Back to kitchen remodel contractors
O'reilly Tile Design Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 13 permits filed
28 permits since 2000: 23 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2025 | Completed final sign-off Feb 2026 | 250 Monticello St | 1-kitchen remodel in-kind- new fixtures, like for like. 1-bathroom remodel in-kind- new fixtures, new tile, tub to tub. like for like. 1-laundry remodel in-kind - new washer & dryer (e) same area.Details
1-kitchen remodel in-kind- new fixtures, like for like. 1-bathroom remodel in-kind- new fixtures, new tile, tub to tub. like for like. 1-laundry remodel in-kind - new washer & dryer (e) same area. | $60,000 |
| Aug 8, 2024 | Completed final sign-off Nov 2024 | 1956 Bush St | kitchen remodel-upgrade electrical new ceiling fixture under cabinet lights, upgrade plumbing for new sink and oven upgrade gas pipe, install new kitchen cabinets and countertops new appliances.Details
kitchen remodel-upgrade electrical new ceiling fixture under cabinet lights, upgrade plumbing for new sink and oven upgrade gas pipe, install new kitchen cabinets and countertops new appliances. | $55,000 |
| Apr 30, 2024 | Completed final sign-off Jan 2025 | 1998 Broadway | scope of work 2 bathrooms and (1) kitchen being remodeled-all new plumbing & electrical fixtures, new tile on walls & floor, new shower pans, new kitchen cabinets & appliances, new countertops & plumbing fixtures. new electrical panel upgrade, new washer & dryer in master bathroomDetails
scope of work 2 bathrooms and (1) kitchen being remodeled-all new plumbing & electrical fixtures, new tile on walls & floor, new shower pans, new kitchen cabinets & appliances, new countertops & plumbing fixtures. new electrical panel upgrade, new washer & dryer in master bathroom | $95,000 |
| Oct 7, 2022 | Completed final sign-off Aug 2023 | 1901 Scott St | kitchen remodel: new cabinets, new appliances. upgrade plumbing and electrical (no structural - no framing modifications)Details
kitchen remodel: new cabinets, new appliances. upgrade plumbing and electrical (no structural - no framing modifications) | $200,000 |
| Jul 29, 2022 | Completed final sign-off Nov 2022 | 3622 Sacramento St | one kitchen and one bathroom remodel: kitchen replace cabinets, sink, and countertops. new diswasher- bathroom master - install new shower pan, tile, walls and floor, new vanity -n new plumbing fixturesDetails
one kitchen and one bathroom remodel: kitchen replace cabinets, sink, and countertops. new diswasher- bathroom master - install new shower pan, tile, walls and floor, new vanity -n new plumbing fixtures | $75,000 |