Back to bathroom remodel contractors
New Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Aug 2022
- Last 24 months
- 0 permits filed
39 permits since 2000: 27 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 12 completed, 6 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2025 | 2301 27th Av | remodel a bathroom at 2/f, non structural.Details
remodel a bathroom at 2/f, non structural. | $6,000 |
| Jun 10, 2019 | Completed final sign-off May 2021 | 3459 Mission St | comply with n.o.v #201933911. legalize 2 residential units at rear of building. 1st fl, one bedroom, one bath and kitchen. 2nd fl, two bedroom, one bathrm and kitchen.Details
comply with n.o.v #201933911. legalize 2 residential units at rear of building. 1st fl, one bedroom, one bath and kitchen. 2nd fl, two bedroom, one bathrm and kitchen. | $120,000 |
| Jun 21, 2018 | Completed final sign-off Dec 2022 | 643 22nd Av | legalization of unauthorized dwelling unit per ordinance# 43-14, (2 bedrooms & 1 bath). no exterior changes.Details
legalization of unauthorized dwelling unit per ordinance# 43-14, (2 bedrooms & 1 bath). no exterior changes. | $5,000 |
| Nov 7, 2017 | Completed final sign-off May 2018 | 2454 17th Av | add one new family, one closet & one new bathroom on 1st floor. relcoate water heater & heating furnace on 1st floor per plan.Details
add one new family, one closet & one new bathroom on 1st floor. relcoate water heater & heating furnace on 1st floor per plan. | $9,000 |
| Jul 6, 2017 | Completed final sign-off Dec 2017 | 837 33rd Av | remodel (e) family rm - convert family rm to bedroom & bathroom. add new bedrm, bathrm, and laundry on 1st fl per plan.Details
remodel (e) family rm - convert family rm to bedroom & bathroom. add new bedrm, bathrm, and laundry on 1st fl per plan. | $39,000 |
| May 25, 2016 | Completed final sign-off Jan 2017 | 3110 Ocean Av | remodel existing kitchen at 2nd fl. add 1 bath at 2nd fl, remodel e bath 2nd fl. relocate washer and dryer in garage area maher not reqDetails
remodel existing kitchen at 2nd fl. add 1 bath at 2nd fl, remodel e bath 2nd fl. relocate washer and dryer in garage area maher not req | $30,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 3010 26th Av | remodeling bathroom on 1/f. tile replacement, change toilet & sinik.Details
remodeling bathroom on 1/f. tile replacement, change toilet & sinik. | $4,000 |
| Feb 10, 2016 | Completed final sign-off Oct 2016 | 114 Clearfield Dr | 1st floor: add 2 bedrooms, 2 bathroom and one family room.Details
1st floor: add 2 bedrooms, 2 bathroom and one family room. | $65,000 |
| Jul 6, 2015 | Completed final sign-off Apr 2016 | 722 39th Av | infill extg lightwell and remodel extg bath.Details
infill extg lightwell and remodel extg bath. | $6,000 |
| Jun 4, 2015 | Never finaled issued Jun 2015, no final | 248 21st Av | remodel bathroom, new tile at floor and wall, replace sink and toilet. no wall to be moved.Details
remodel bathroom, new tile at floor and wall, replace sink and toilet. no wall to be moved. | $3,000 |
| Oct 3, 2013 | Never finaled issued Oct 2013, no final | 1870 34th Av | just replace walls and floor tiles in bathroom at 2/f.Details
just replace walls and floor tiles in bathroom at 2/f. | $1,200 |
| Nov 30, 2012 | Completed final sign-off Apr 2013 | 2606 36th Av | interior remodel. adding one master suite, one bedroom, one bath and storage at ground floor as per plans.Details
interior remodel. adding one master suite, one bedroom, one bath and storage at ground floor as per plans. | $48,000 |
| Dec 9, 2011 | Completed final sign-off Mar 2012 | 2748 36th Av | interior remodeling: adding two new bedrooms, two new bathrooms and storage at ground floor. add new exterior stair at rear of existing building as per plan.Details
interior remodeling: adding two new bedrooms, two new bathrooms and storage at ground floor. add new exterior stair at rear of existing building as per plan. | $38,000 |
| Aug 17, 2011 | Never finaled issued Aug 2011, no final | 7713 Geary Bl | change cabinet, bar sink and bathroom sink at basement.Details
change cabinet, bar sink and bathroom sink at basement. | $1,200 |
| Jun 23, 2009 | Never finaled issued Jun 2009, no final | 246 21st Av | remodeling bathroom, new tile at floor & wall. replace bath tub, sink & toilet (1st fl, not garage level)Details
remodeling bathroom, new tile at floor & wall. replace bath tub, sink & toilet (1st fl, not garage level) | $3,000 |
| Oct 6, 2008 | Completed final sign-off Jan 2009 | 1491 43rd Av | add 2 bedrooms, 2 full bath, 2 storage and laundry rooms on existing ground floor per plan. remodel existing kitchen and 2 baths on 2nd floor. replace 2 rear windows on ground floorDetails
add 2 bedrooms, 2 full bath, 2 storage and laundry rooms on existing ground floor per plan. remodel existing kitchen and 2 baths on 2nd floor. replace 2 rear windows on ground floor | $54,000 |
| Oct 1, 2008 | Never finaled issued Oct 2008, no final | 2649 31st Av | install new tile at the bathroom only. existing lav, wc, tub to remain.Details
install new tile at the bathroom only. existing lav, wc, tub to remain. | $2,000 |
| May 7, 2008 | Completed final sign-off Jul 2008 | 1715 42nd Av | add one bedroom and 1 full bathroom on existing ground floor per plan.Details
add one bedroom and 1 full bathroom on existing ground floor per plan. | $20,000 |
| Nov 30, 2007 | Completed final sign-off May 2009 | 2502 Anza St | remodel (e) kitchen and bath in units 2502,2504, 2506. replace kitchen cabs., appliances, countentop and flooring. replace bathroom sink,toilet,bathtubs, floor tile, add washer and dryer in above 3 units. infill the interior walls.Details
remodel (e) kitchen and bath in units 2502,2504, 2506. replace kitchen cabs., appliances, countentop and flooring. replace bathroom sink,toilet,bathtubs, floor tile, add washer and dryer in above 3 units. infill the interior walls. | $18,000 |
| Apr 15, 2003 | Expired or cancelled expired Apr 2004 | 215 Ewing Tr | change bathroom tile and paintingDetails
change bathroom tile and painting | $3,500 |