North Gate Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Aug 2026
- Last 24 months
- 8 permits filed
113 permits since 2000: 96 completed, 5 in progress, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
3 roof deck permits: 3 completed. Typically 0 days from filing to permit and 35 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2020 | Completed final sign-off Dec 2020 | 1890 Vallejo St | administrative revision for pa# 201812107872 reduce size of existing roof deck, maintain guardrails between deck and access points to roof. no structural changesDetails
administrative revision for pa# 201812107872 reduce size of existing roof deck, maintain guardrails between deck and access points to roof. no structural changes | |
| Dec 10, 2018 | Completed final sign-off Dec 2020 | 1890 Vallejo St | interior remodel at unit #3: remodel kitchen and bath rooms. remove interior wall at kitchen and mastetr bedroom. remove and replace stair from 3rd floor to 4th floor. provide roof deck at 4th floor.Details
interior remodel at unit #3: remodel kitchen and bath rooms. remove interior wall at kitchen and mastetr bedroom. remove and replace stair from 3rd floor to 4th floor. provide roof deck at 4th floor. | $150,000 |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 3345 17th St | repair and replace in kind 225 sq ft of extg roof deck boards in common area due to fire damage.Details
repair and replace in kind 225 sq ft of extg roof deck boards in common area due to fire damage. | $7,000 |