New Cities Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Jun 2026
- Last 24 months
- 3 permits filed
44 permits since 2000: 33 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 6 completed, 2 in progress. Typically 2 days from filing to permit and 391 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2024 | In progress issued Dec 2024 | 144 Encline Ct | replace in kind front house windows. 2nd floor three windows, 1st floor one window; one at 2nd fl bathroom, one at staircase, six bedroom windows; total of 12 windowsDetails
replace in kind front house windows. 2nd floor three windows, 1st floor one window; one at 2nd fl bathroom, one at staircase, six bedroom windows; total of 12 windows | $2,000 |
| Jul 12, 2024 | In progress issued Dec 2024 | 144 Encline Ct | 2nd floor - infill to enlarge kitche; reconfigure and remodel kitchen; remodel full bath; 1st fl - add family room kitchenette, master bedroom and bath; 2nd full bath, media room, laundry room and deck with stairs to backyard; replace furnace and water heater with tankless typeDetails
2nd floor - infill to enlarge kitche; reconfigure and remodel kitchen; remodel full bath; 1st fl - add family room kitchenette, master bedroom and bath; 2nd full bath, media room, laundry room and deck with stairs to backyard; replace furnace and water heater with tankless type | $220,000 |
| Aug 24, 2022 | Completed final sign-off May 2024 | 834 25th Av | ground floor: add media room & replace garage door; 2/f: reconfigure & remodel ktichen, convert full bath to half bath, add deck & stairs are rear; 3/f: add primary bath & walk-in closet, reconfigure & remodel bath 2Details
ground floor: add media room & replace garage door; 2/f: reconfigure & remodel ktichen, convert full bath to half bath, add deck & stairs are rear; 3/f: add primary bath & walk-in closet, reconfigure & remodel bath 2 | $150,000 |
| Dec 27, 2021 | Completed final sign-off Jul 2022 | 606 Noe St | add interior steel spiral staircase to connect 2nd and 3rd flDetails
add interior steel spiral staircase to connect 2nd and 3rd fl | $20,000 |
| Sep 24, 2021 | Completed final sign-off Dec 2022 | 182 Morningside Dr | top fl: reconfig & remodel (e) master bath; 2/f: reconfig & remodel 2 full bath; main fl: config & remodel kitchen, relocate stairs to g/f; g/f: add family room, laundry room & full bath behind garage. replace all windows with double pane (u-factor 0.30 or better); replace w/h & furnace.Details
top fl: reconfig & remodel (e) master bath; 2/f: reconfig & remodel 2 full bath; main fl: config & remodel kitchen, relocate stairs to g/f; g/f: add family room, laundry room & full bath behind garage. replace all windows with double pane (u-factor 0.30 or better); replace w/h & furnace. | $200,000 |
| Jul 1, 2021 | Completed final sign-off Jun 2022 | 786 44th Av | remove and replace front exterior walls & surface, stair stucco (e) due to dry rots. install led lights for stairway. visible from street.Details
remove and replace front exterior walls & surface, stair stucco (e) due to dry rots. install led lights for stairway. visible from street. | $20,000 |
| Dec 14, 2020 | Completed final sign-off Mar 2023 | 433 Upper Tr | unit #1 - remodel 2 bathroooms, add bedroom. reconstruct internal stair between floors of unit. existing structural not accectped of remodel ref pa 202011189147 for exterior changes. remodel 1 kitchen.Details
unit #1 - remodel 2 bathroooms, add bedroom. reconstruct internal stair between floors of unit. existing structural not accectped of remodel ref pa 202011189147 for exterior changes. remodel 1 kitchen. | $65,000 |
| Sep 19, 2014 | Completed final sign-off Mar 2015 | 715 12th Av | in-fill under (e) breakfast rm. construct one bedrm, family rm, bathrm at g/f. remodel (e) kitchen, half bathrm, replace sheetrock in kitchen and construct deck with staircase at rear of building at 2/f. convert (e) bathrm into two full bathrm, construct hallway for rear bedrm at 3fDetails
in-fill under (e) breakfast rm. construct one bedrm, family rm, bathrm at g/f. remodel (e) kitchen, half bathrm, replace sheetrock in kitchen and construct deck with staircase at rear of building at 2/f. convert (e) bathrm into two full bathrm, construct hallway for rear bedrm at 3f | $64,000 |