Back to kitchen remodel contractors
O'neill & Neville Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Apr 2008 to Jul 2024
- Last 24 months
- 0 permits filed
100 permits since 2000: 87 completed, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 13 completed, 1 never finaled. Typically 4 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2024 | Completed final sign-off Jan 2026 | 2446 46th Av | 2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permitDetails
2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permit | $300,000 |
| Dec 6, 2022 | Completed final sign-off Aug 2024 | 234 Brentwood Av | addition of 756 sq ft of new conditioned living space at basement level with new stairs to first level. remodel kitchen and dining room on level 1. adding small deck filling in space at back of house and (e) retaining wallDetails
addition of 756 sq ft of new conditioned living space at basement level with new stairs to first level. remodel kitchen and dining room on level 1. adding small deck filling in space at back of house and (e) retaining wall | $100,000 |
| Jul 13, 2022 | Completed final sign-off Jan 2025 | 479 37th Av | exterior changes to left and rear facade not visible from public right of way. 1/fl remodel of kitchen and half bath 2/fl change layout to add one bathroom, washer/dryer and remodel of (e) bathroom.Details
exterior changes to left and rear facade not visible from public right of way. 1/fl remodel of kitchen and half bath 2/fl change layout to add one bathroom, washer/dryer and remodel of (e) bathroom. | $130,000 |
| Jul 20, 2021 | Completed final sign-off Nov 2022 | 456 Noe St | remodel kitchen in-kind with new finisehs, appliances and lighting. in bedroom, remove non-load bearing wall and relocate closet.Details
remodel kitchen in-kind with new finisehs, appliances and lighting. in bedroom, remove non-load bearing wall and relocate closet. | $30,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 1667 32nd Av | kitchen dinette remodelDetails
kitchen dinette remodel | $38,000 |
| Aug 23, 2019 | Completed final sign-off Mar 2020 | 419 Collingwood St | interior remodel of tenancy-in-common unit incl (n) kitchen, removal of wall, addition of support beam, master bathroom and closets remodel. no changes to facade, entrances nor addition of sq footageDetails
interior remodel of tenancy-in-common unit incl (n) kitchen, removal of wall, addition of support beam, master bathroom and closets remodel. no changes to facade, entrances nor addition of sq footage | $137,500 |
| Feb 4, 2019 | Completed final sign-off Mar 2019 | 1519 La Salle Av | kitchen: new cabinets, add gfi's per code & add d/w. plumbing not moving.Details
kitchen: new cabinets, add gfi's per code & add d/w. plumbing not moving. | $12,000 |
| Oct 18, 2018 | Completed final sign-off Mar 2019 | 3166 26th St | kitchen + bath remodel. some layout, no structural work.Details
kitchen + bath remodel. some layout, no structural work. | $35,000 |
| May 3, 2017 | Completed final sign-off Sep 2017 | 418 Cayuga Av | kitchen remodel: demo of lathe & plaster, recoup void space. replace k & t wiring with romex. add outlets, ckts and lighting. run gas line for range, extend cold water line for ice maker. install dryall & cabinets. some non-structual framing required, install range and move fridge. paint.Details
kitchen remodel: demo of lathe & plaster, recoup void space. replace k & t wiring with romex. add outlets, ckts and lighting. run gas line for range, extend cold water line for ice maker. install dryall & cabinets. some non-structual framing required, install range and move fridge. paint. | $30,000 |
| Nov 14, 2014 | Completed final sign-off Dec 2014 | 721 York St | revision & addition work under pa #201403261729 - single 3'x3' skylight in kitchen @ upper unit. relocate sink and shower (2nd floor). relocate washer and dryer (2nd floor)Details
revision & addition work under pa #201403261729 - single 3'x3' skylight in kitchen @ upper unit. relocate sink and shower (2nd floor). relocate washer and dryer (2nd floor) | $1,000 |
| Mar 26, 2014 | Completed final sign-off Dec 2014 | 721 York St | remodel kitchen in both units. remove & relocate existing bathroom. removal of wall in kitchen area. ref #2004.0720.9268 & #2014.0312.0516.Details
remodel kitchen in both units. remove & relocate existing bathroom. removal of wall in kitchen area. ref #2004.0720.9268 & #2014.0312.0516. | $62,000 |
| Jun 6, 2013 | Never finaled issued Jun 2013, no final | 1529 Dolores St | bathroom additon and kitchen remodel on 1st floor. structural upgrade in basementDetails
bathroom additon and kitchen remodel on 1st floor. structural upgrade in basement | $35,000 |
| Aug 9, 2012 | Completed final sign-off Sep 2012 | 1618 46th Av | revision to pa #201208086903 to clarify the work description in previous application: legalize work perforned without permit in kitchen at 2nd flr and bathroom at 3rd flr, replace finishes and fixtures. no structuiral work, no wall relocation or demolition. kitchen & bathroom are existing.Details
revision to pa #201208086903 to clarify the work description in previous application: legalize work perforned without permit in kitchen at 2nd flr and bathroom at 3rd flr, replace finishes and fixtures. no structuiral work, no wall relocation or demolition. kitchen & bathroom are existing. | |
| Aug 8, 2012 | Completed final sign-off Sep 2012 | 1618 46th Av | (1) bathroom & kitchen remodel, tile, cabinets + new fixtures + electrical on 2nd and 3rd floor. no lighting change.Details
(1) bathroom & kitchen remodel, tile, cabinets + new fixtures + electrical on 2nd and 3rd floor. no lighting change. | $10,000 |