O'reilly Tile Design Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 13 permits filed
28 permits since 2000: 23 completed, 2 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | Completed final sign-off Oct 2026 | 1020 Church St | replacing in kind 50% of the front deck over garage. (e) concrete deck not to be touched. new drain, new membrane, new surface decking.Details
replacing in kind 50% of the front deck over garage. (e) concrete deck not to be touched. new drain, new membrane, new surface decking. | $25,000 |
| Jul 31, 2026 | In progress issued Jul 2026 | 122 Alta St | partial bathroom renovation, only replacing bath tub and shower fixtures, install new shower pan, install new tile in shower, shower floor and bathroom floor only. no new plumbing fixtures except shower and bathtub. no electrical.Details
partial bathroom renovation, only replacing bath tub and shower fixtures, install new shower pan, install new tile in shower, shower floor and bathroom floor only. no new plumbing fixtures except shower and bathtub. no electrical. | $10,000 |
| Jun 24, 2026 | In progress issued Jun 2026 | 72 Castro St | work is being performed interior, upgrade electrical from knobs and tubes to new wiring, repair sheetrock holes in walls in all rooms, repair sheetrock in stair wells, tape and paint as needed.provide 1hr fire rated assembly at the exterior wall stairs and keep rating at all penetrations at propertyDetails
work is being performed interior, upgrade electrical from knobs and tubes to new wiring, repair sheetrock holes in walls in all rooms, repair sheetrock in stair wells, tape and paint as needed.provide 1hr fire rated assembly at the exterior wall stairs and keep rating at all penetrations at property | $75,000 |
| Mar 3, 2026 | Completed final sign-off Jun 2026 | 1992 15th St | bathroom remodel: upgrade the plumbing and install enw plumbing fixtures in shower, new vanity, new extractor fan(replace) upgrade electrical 3 new can lights and wall scone 1 gfc1 outlet. new tile and new showerpan.Details
bathroom remodel: upgrade the plumbing and install enw plumbing fixtures in shower, new vanity, new extractor fan(replace) upgrade electrical 3 new can lights and wall scone 1 gfc1 outlet. new tile and new showerpan. | $30,000 |
| Jan 23, 2026 | Completed final sign-off May 2026 | 2032 Wawona St | 2 bathroom remodel - new plumbing fixtures, new tiles on walls & floor. new ceiling fan, new vanity. master bathroom - new bathtub. guest bathroom - all new fixtures. rewire the house from knob + tube to new - new subpanel.Details
2 bathroom remodel - new plumbing fixtures, new tiles on walls & floor. new ceiling fan, new vanity. master bathroom - new bathtub. guest bathroom - all new fixtures. rewire the house from knob + tube to new - new subpanel. | $70,000 |
| Nov 24, 2025 | Completed final sign-off Feb 2026 | 250 Monticello St | revision to pa 202511139515: remodeling a seconf bathroom in kind. new plumbing and electrical, new fixtures, new tiles. replacing existing main panel.Details
revision to pa 202511139515: remodeling a seconf bathroom in kind. new plumbing and electrical, new fixtures, new tiles. replacing existing main panel. | $25,000 |
| Nov 13, 2025 | Completed final sign-off Feb 2026 | 250 Monticello St | 1-kitchen remodel in-kind- new fixtures, like for like. 1-bathroom remodel in-kind- new fixtures, new tile, tub to tub. like for like. 1-laundry remodel in-kind - new washer & dryer (e) same area.Details
1-kitchen remodel in-kind- new fixtures, like for like. 1-bathroom remodel in-kind- new fixtures, new tile, tub to tub. like for like. 1-laundry remodel in-kind - new washer & dryer (e) same area. | $60,000 |
| Oct 16, 2025 | Completed final sign-off Oct 2025 | 250 San Benito Wy | replace two window in kind in the garage.not visible from the street.Details
replace two window in kind in the garage.not visible from the street. | $3,000 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 248 Juanita Wy | 2 bathroom renovation - bathroom 1 new bathtub + plumbing fixtures new tile new medicine cabinet new lights - bathroom 2 new plumbing fixtures new showerpan new tile new lights - in kind replacement, same location.Details
