Back to bathroom remodel contractors
O'neill & Neville Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Apr 2008 to Jul 2024
- Last 24 months
- 0 permits filed
100 permits since 2000: 87 completed, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2024 | Completed final sign-off Jul 2025 | 433 Collingwood St | 3 bathrooms, new tile, plumbing, and electrical fixtures. all plumbing remains in same location.Details
3 bathrooms, new tile, plumbing, and electrical fixtures. all plumbing remains in same location. | $35,000 |
| Jun 20, 2024 | Completed final sign-off Jan 2026 | 2446 46th Av | 2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permitDetails
2nd fl interior remodel of kitchen & bathroom new wall to back door new doors & finishes. new one level deck & stairs to backyard. new siding and structural plywood at back wall to support deck. asbestos abatement of existing siding on back wall of the house to be under separate permit | $300,000 |
| Nov 30, 2022 | Completed final sign-off Apr 2025 | 479 37th Av | demolition of sunroom, keeping part of deck, new stairs to backyard. replacement of non-original fenestration. reconstrut org facade as per historical records. grd fl int remodel, remodel grd fl bathroom. no int work on 1st and 2nd fl. ref# 2022-0713-8347Details
demolition of sunroom, keeping part of deck, new stairs to backyard. replacement of non-original fenestration. reconstrut org facade as per historical records. grd fl int remodel, remodel grd fl bathroom. no int work on 1st and 2nd fl. ref# 2022-0713-8347 | $130,000 |
| Jul 13, 2022 | Completed final sign-off Jan 2025 | 479 37th Av | exterior changes to left and rear facade not visible from public right of way. 1/fl remodel of kitchen and half bath 2/fl change layout to add one bathroom, washer/dryer and remodel of (e) bathroom.Details
exterior changes to left and rear facade not visible from public right of way. 1/fl remodel of kitchen and half bath 2/fl change layout to add one bathroom, washer/dryer and remodel of (e) bathroom. | $130,000 |
| Jan 29, 2021 | Completed final sign-off Sep 2021 | 2423 Broadway | remodel 2 (e) bathrooms. (n) plumbing fixtures, (n) skylight, (n) lighting & electrical. remodel office, rec room & bedroom. new cabinets, electrical. raising ceiling in rec room. (n) heating system & water heater. (n) skylight in rec room.Details
remodel 2 (e) bathrooms. (n) plumbing fixtures, (n) skylight, (n) lighting & electrical. remodel office, rec room & bedroom. new cabinets, electrical. raising ceiling in rec room. (n) heating system & water heater. (n) skylight in rec room. | $150,000 |
| Aug 23, 2019 | Completed final sign-off Mar 2020 | 419 Collingwood St | interior remodel of tenancy-in-common unit incl (n) kitchen, removal of wall, addition of support beam, master bathroom and closets remodel. no changes to facade, entrances nor addition of sq footageDetails
interior remodel of tenancy-in-common unit incl (n) kitchen, removal of wall, addition of support beam, master bathroom and closets remodel. no changes to facade, entrances nor addition of sq footage | $137,500 |
| Oct 18, 2018 | Completed final sign-off Mar 2019 | 3166 26th St | kitchen + bath remodel. some layout, no structural work.Details
kitchen + bath remodel. some layout, no structural work. | $35,000 |
| Aug 9, 2017 | Completed final sign-off Sep 2018 | 845 Montgomery St | 2 bathrooms remodel. new floor. n/a for maher.Details
2 bathrooms remodel. new floor. n/a for maher. | $50,000 |
| Dec 22, 2016 | Expired or cancelled expired Sep 2019 | 7633 Geary Bl | new retaining wall at south & west of building to replace (e) new bathroom in storage room.Details
new retaining wall at south & west of building to replace (e) new bathroom in storage room. | $60,000 |
| Aug 4, 2015 | Completed final sign-off May 2016 | 45 Joost Av | remodel 1st floor - relocated bathroom, new bay extension, new playroom, new bedroom, & new stair to 2nd floor.Details
remodel 1st floor - relocated bathroom, new bay extension, new playroom, new bedroom, & new stair to 2nd floor. | $30,000 |
| Mar 26, 2014 | Completed final sign-off Dec 2014 | 721 York St | remodel kitchen in both units. remove & relocate existing bathroom. removal of wall in kitchen area. ref #2004.0720.9268 & #2014.0312.0516.Details
remodel kitchen in both units. remove & relocate existing bathroom. removal of wall in kitchen area. ref #2004.0720.9268 & #2014.0312.0516. | $62,000 |
| Jun 6, 2013 | Never finaled issued Jun 2013, no final | 1529 Dolores St | bathroom additon and kitchen remodel on 1st floor. structural upgrade in basementDetails
bathroom additon and kitchen remodel on 1st floor. structural upgrade in basement | $35,000 |
| Aug 9, 2012 | Completed final sign-off Sep 2012 | 1618 46th Av | revision to pa #201208086903 to clarify the work description in previous application: legalize work perforned without permit in kitchen at 2nd flr and bathroom at 3rd flr, replace finishes and fixtures. no structuiral work, no wall relocation or demolition. kitchen & bathroom are existing.Details
revision to pa #201208086903 to clarify the work description in previous application: legalize work perforned without permit in kitchen at 2nd flr and bathroom at 3rd flr, replace finishes and fixtures. no structuiral work, no wall relocation or demolition. kitchen & bathroom are existing. | |
| Aug 8, 2012 | Completed final sign-off Sep 2012 | 1618 46th Av | (1) bathroom & kitchen remodel, tile, cabinets + new fixtures + electrical on 2nd and 3rd floor. no lighting change.Details
(1) bathroom & kitchen remodel, tile, cabinets + new fixtures + electrical on 2nd and 3rd floor. no lighting change. | $10,000 |
| Jan 6, 2010 | Completed final sign-off Mar 2010 | 279 Randall St | bathroom remodel; new plumbing, electrical, drywall. tile work at 2nd. floor. no wall removal. relocate bath window from side to rear.Details
bathroom remodel; new plumbing, electrical, drywall. tile work at 2nd. floor. no wall removal. relocate bath window from side to rear. | $10,800 |
| Aug 19, 2008 | Never finaled issued Aug 2008, no final | 132 Clayton St | remodel of bathroom. install enviromental venting of bathroom to roof. (thru unit above).Details
remodel of bathroom. install enviromental venting of bathroom to roof. (thru unit above). | $30,000 |
| Apr 21, 2008 | Completed final sign-off Jul 2008 | 37 Abbey St | demolition of bathroom down to studs & sub floor. bathtub to be replaced with shower pan. bathroom to be rocked. tiled and painted. no structural work. work in one bathroom only.Details
demolition of bathroom down to studs & sub floor. bathtub to be replaced with shower pan. bathroom to be rocked. tiled and painted. no structural work. work in one bathroom only. | $8,000 |