Back to kitchen remodel contractors
New Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Aug 2022
- Last 24 months
- 0 permits filed
39 permits since 2000: 27 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 2 never finaled. Typically 8 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2019 | Completed final sign-off May 2021 | 3459 Mission St | comply with n.o.v #201933911. legalize 2 residential units at rear of building. 1st fl, one bedroom, one bath and kitchen. 2nd fl, two bedroom, one bathrm and kitchen.Details
comply with n.o.v #201933911. legalize 2 residential units at rear of building. 1st fl, one bedroom, one bath and kitchen. 2nd fl, two bedroom, one bathrm and kitchen. | $120,000 |
| Jun 15, 2018 | Never finaled issued Jul 2018, no final | 2222 Irving St | remove partial wall between (e) sitting area on 1st fl per plan. remove (e) wall at kitchen, upgrade (e) restroom to new ada all gender restroom. (e) hvac systems to remain, including kitchen hoods & exh fans.Details
remove partial wall between (e) sitting area on 1st fl per plan. remove (e) wall at kitchen, upgrade (e) restroom to new ada all gender restroom. (e) hvac systems to remain, including kitchen hoods & exh fans. | $48,000 |
| May 25, 2016 | Completed final sign-off Jan 2017 | 3110 Ocean Av | remodel existing kitchen at 2nd fl. add 1 bath at 2nd fl, remodel e bath 2nd fl. relocate washer and dryer in garage area maher not reqDetails
remodel existing kitchen at 2nd fl. add 1 bath at 2nd fl, remodel e bath 2nd fl. relocate washer and dryer in garage area maher not req | $30,000 |
| Aug 10, 2012 | Completed final sign-off Oct 2012 | 551 45th Av | remodel kitchen. rmove non-bearing wall and built in hood. upgrade electrical to code, relocate plumbing to conform to relocated sink, expand exhaust vent to roof.Details
remodel kitchen. rmove non-bearing wall and built in hood. upgrade electrical to code, relocate plumbing to conform to relocated sink, expand exhaust vent to roof. | $10,000 |
| Jun 4, 2009 | Never finaled issued Jun 2009, no final | 2955 19th Av | remodeling kitchen at first floor: new tile and new counter top, new paint.Details
remodeling kitchen at first floor: new tile and new counter top, new paint. | $5,000 |
| Oct 6, 2008 | Completed final sign-off Jan 2009 | 1491 43rd Av | add 2 bedrooms, 2 full bath, 2 storage and laundry rooms on existing ground floor per plan. remodel existing kitchen and 2 baths on 2nd floor. replace 2 rear windows on ground floorDetails
add 2 bedrooms, 2 full bath, 2 storage and laundry rooms on existing ground floor per plan. remodel existing kitchen and 2 baths on 2nd floor. replace 2 rear windows on ground floor | $54,000 |
| Nov 30, 2007 | Completed final sign-off May 2009 | 2502 Anza St | remodel (e) kitchen and bath in units 2502,2504, 2506. replace kitchen cabs., appliances, countentop and flooring. replace bathroom sink,toilet,bathtubs, floor tile, add washer and dryer in above 3 units. infill the interior walls.Details
remodel (e) kitchen and bath in units 2502,2504, 2506. replace kitchen cabs., appliances, countentop and flooring. replace bathroom sink,toilet,bathtubs, floor tile, add washer and dryer in above 3 units. infill the interior walls. | $18,000 |
| Aug 23, 2004 | Completed final sign-off Sep 2004 | 69 Morningside Dr | revised drawing. remove remodel 2nd flr kitchen from permit 1027815 issued 6/15/04-app 200406156475Details
revised drawing. remove remodel 2nd flr kitchen from permit 1027815 issued 6/15/04-app 200406156475 | |
| Jul 20, 2004 | Completed final sign-off Aug 2005 | 1430 Holloway Av | remodel kitchen & new wood deck @main fl.replace (e)windows w/stud wall to reconfigurate the masterDetails
remodel kitchen & new wood deck @main fl.replace (e)windows w/stud wall to reconfigurate the master | $25,000 |