Back to bathroom remodel contractors
North Gate Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Aug 2026
- Last 24 months
- 8 permits filed
113 permits since 2000: 96 completed, 5 in progress, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 32 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 411 Shrader St | remodel (e) 3rd floor master bath & closet, 160 sq. ft. area.Details
remodel (e) 3rd floor master bath & closet, 160 sq. ft. area. | $70,000 |
| Oct 20, 2025 | Completed final sign-off Sep 2026 | 445 Broderick St | kitchen, bath and laundry remodel. patch existing walls for knob and tube replacement. all like for like remodel, no wall demolition nor construction, no change in plumbing fixture count.Details
kitchen, bath and laundry remodel. patch existing walls for knob and tube replacement. all like for like remodel, no wall demolition nor construction, no change in plumbing fixture count. | $95,000 |
| Sep 24, 2024 | Completed final sign-off Mar 2025 | 33 20th Av | partial demo of non structural interior partition walls, interior finishes/fixtures and millwork at (e) bathroom & bedroom (5). work includes replacement in kind of 3 exterior doors (1 single & 1 french pair) & 3 windows at the rear elevation. no work visible from streetDetails
partial demo of non structural interior partition walls, interior finishes/fixtures and millwork at (e) bathroom & bedroom (5). work includes replacement in kind of 3 exterior doors (1 single & 1 french pair) & 3 windows at the rear elevation. no work visible from street | $50,000 |
| Jun 18, 2024 | In progress issued Jun 2024 | 39 Nordhoff St | replace (e) exterior stair with (n) enclosed stair. kitchen remodel on 2nd fl; add 1 bath & 1 bedroom on 1st fl. stair not visible from streetDetails
replace (e) exterior stair with (n) enclosed stair. kitchen remodel on 2nd fl; add 1 bath & 1 bedroom on 1st fl. stair not visible from street | $100,000 |
| Dec 4, 2023 | Completed final sign-off Oct 2024 | 1253 Masonic Av | unit 1253- remodel kitchen and bathroom in kind. kitchen approx 175sqft and bathroom approx 60 sqft: unit 1257: remove and replace existing kitchen ceiling, (160 sqft) due to water damage. repair dry rot damage as required.Details
unit 1253- remodel kitchen and bathroom in kind. kitchen approx 175sqft and bathroom approx 60 sqft: unit 1257: remove and replace existing kitchen ceiling, (160 sqft) due to water damage. repair dry rot damage as required. | $90,000 |
| Oct 6, 2023 | Completed final sign-off Oct 2024 | 1255 Masonic Av | kitchen and bath remodel in kind. kitchen approx. 175sf, bathroom approx. 60sf.Details
kitchen and bath remodel in kind. kitchen approx. 175sf, bathroom approx. 60sf. | $60,000 |
| Jun 28, 2022 | Completed final sign-off Feb 2024 | 1438 Mason St | remodel 1 kitchen, 1 full bath, 1 half bath in kind. no altering of wall, window and work.Details
remodel 1 kitchen, 1 full bath, 1 half bath in kind. no altering of wall, window and work. | $50,000 |
| Apr 27, 2022 | Completed final sign-off Aug 2023 | 411 Shrader St | remodel ktichen & bathroomDetails
remodel ktichen & bathroom | $50,000 |
| Jan 28, 2022 | Completed final sign-off Aug 2023 | 90 Palm Av | remodel kitchen and 2 bathrooms. add laundry and vanity.Details
remodel kitchen and 2 bathrooms. add laundry and vanity. | $60,000 |
| Jan 27, 2021 | Expired or cancelled cancelled Nov 2024 | 725 Baker St | horizontal expansion at ground floor of three-story building. the addition includes bedroom, kitchen, and bathroom. the expansion will add an additional unit (allowed by zoning classification) to the existing building.Details
horizontal expansion at ground floor of three-story building. the addition includes bedroom, kitchen, and bathroom. the expansion will add an additional unit (allowed by zoning classification) to the existing building. | $250,000 |
| Jan 5, 2021 | Completed final sign-off Jul 2022 | 2025 Pacific Av | 2 full bathroom remodels on 3/f. expand both bathrooms into (e) closets. add closet in master bedroom.Details
