Back to bathroom remodel contractors
All Construction Services
- Based in
- El Granada
- On San Francisco permits
- Sep 2013 to Dec 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 21 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2018 | Completed final sign-off May 2019 | 209 Gates St | revision to pa201810042303: reframe kitchen ceiling. dryrot repair om 1/2 bathroom. all work repair in-kind.Details
revision to pa201810042303: reframe kitchen ceiling. dryrot repair om 1/2 bathroom. all work repair in-kind. | $10,000 |
| Oct 4, 2018 | Completed final sign-off May 2019 | 209 Gates St | remodel kitchen, 1/2 bathroom, full bathroom, move plumbing from floor to inside wall, bring elelctrical up to code.Details
remodel kitchen, 1/2 bathroom, full bathroom, move plumbing from floor to inside wall, bring elelctrical up to code. | $70,000 |
| Jul 25, 2018 | Expired or cancelled expired Oct 2021 | 711 Central Av | interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unitDetails
interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unit | $100,000 |
| Jul 25, 2018 | Completed final sign-off Dec 2019 | 709 Central Av | interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unitDetails
interior remodel and minor reconfiguration of walls to create 3 bed and 1.5 baths. remodel/reconfiguration kitchen. window replacment throughout unit | $100,000 |
| Apr 11, 2018 | Completed final sign-off Oct 2019 | 925 Woolsey St | rooms down remodel connecting upstairs living areas to downstairs. build out of media room, mudroom, closet, bedroom & full bathroomDetails
rooms down remodel connecting upstairs living areas to downstairs. build out of media room, mudroom, closet, bedroom & full bathroom | $75,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2017 | 175 Bluxome St | remodel bathroomDetails
remodel bathroom | $8,000 |
| Aug 17, 2016 | Completed final sign-off Feb 2017 | 720 Clayton St | 3rd floor: remodel (e) bathroom and relocate (e) laundry room to (e) half bath and convert laundry to full bathDetails
3rd floor: remodel (e) bathroom and relocate (e) laundry room to (e) half bath and convert laundry to full bath | $20,000 |
| Aug 17, 2016 | Completed final sign-off Mar 2017 | 1554 47th Av | remove all (e) kitchen and bathroom cabinets, fixtures and tile and replace with new. no changes to any wall locations or addition of new walls.Details
remove all (e) kitchen and bathroom cabinets, fixtures and tile and replace with new. no changes to any wall locations or addition of new walls. | $12,000 |
| Mar 23, 2016 | Never finaled issued Mar 2016, no final | 175 Bluxome St | #313 - remodel master bathroom. replace tub, sheetrock & tile. remove countertop & plywood, install new plywood. n/a maher ordinanceDetails
#313 - remodel master bathroom. replace tub, sheetrock & tile. remove countertop & plywood, install new plywood. n/a maher ordinance | $4,300 |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 403 Irving St | comply with nov 200724777 ,change of use from grocery to wine bar. upgraded to include hand sink & ada compliance bathroom and 3 compartment sink.Details
comply with nov 200724777 ,change of use from grocery to wine bar. upgraded to include hand sink & ada compliance bathroom and 3 compartment sink. | |
| May 18, 2015 | Completed final sign-off Aug 2019 | 1248 Funston Av | square out of 11'x7' space on 3 levels addition 5'x17' on middle level, 21'x25' on lowel level. remodel kitchen & bathroom. replace electrical and plumbing throughout. addition will primarily be bathrooms, bedrooms and a living room.Details
square out of 11'x7' space on 3 levels addition 5'x17' on middle level, 21'x25' on lowel level. remodel kitchen & bathroom. replace electrical and plumbing throughout. addition will primarily be bathrooms, bedrooms and a living room. | $200,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 299 Cole St | to exterior - unit 6 & 9 - 3' from pl & openings into bldg maintain barrier between floors. install bathroom fan 2 units, repair ceiling and wall openings facing parking spaceDetails
to exterior - unit 6 & 9 - 3' from pl & openings into bldg maintain barrier between floors. install bathroom fan 2 units, repair ceiling and wall openings facing parking space | $1,800 |
| Mar 20, 2015 | Completed final sign-off Nov 2015 | 299 Cole St | unit #3: open bathroom ceiling repair leaky pipe, install new fan, repair damaged wood and ceiling with 5/8 type x sheetrockDetails
unit #3: open bathroom ceiling repair leaky pipe, install new fan, repair damaged wood and ceiling with 5/8 type x sheetrock | $800 |
| Sep 23, 2014 | Completed final sign-off Aug 2015 | 299 Cole St | unit #5:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel.Details
unit #5:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel. | $8,000 |
| Sep 23, 2014 | Completed final sign-off Aug 2015 | 299 Cole St | unit #2:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel.Details
unit #2:install new cabinets in kitchen, make bathroom bigger. kitchen and bathroom remodel. | $8,000 |