. | $70,000 |
| Jul 25, 2018 | Completed final sign-off Dec 2019 | 709 Central Av | interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unitDetails
interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unit | $100,000 |
| Jul 25, 2018 | Expired or cancelled expired Oct 2021 | 711 Central Av | interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unitDetails
interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unit | $100,000 |
| Apr 11, 2018 | Completed final sign-off Oct 2019 | 925 Woolsey St | rooms down remodel connecting upstairs living areas to downstairs. build out of media room, mudroom, closet, bedroom & full bathroomDetails
rooms down remodel connecting upstairs living areas to downstairs. build out of media room, mudroom, closet, bedroom & full bathroom | $75,000 |
| Apr 9, 2018 | Completed final sign-off Nov 2019 | 160 Liberty St | sipplemental drawing set to (e) kitchen remodel w/ pa 201803143639. remove (e) wall and relocate door openingDetails
sipplemental drawing set to (e) kitchen remodel w/ pa 201803143639. remove (e) wall and relocate door opening | $5,000 |
| Mar 14, 2018 | Completed final sign-off Feb 2021 | 160 Liberty St | kitchen remodel. like for like. new cabinets, flooring. outlets, lights,change sink. no walls moved,added all layouts remain the sameDetails
kitchen remodel. like for like. new cabinets, flooring. outlets, lights,change sink. no walls moved,added all layouts remain the same | $20,000 |
| Mar 9, 2018 | Completed final sign-off Mar 2018 | 479 Silver Av | remove dry rot sections of deck and replace with new lumber, less than 50%Details
remove dry rot sections of deck and replace with new lumber, less than 50% | |
| Dec 4, 2017 | Completed final sign-off Jun 2018 | 73 Hartford St | remove (e) siding repair dry rot and replace with new siding. rear of bld. not visible from street. repair in kindDetails
remove (e) siding repair dry rot and replace with new siding. rear of bld. not visible from street. repair in kind | $50,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 175 Bluxome St | remodel bathroomDetails
remodel bathroom | $8,000 |
| Nov 29, 2016 | Completed final sign-off Apr 2019 | 925 Woolsey St | legalize (e) rear unit pursuant to ordinance no 43-14. proposed work; add bicycle parking, increase bedroom window to conform to min. height requirements.Details
legalize (e) rear unit pursuant to ordinance no 43-14. proposed work; add bicycle parking, increase bedroom window to conform to min. height requirements. | $1,500 |
| Aug 17, 2016 | Completed final sign-off Mar 2017 | 1554 47th Av | remove all (e) kitchen and bathroom cabinets, fixtures and tile and replace with new. no changes to any wall locations or addition of new walls.Details
remove all (e) kitchen and bathroom cabinets, fixtures and tile and replace with new. no changes to any wall locations or addition of new walls. | $12,000 |
| Aug 17, 2016 | Completed final sign-off Feb 2017 | 720 Clayton St | 3rd floor: remodel (e) bathroom and relocate (e) laundry room to (e) half bath and convert laundry to full bathDetails
3rd floor: remodel (e) bathroom and relocate (e) laundry room to (e) half bath and convert laundry to full bath | $20,000 |
| Jul 1, 2016 | Never finaled issued Aug 2016, no final | 403 Irving St | to erect non-electrical wall mounted sign (b)Details
to erect non-electrical wall mounted sign (b) | $300 |
| Jul 1, 2016 | Never finaled issued Aug 2016, no final | 403 Irving St | to erect non-electrical projecting sign (a)Details
to erect non-electrical projecting sign (a) | $300 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 1682 48th Av | remove stucco around window & repair dryrot.Details
remove stucco around window & repair dryrot. | $2,200 |
| Mar 23, 2016 | Completed final sign-off Jun 2016 | 3857 26th St | demo shower, repair sheetrock move plumbing, install bathtub & tile at lower unit.Details
demo shower, repair sheetrock move plumbing, install bathtub & tile at lower unit. | $3,600 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 175 Bluxome St | #313 - remodel master bathroom. replace tub, sheetrock & tile. remove countertop & plywood, install new plywood. n/a maher ordinanceDetails
#313 - remodel master bathroom. replace tub, sheetrock & tile. remove countertop & plywood, install new plywood. n/a maher ordinance | $4,300 |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 403 Irving St | comply with nov 200724777 ,change of use from grocery to wine bar. upgraded to include hand sink & ada compliance bathroom and 3 compartment sink.Details
comply with nov 200724777 ,change of use from grocery to wine bar. upgraded to include hand sink & ada compliance bathroom and 3 compartment sink. | |
| May 18, 2015 | Completed final sign-off Aug 2019 | 1248 Funston Av | square out of 11'x7' space on 3 levels addition 5'x17' on middle level, 21'x25' on lowel level. remodel kitchen & bathroom. replace electrical and plumbing throughout. addition will primarily be bathrooms, bedrooms and a living room.Details
square out of 11'x7' space on 3 levels addition 5'x17' on middle level, 21'x25' on lowel level. remodel kitchen & bathroom. replace electrical and plumbing throughout. addition will primarily be bathrooms, bedrooms and a living room. | $200,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 299 Cole St | to exterior - unit 6 & 9 - 3' from pl & openings into bldg maintain barrier between floors. install bathroom fan 2 units, repair ceiling and wall openings facing parking spaceDetails
to exterior - unit 6 & 9 - 3' from pl & openings into bldg maintain barrier between floors. install bathroom fan 2 units, repair ceiling and wall openings facing parking space | $1,800 |
| Mar 20, 2015 | Completed final sign-off Nov 2015 | 299 Cole St | unit #3: open bathroom ceiling repair leaky pipe, install new fan, repair damaged wood and ceiling with 5/8 type x sheetrockDetails
unit #3: open bathroom ceiling repair leaky pipe, install new fan, repair damaged wood and ceiling with 5/8 type x sheetrock | $800 |
| Sep 23, 2014 | Completed final sign-off Aug 2015 | 299 Cole St | unit #2:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel.Details
unit #2:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel. | $8,000 |
| Sep 23, 2014 | Completed final sign-off Aug 2015 | 299 Cole St | unit #5:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel.Details
unit #5:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel. | $8,000 |
| Aug 12, 2014 | Completed final sign-off May 2015 | 299 Cole St | structural support in lobby & garage & bay window in unit #2.Details
structural support in lobby & garage & bay window in unit #2. | $20,000 |
| Jun 2, 2014 | Completed final sign-off May 2015 | 299 Cole St | remove existing sheetrock in lobby ceiling and unit 2 and 5 to repair plumbing and replace sheetrock; replace sheetrock in kindDetails
remove existing sheetrock in lobby ceiling and unit 2 and 5 to repair plumbing and replace sheetrock; replace sheetrock in kind | $1,300 |
| May 28, 2014 | Expired or cancelled cancelled Jun 2014 | 299 Cole St | demo lobby ceiling (10'x12') to inspect demo work only under this permit must maintain egress during all times of constructionDetails
demo lobby ceiling (10'x12') to inspect demo work only under this permit must maintain egress during all times of construction | $1,000 |
| Sep 18, 2013 | Never finaled issued Sep 2013, no final | 2255 Market St | fire damage - remove lathe and plaster from walls and replace with new sheetrock. no remodelling.Details
fire damage - remove lathe and plaster from walls and replace with new sheetrock. no remodelling. | $20,000 |