2 full bathroom remodels on 3/f. expand both bathrooms into (e) closets. add closet in master bedroom. | $75,000 |
| Feb 26, 2020 | Never finaled issued Nov 2020, no final | 301 Oak Park Dr | rev to pa# 201909252674; revision to permitted interior remodel, to include bathrooms and window replacements, create (n) bedroom and den on 1st fl. level. remove (e) wet bar at the 1st floor great roomDetails
rev to pa# 201909252674; revision to permitted interior remodel, to include bathrooms and window replacements, create (n) bedroom and den on 1st fl. level. remove (e) wet bar at the 1st floor great room | $45,000 |
| Dec 10, 2018 | Completed final sign-off Dec 2020 | 1890 Vallejo St | interior remodel at unit #3: remodel kitchen and bath rooms. remove interior wall at kitchen and mastetr bedroom. remove and replace stair from 3rd floor to 4th floor. provide roof deck at 4th floor.Details
interior remodel at unit #3: remodel kitchen and bath rooms. remove interior wall at kitchen and mastetr bedroom. remove and replace stair from 3rd floor to 4th floor. provide roof deck at 4th floor. | $150,000 |
| Feb 15, 2018 | Completed final sign-off Sep 2018 | 2682 18th Av | new interior stair to ground fl, new bedroom, laundry and remodeled bath at gr flDetails
new interior stair to ground fl, new bedroom, laundry and remodeled bath at gr fl | $45,000 |
| May 10, 2017 | Completed final sign-off Dec 2017 | 43 Nordhoff St | interior remodel of master suite & hall bath of (e) single family residenceDetails
interior remodel of master suite & hall bath of (e) single family residence | $110,000 |
| Apr 7, 2017 | Completed final sign-off Dec 2017 | 43 Nordhoff St | remove (e) lath and plaster wall surfaces from 2nd level master bedroom suite and hall bathroom. no structural change.Details
remove (e) lath and plaster wall surfaces from 2nd level master bedroom suite and hall bathroom. no structural change. | $4,000 |
| Jun 19, 2014 | Completed final sign-off Aug 2014 | 177 28th St | provide new interior stair to ground floor; provide new bathroom @ ground floor; provide (n) side windows @ ground floor; build new closets @ ground floorDetails
provide new interior stair to ground floor; provide new bathroom @ ground floor; provide (n) side windows @ ground floor; build new closets @ ground floor | $28,000 |
| May 2, 2014 | Completed final sign-off Aug 2015 | 33 20th Av | interior alteration & addition @ ground level to (e) house. work includes partial demolition & construction of new bedroom, bathroom, laundry & storage.Details
interior alteration & addition @ ground level to (e) house. work includes partial demolition & construction of new bedroom, bathroom, laundry & storage. | $150,000 |
| Dec 20, 2013 | Completed final sign-off Jan 2016 | 121 San Pablo Av | 1st fl kitchen addition of 37 sq ft & 2nd fl addition of 162 sq ft. other work includes converting unconditioned basement to habitable space of 443 sq ft; renovate 1st fl kitchen, bath, pantry & hall. 2nd fl renovate of master suite, laundry & 2 bedrm & bath. (n) windows & porch @ front elevation.Details
1st fl kitchen addition of 37 sq ft & 2nd fl addition of 162 sq ft. other work includes converting unconditioned basement to habitable space of 443 sq ft; renovate 1st fl kitchen, bath, pantry & hall. 2nd fl renovate of master suite, laundry & 2 bedrm & bath. (n) windows & porch @ front elevation. | $250,000 |
| Jul 2, 2013 | Completed final sign-off Dec 2013 | 34 Mountain Spring Av | interior renovation @ 1st floor including 1 full bath.Details
interior renovation @ 1st floor including 1 full bath. | $30,000 |
| May 22, 2013 | Completed final sign-off Aug 2013 | 230 11th Av | 1)add a new master bathroom to replace (e) water closet; 2)relocate entry door for the master suite; 3)enlarge the opening between master bed and closet; 4)remove the abandoned flue at rear of master closet.Details
1)add a new master bathroom to replace (e) water closet; 2)relocate entry door for the master suite; 3)enlarge the opening between master bed and closet; 4)remove the abandoned flue at rear of master closet. | $7,500 |