2 bathroom renovation - bathroom 1 new bathtub + plumbing fixtures new tile new medicine cabinet new lights - bathroom 2 new plumbing fixtures new showerpan new tile new lights - in kind replacement, same location. | $70,000 |
| Aug 5, 2025 | Completed final sign-off Oct 2025 | 403 Main St | bath room remodel new shower pan new plumbing fixtures for a shower and vanity, new toilet new tile on walls and floor new can lights (4) new shower door, new counter tops, new vanityDetails
bath room remodel new shower pan new plumbing fixtures for a shower and vanity, new toilet new tile on walls and floor new can lights (4) new shower door, new counter tops, new vanity | $40,000 |
| May 2, 2025 | Completed final sign-off May 2025 | 368 Capp St | to obtain final inspection for work approved under pa# 201510210444. all work is complete.Details
to obtain final inspection for work approved under pa# 201510210444. all work is complete. | |
| Apr 22, 2025 | Completed final sign-off Sep 2025 | 901 Brannan St | replace roll-up overhead door w/ new window & swing door. windows facing parking lot do not affect public rowDetails
replace roll-up overhead door w/ new window & swing door. windows facing parking lot do not affect public row | $10,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 250 San Benito Wy | remodel bathroom laundry onlyDetails
remodel bathroom laundry only | $7,500 |
| Aug 8, 2024 | Completed final sign-off Nov 2024 | 1956 Bush St | kitchen remodel-upgrade electrical new ceiling fixture under cabinet lights, upgrade plumbing for new sink and oven upgrade gas pipe, install new kitchen cabinets and countertops new appliances.Details
kitchen remodel-upgrade electrical new ceiling fixture under cabinet lights, upgrade plumbing for new sink and oven upgrade gas pipe, install new kitchen cabinets and countertops new appliances. | $55,000 |
| Jun 6, 2024 | Completed final sign-off Jul 2024 | 133 Santa Marina St | bathroom remodel- remove existing tile from walls & floor. new vanity new ceiling fan replace plumbing fixtures install new extractor fanDetails
bathroom remodel- remove existing tile from walls & floor. new vanity new ceiling fan replace plumbing fixtures install new extractor fan | $15,000 |
| Jun 6, 2024 | Completed final sign-off Sep 2024 | 617 York St | bathroom & powder remodel pantry remodel, rewire top fl of home. replace plumbing & electrical fixtures and (n) gfi plug. new tile on walls & fl. new lights & outlets. replace laundry . remodel one window on side of house (not street visible). tot of one bath remodel.Details
bathroom & powder remodel pantry remodel, rewire top fl of home. replace plumbing & electrical fixtures and (n) gfi plug. new tile on walls & fl. new lights & outlets. replace laundry . remodel one window on side of house (not street visible). tot of one bath remodel. | $60,000 |
| Apr 30, 2024 | Completed final sign-off Jan 2025 | 1998 Broadway | scope of work 2 bathrooms and (1) kitchen being remodeled-all new plumbing & electrical fixtures, new tile on walls & floor, new shower pans, new kitchen cabinets & appliances, new countertops & plumbing fixtures. new electrical panel upgrade, new washer & dryer in master bathroomDetails
scope of work 2 bathrooms and (1) kitchen being remodeled-all new plumbing & electrical fixtures, new tile on walls & floor, new shower pans, new kitchen cabinets & appliances, new countertops & plumbing fixtures. new electrical panel upgrade, new washer & dryer in master bathroom | $95,000 |
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 1153 Powell St | replacing (9) window in the unit's lightwell and rear. in-kind. uf<0.3. wood cad or fiberglassDetails
replacing (9) window in the unit's lightwell and rear. in-kind. uf<0.3. wood cad or fiberglass | $10,000 |
