New Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Aug 2022
- Last 24 months
- 0 permits filed
39 permits since 2000: 27 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 98 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2006 | Completed final sign-off Aug 2006 | 632 10th Av | replace (e) stair for (e) deck at rear and handreail. less than 50% replacement in kind.Details
replace (e) stair for (e) deck at rear and handreail. less than 50% replacement in kind. | $2,000 |
| Jul 20, 2004 | Completed final sign-off Aug 2005 | 1430 Holloway Av | remodel kitchen & new wood deck @main fl.replace (e)windows w/stud wall to reconfigurate the masterDetails
remodel kitchen & new wood deck @main fl.replace (e)windows w/stud wall to reconfigurate the master | $25,000 |