Block 2629A, lot 055
433 Upper Ter
- City’s use
- Multi-Family Residential
- Built
- 1977
- Stories
- 6
- Units
- 8
- Rooms
- 18 bedrooms, 18 bathrooms
- Building
- 12,610 sq ft
- Lot
- 7,373 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2024 | Completed final sign-off May 2024 | 433 Upper Tr | revision to bpa# 202011189147: revision to original plan set reflecting that we did not building 42 inch wall on upper roof deck.Details
revision to bpa# 202011189147: revision to original plan set reflecting that we did not building 42 inch wall on upper roof deck. | ||
| Feb 16, 2023 | Completed final sign-off May 2024 | 433 Upper Tr | remove lowest fire escape platform serving rear unit (2-story unit so fire escape access is maintained), replace/extend ladder to rear yard deck below. (2) means of egress for building, fully sprinkleredDetails
remove lowest fire escape platform serving rear unit (2-story unit so fire escape access is maintained), replace/extend ladder to rear yard deck below. (2) means of egress for building, fully sprinklered | $1,500 | |
| Nov 28, 2022 | Completed final sign-off May 2024 | 433 Upper Tr | revision to pa 2022-0720-8879 rear yard deck. height of new deck is 7 ft above grade at highest point. minor configuration of deck shape w/some relocated post/pier supportsDetails
revision to pa 2022-0720-8879 rear yard deck. height of new deck is 7 ft above grade at highest point. minor configuration of deck shape w/some relocated post/pier supports | ||
| Aug 25, 2022 | Completed final sign-off Oct 2024 | 433 Upper Tr | Fastnet Engineering & Const Inc | unit #2: rev pa202104017734 complete remodel work (kitchen & 2 bathroom remodel under previous permit) for unit 2 only. enlarge rear cantilever deck.Details
unit #2: rev pa202104017734 complete remodel work (kitchen & 2 bathroom remodel under previous permit) for unit 2 only. enlarge rear cantilever deck. | $8,000 |
| Jul 20, 2022 | Completed final sign-off May 2024 | 433 Upper Tr | new rear yard deck - height not to exceed 6 ft over grade per planning code section 136c 24bbDetails
new rear yard deck - height not to exceed 6 ft over grade per planning code section 136c 24bb | $25,000 | |
| Dec 7, 2021 | Never finaled issued Feb 2022, no final | 433 Upper Tr | revision to pa 2020-1118-9147 glass guardrails for all decks. reconfigure deck for units 1 & 7. revised structural supportDetails
revision to pa 2020-1118-9147 glass guardrails for all decks. reconfigure deck for units 1 & 7. revised structural support | $8,000 | |
| Dec 7, 2021 | Completed final sign-off Mar 2022 | 433 Upper Tr | All Star Fire Protection Llc | to comply with 202182343. replaced painted sprinkler heads. replace 6' of 1 1/4 pipe & 4' of 1" pipe that was damagedDetails
to comply with 202182343. replaced painted sprinkler heads. replace 6' of 1 1/4 pipe & 4' of 1" pipe that was damaged | $2,500 |
| Aug 23, 2021 | Completed final sign-off Aug 2024 | 433 Upper Tr | S'top Roofing Company Inc | reroofingDetails
reroofing | $33,000 |
| May 25, 2021 | Completed final sign-off Mar 2022 | 433 Upper Tr | New Cities Construction | unit# 6 - in-kind kitchen & (e) wet bar remodel on 4th flr. no change to flr plan, no change to openings.Details
unit# 6 - in-kind kitchen & (e) wet bar remodel on 4th flr. no change to flr plan, no change to openings. | $15,000 |
| Apr 1, 2021 | Completed final sign-off Oct 2024 | 433 Upper Tr | Studio 101 General Building Contractor | unit 2 and 4: kitchen and 2 bathroom remodel. relocate washer and dryer. partial removal of load bearing wall. ref pa 202011189147 for exterior changes.Details
unit 2 and 4: kitchen and 2 bathroom remodel. relocate washer and dryer. partial removal of load bearing wall. ref pa 202011189147 for exterior changes. | $96,000 |
| Mar 10, 2021 | Completed final sign-off Jan 2024 | 433 Upper Tr | Priority Construction | apt 3, 2/f: relocate washer/dryer. remodel kitchen. partial removal of load-bearing wall b/t kitchen and hall. for exterior changes, ref pa 202011189147.Details
apt 3, 2/f: relocate washer/dryer. remodel kitchen. partial removal of load-bearing wall b/t kitchen and hall. for exterior changes, ref pa 202011189147. | $35,000 |
| Dec 14, 2020 | Completed final sign-off Mar 2023 | 433 Upper Tr | New Cities Construction | unit #1 - remodel 2 bathroooms, add bedroom. reconstruct internal stair between floors of unit. existing structural not accectped of remodel ref pa 202011189147 for exterior changes. remodel 1 kitchen.Details
unit #1 - remodel 2 bathroooms, add bedroom. reconstruct internal stair between floors of unit. existing structural not accectped of remodel ref pa 202011189147 for exterior changes. remodel 1 kitchen. | $65,000 |
| Dec 7, 2020 | Never finaled issued Jul 2021, no final | 433 Upper Tr | Studio 101 General Building Contractor, Headlands Construction Co | residential remodel of 2 units. unit #7 - remodel of kitchen/bath & structural upgrades. unit #8 - remodel of kitchen/bath & structural upgrades. no exterior alterations. reference pa #2020-1118-9147.Details
residential remodel of 2 units. unit #7 - remodel of kitchen/bath & structural upgrades. unit #8 - remodel of kitchen/bath & structural upgrades. no exterior alterations. reference pa #2020-1118-9147. | $120,000 |
| Dec 2, 2020 | Completed final sign-off Mar 2022 | 433 Upper Tr | New Cities Construction | unit 6 residential renovation. remodel 2 baths, relocate furnace and add washer dryerDetails
unit 6 residential renovation. remodel 2 baths, relocate furnace and add washer dryer | $60,000 |
| Nov 18, 2020 | Completed final sign-off May 2024 | 433 Upper Tr | Studio 101 General Building Contractor | replace (e) wood shingls with new wood shingles in-like kind. replace (e) windows. new cantilever decks at rear facade on floors 1/2/3. new deck at rear, less than 10ft above grade. new safety rail at (e) roof.Details
replace (e) wood shingls with new wood shingles in-like kind. replace (e) windows. new cantilever decks at rear facade on floors 1/2/3. new deck at rear, less than 10ft above grade. new safety rail at (e) roof. | $328,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- New Cities Construction (3), Studio 101 General Building Contractor (3), All Star Fire Protection Llc, Fastnet Engineering & Const Inc, Headlands Construction Co, Priority Construction, S'top Roofing Company Inc
- Architects
- Mark Thomas
- Engineers
- Alex Santos (8)
- Authorized agent-otherss
- Amber Kim
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.