| Mar 20, 2023 | Never finaled issued Mar 2023, no final | 1833 10th Av | existing fire place area. install new gas line for new fireplace unit / insert. install two new wall sconces. (nov202305026) need to pull permit for furnace that was install by others. need to have hvac contractor make corredtions to satisfy nov).Details
existing fire place area. install new gas line for new fireplace unit / insert. install two new wall sconces. (nov202305026) need to pull permit for furnace that was install by others. need to have hvac contractor make corredtions to satisfy nov). | $15,000 |
| Dec 14, 2022 | Completed final sign-off Mar 2023 | 1833 10th Av | one bathroom remodel- install a new double sink vanity, new plumbing fixtures (bathtub, faucets, wall hung toilet). new wall vanity, lights, new wall fan, new shower pan, new tile on walls around shower and wainscot, new hour tile.Details
one bathroom remodel- install a new double sink vanity, new plumbing fixtures (bathtub, faucets, wall hung toilet). new wall vanity, lights, new wall fan, new shower pan, new tile on walls around shower and wainscot, new hour tile. | $50,000 |
| Nov 14, 2022 | Completed final sign-off Jan 2023 | 1740 Bush St | one bathroom remodel- upgrade plumbing and electrical, new shower pan, new vanity, new plumbing fixtures, new fan new light fixture. new tile on walls and floor.Details
one bathroom remodel- upgrade plumbing and electrical, new shower pan, new vanity, new plumbing fixtures, new fan new light fixture. new tile on walls and floor. | $50,000 |
| Oct 7, 2022 | Completed final sign-off Aug 2023 | 1901 Scott St | kitchen remodel: new cabinets, new appliances. upgrade plumbing and electrical (no structural - no framing modifications)Details
kitchen remodel: new cabinets, new appliances. upgrade plumbing and electrical (no structural - no framing modifications) | $200,000 |
| Jul 29, 2022 | Completed final sign-off Nov 2022 | 3622 Sacramento St | one kitchen and one bathroom remodel: kitchen replace cabinets, sink, and countertops. new diswasher- bathroom master - install new shower pan, tile, walls and floor, new vanity -n new plumbing fixturesDetails
one kitchen and one bathroom remodel: kitchen replace cabinets, sink, and countertops. new diswasher- bathroom master - install new shower pan, tile, walls and floor, new vanity -n new plumbing fixtures | $75,000 |
| Oct 21, 2019 | Expired or cancelled withdrawn Sep 2020 | 2104 Divisadero St | reconstruct wood deck in rear yard. deck is 2'10 above grade. construct 42" firewall at north side of deckDetails
reconstruct wood deck in rear yard. deck is 2'10 above grade. construct 42" firewall at north side of deck | $15,000 |
| Feb 15, 2019 | Completed final sign-off Jun 2019 | 1 Clarendon Av | remove (e) tiles & waterproofing on exterior stairs and replace with new tiles to match existing. no structural work involved. dry rot repair work less than 50% stair replaced in-kind if neccessary. exterior stair not visible from street.Details
remove (e) tiles & waterproofing on exterior stairs and replace with new tiles to match existing. no structural work involved. dry rot repair work less than 50% stair replaced in-kind if neccessary. exterior stair not visible from street. | $20,000 |
| Jun 18, 2018 | Never finaled issued Jun 2018, no final | 2701 Van Ness Av | demo-add in bathtub, add shower fixture, add wall tile, add floor tile, replacing current fixture in the same location. maher n/a.Details
demo-add in bathtub, add shower fixture, add wall tile, add floor tile, replacing current fixture in the same location. maher n/a. | $20,000 |
| Aug 8, 2013 | Completed final sign-off Aug 2013 | 584 Hill St | to obtain final inspection for work approved under pa # 200008299177. all work is complete.Details
to obtain final inspection for work approved under pa # 200008299177. all work is complete. | |
| Aug 7, 2013 | Completed final sign-off Aug 2013 | 584 Hill St | to obtain final inspection for work approved under pa # 9112510. all work is complete.Details
to obtain final inspection for work approved under pa # 9112510. all work is complete. |