| Mar 1, 2013 | Completed final sign-off May 2013 | 2726 Polk St | revision to pa# 201301097558. to revise existing ground floor level plan to reflect the existing condition (bathroom with shower and storage room), which was not shown on original application.Details
revision to pa# 201301097558. to revise existing ground floor level plan to reflect the existing condition (bathroom with shower and storage room), which was not shown on original application. | |
| Dec 26, 2012 | Completed final sign-off May 2013 | 2726 Polk St | remodel 2 kitchens, 1 in each unit. remodel 3 baths, 1 in each unit and 1 in rear of garage. total 3 baths, 2 kitchens. lighting shall comply with t24Details
remodel 2 kitchens, 1 in each unit. remodel 3 baths, 1 in each unit and 1 in rear of garage. total 3 baths, 2 kitchens. lighting shall comply with t24 | $70,000 |
| Nov 9, 2012 | Completed final sign-off Mar 2013 | 377 Duncan St | add additional 3rd fl full bath, approx 44 sq ft with 8'3 ceiling heightDetails
add additional 3rd fl full bath, approx 44 sq ft with 8'3 ceiling height | $15,000 |
| Oct 5, 2012 | Completed final sign-off Nov 2012 | 556 Arch St | repair/replace termite & fungus damaged: 1/f 650 sq.ft. of (e) drywall in 2 rear storage room. 450 sq.ft. of sub floor & sleeper system over (e) slab, reframe (e) bathroom, interior & exterior walls (approx. 625 sq.ft.) remodel 1/f bathroom as required for termite damage repair, install new drywallDetails
repair/replace termite & fungus damaged: 1/f 650 sq.ft. of (e) drywall in 2 rear storage room. 450 sq.ft. of sub floor & sleeper system over (e) slab, reframe (e) bathroom, interior & exterior walls (approx. 625 sq.ft.) remodel 1/f bathroom as required for termite damage repair, install new drywall | $12,500 |
| Aug 9, 2012 | Completed final sign-off Dec 2012 | 33 20th Av | interior renovation to 3rd floor of 3 story residence and replacement of selected windows and doors. will include new bthroom to replace extg bathroom and a new closet. demo and construction limited to interior walls and portions of exterior walls, interior finishes, and elec. and plmbg components.Details
interior renovation to 3rd floor of 3 story residence and replacement of selected windows and doors. will include new bthroom to replace extg bathroom and a new closet. demo and construction limited to interior walls and portions of exterior walls, interior finishes, and elec. and plmbg components. | $60,000 |
| Apr 2, 2012 | Completed final sign-off May 2012 | 4408 17th St | remove (e) drywall ceiling throughout unit, excluding dining room,kitchen and bathroom. install high desity batt insulation into open ceiling, r-30 and install resilient chanel under 5/8" type x drywall througout opened ceiling areas. no structural or frame work required. square footage of ceilingDetails
remove (e) drywall ceiling throughout unit, excluding dining room,kitchen and bathroom. install high desity batt insulation into open ceiling, r-30 and install resilient chanel under 5/8" type x drywall througout opened ceiling areas. no structural or frame work required. square footage of ceiling | $8,500 |
| Apr 8, 2010 | Completed final sign-off Sep 2010 | 678 Portola Dr | interior remodel: (e) living space to be expanded, addition of bathroom, upgrade electrical, kitchen remodel, lighting, hvac unit insulation, replace windows, gen. finishes, work non-structural, non-seismic, no (n) sq.ft. added, only interior alterations. (to comply with complaint #201039282).Details
interior remodel: (e) living space to be expanded, addition of bathroom, upgrade electrical, kitchen remodel, lighting, hvac unit insulation, replace windows, gen. finishes, work non-structural, non-seismic, no (n) sq.ft. added, only interior alterations. (to comply with complaint #201039282). | $160,000 |
| Jul 11, 2008 | Completed final sign-off Mar 2009 | 120 Palm Av | remove existing kitchen cabinets & appliances, wall coverings. remove (e) bathroom fixtures, cabinets, & wall coverings. remodel kitchen & bath to match (e) layout. remove (e) rear deck. open walls for exploritory inspection for engineer for future rear addition. deck is less than 30" above ground.Details
