O'reilly Tile Design Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 13 permits filed
28 permits since 2000: 23 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 29 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | Completed final sign-off Oct 2026 | 1020 Church St | replacing in kind 50% of the front deck over garage. (e) concrete deck not to be touched. new drain, new membrane, new surface decking.Details
replacing in kind 50% of the front deck over garage. (e) concrete deck not to be touched. new drain, new membrane, new surface decking. | $25,000 |
| Oct 21, 2019 | Expired or cancelled withdrawn Sep 2020 | 2104 Divisadero St | reconstruct wood deck in rear yard. deck is 2'10 above grade. construct 42" firewall at north side of deckDetails
reconstruct wood deck in rear yard. deck is 2'10 above grade. construct 42" firewall at north side of deck | $15,000 |