remove existing kitchen cabinets & appliances, wall coverings. remove (e) bathroom fixtures, cabinets, & wall coverings. remodel kitchen & bath to match (e) layout. remove (e) rear deck. open walls for exploritory inspection for engineer for future rear addition. deck is less than 30" above ground. | $12,000 |
| Jan 31, 2008 | Completed final sign-off Feb 2008 | 1920 Scott St | repair and replace existingnorth side mudsill due to water damage. cap existing concrete foundation with concrete a minimum of 6" above existing exterior grade (approx 30') repair similiar condition of 6' of ground level east side bathroom wall, replace (e) sills in these areas with 3x6 pt sill.Details
repair and replace existingnorth side mudsill due to water damage. cap existing concrete foundation with concrete a minimum of 6" above existing exterior grade (approx 30') repair similiar condition of 6' of ground level east side bathroom wall, replace (e) sills in these areas with 3x6 pt sill. | $2,500 |
| Jan 31, 2008 | Completed final sign-off Mar 2009 | 120 Palm Av | new rear yard horizontal addition. remodel interior. 1st floor unit including kitchen & bathrooms. remove interior stair from 2nd floor unit and add fire escape.Details
new rear yard horizontal addition. remodel interior. 1st floor unit including kitchen & bathrooms. remove interior stair from 2nd floor unit and add fire escape. | $100,000 |
| Nov 30, 2007 | Completed final sign-off Jul 2008 | 1920 Scott St | replace (e) beam/posts & steel @ garage. enlarge garage door. remodel bathroom fixture. add hower to power rm on 1st floor. remodel kitchen, add power room on 2nd floor. remodel 2 bathrooms fixture on 3rd floor. remove masonry fireplace.Details
replace (e) beam/posts & steel @ garage. enlarge garage door. remodel bathroom fixture. add hower to power rm on 1st floor. remodel kitchen, add power room on 2nd floor. remodel 2 bathrooms fixture on 3rd floor. remove masonry fireplace. | $40,000 |
| Nov 29, 2007 | Completed final sign-off Apr 2008 | 124 08th Av | renovation to 3rd floor: enlarge kitchen, remove partition walls, convert existing bathroom to full bathroom & added 1 bathroom (total 2 baths), replacing window sashes in front.Details
renovation to 3rd floor: enlarge kitchen, remove partition walls, convert existing bathroom to full bathroom & added 1 bathroom (total 2 baths), replacing window sashes in front. | $18,000 |
| Feb 6, 2007 | Completed final sign-off Apr 2007 | 300 03rd St | replace kitchen cabainets replace vanity cabinet in bathroomDetails
replace kitchen cabainets replace vanity cabinet in bathroom | $12,000 |
| Nov 10, 2006 | Completed final sign-off Jan 2007 | 159 Clifford Tr | replace (e) water damaged wood such as windows with alike as follow's-in unit 161-one in kitchen and one in bathroom, unit 159-four in rear rooms, one in kitchen and one in bathroom, total of eight. not visible from street.Details
replace (e) water damaged wood such as windows with alike as follow's-in unit 161-one in kitchen and one in bathroom, unit 159-four in rear rooms, one in kitchen and one in bathroom, total of eight. not visible from street. | $3,000 |
| Aug 25, 2006 | Completed final sign-off Feb 2007 | 159 Clifford Tr | remodel 159 and 161 as follows: replace bath, kitchen cabinets and appliances. repair water damage in bathrooms and replace bathroom fixtures and tile. lighting fixtures to comply w/tile 24 energy codes.Details
remodel 159 and 161 as follows: replace bath, kitchen cabinets and appliances. repair water damage in bathrooms and replace bathroom fixtures and tile. lighting fixtures to comply w/tile 24 energy codes. | $40,000 |
| Nov 19, 2004 | Never finaled issued Nov 2004, no final | 3801 18th St | kitchen remodel, remove & replace cabinetry countertops, bathroom remodel remove & replace tile & baDetails
kitchen remodel, remove & replace cabinetry countertops, bathroom remodel remove & replace tile & ba | $10,000 |