Back to kitchen remodel contractors
New Cities Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Jun 2026
- Last 24 months
- 3 permits filed
44 permits since 2000: 33 completed, 4 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 17 completed, 2 in progress, 1 never finaled. Typically 8 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 8 Inverness Dr | g/f only: add laundry room. at (e) family room - add kitchenette with 2 burner cooktop and replace sliding door in (e) frame. at (e) exercise room - replace window in (e) frame, remodel full bathroom with addition of window and conversion of tub to shower.Details
g/f only: add laundry room. at (e) family room - add kitchenette with 2 burner cooktop and replace sliding door in (e) frame. at (e) exercise room - replace window in (e) frame, remodel full bathroom with addition of window and conversion of tub to shower. | $55,000 |
| Jul 12, 2024 | In progress issued Dec 2024 | 144 Encline Ct | 2nd floor - infill to enlarge kitche; reconfigure and remodel kitchen; remodel full bath; 1st fl - add family room kitchenette, master bedroom and bath; 2nd full bath, media room, laundry room and deck with stairs to backyard; replace furnace and water heater with tankless typeDetails
2nd floor - infill to enlarge kitche; reconfigure and remodel kitchen; remodel full bath; 1st fl - add family room kitchenette, master bedroom and bath; 2nd full bath, media room, laundry room and deck with stairs to backyard; replace furnace and water heater with tankless type | $220,000 |
| Apr 21, 2022 | Completed final sign-off Jan 2023 | 2990 22nd Av | kitchen/family room renovation on 1st fl. (2) bathrooms remodeling on 2nd fl. half bath reloate on 1st fl.Details
kitchen/family room renovation on 1st fl. (2) bathrooms remodeling on 2nd fl. half bath reloate on 1st fl. | $50,000 |
| Oct 28, 2021 | Completed final sign-off Jul 2022 | 606 Noe St | work on 2nd floor only. reconfigure & remodel kitchen. remodel full bath.Details
work on 2nd floor only. reconfigure & remodel kitchen. remodel full bath. | $32,000 |
| Sep 24, 2021 | Completed final sign-off Dec 2022 | 182 Morningside Dr | top fl: reconfig & remodel (e) master bath; 2/f: reconfig & remodel 2 full bath; main fl: config & remodel kitchen, relocate stairs to g/f; g/f: add family room, laundry room & full bath behind garage. replace all windows with double pane (u-factor 0.30 or better); replace w/h & furnace.Details
top fl: reconfig & remodel (e) master bath; 2/f: reconfig & remodel 2 full bath; main fl: config & remodel kitchen, relocate stairs to g/f; g/f: add family room, laundry room & full bath behind garage. replace all windows with double pane (u-factor 0.30 or better); replace w/h & furnace. | $200,000 |
| May 25, 2021 | Completed final sign-off Mar 2022 | 433 Upper Tr | unit# 6 - in-kind kitchen & (e) wet bar remodel on 4th flr. no change to flr plan, no change to openings.Details
unit# 6 - in-kind kitchen & (e) wet bar remodel on 4th flr. no change to flr plan, no change to openings. | $15,000 |
| Jan 15, 2021 | Never finaled issued Mar 2021, no final | 212 Santos St | kitchen remodeling at 2nd floor, remove portition of the wall between kitchen and living room area.Details
kitchen remodeling at 2nd floor, remove portition of the wall between kitchen and living room area. | $25,000 |
| Dec 14, 2020 | Completed final sign-off Mar 2023 | 433 Upper Tr | unit #1 - remodel 2 bathroooms, add bedroom. reconstruct internal stair between floors of unit. existing structural not accectped of remodel ref pa 202011189147 for exterior changes. remodel 1 kitchen.Details
unit #1 - remodel 2 bathroooms, add bedroom. reconstruct internal stair between floors of unit. existing structural not accectped of remodel ref pa 202011189147 for exterior changes. remodel 1 kitchen. | $65,000 |
| Oct 30, 2020 | Completed final sign-off Jan 2021 | 253 Farallones St | remodel e kitchen and bath in kind. no change in floor planDetails
remodel e kitchen and bath in kind. no change in floor plan | $15,000 |
| Oct 18, 2019 | Completed final sign-off May 2022 | 838 Darien Wy | unit legalizaiton ord 43-14. work at street & lower levels. legalize existing unit including living room, kitchen, nook, 3 bedrooms, playroom, & 2 full baths.Details
unit legalizaiton ord 43-14. work at street & lower levels. legalize existing unit including living room, kitchen, nook, 3 bedrooms, playroom, & 2 full baths. | $85,000 |
| Oct 11, 2019 | Completed final sign-off May 2022 | 838 Darien Wy | work at 2nd level: reconfigure & remodel kitchen, convert bedrooms to master bath & walk in closet, convert half bath to laundry closet, remodel guest bathDetails
work at 2nd level: reconfigure & remodel kitchen, convert bedrooms to master bath & walk in closet, convert half bath to laundry closet, remodel guest bath | $50,000 |
| Oct 1, 2018 | Completed final sign-off Aug 2019 | 925 Holloway Av | remodel existing kitchen, replace 15 exterior windows in-kind, add redwood floor decking at rear yardDetails
remodel existing kitchen, replace 15 exterior windows in-kind, add redwood floor decking at rear yard | $26,000 |
| Mar 8, 2017 | Completed final sign-off Aug 2017 | 358 02nd Av | obtain permit to interior remodel extg kitchen, bath, add family and toilet room at 2nd floor unit #2 as per plan. n/a for maherDetails
obtain permit to interior remodel extg kitchen, bath, add family and toilet room at 2nd floor unit #2 as per plan. n/a for maher | $40,000 |
| Jan 23, 2017 | Completed final sign-off Mar 2017 | 786 44th Av | remodel existing kitchen and bath on 2nd flDetails
remodel existing kitchen and bath on 2nd fl | $12,000 |
| Feb 11, 2015 | Completed final sign-off Apr 2015 | 358 02nd Av | #1, 2/f - remodel (e) kitchen and bath. n/a ordinance #155-13Details
#1, 2/f - remodel (e) kitchen and bath. n/a ordinance #155-13 | $12,000 |
| Jan 21, 2015 | Completed final sign-off Feb 2015 | 360 Arkansas St | replace existing kitchen & bathroom countertop & sink. replace (e) kitchen cooktop/oven. n/a ordinance#155-13.Details
replace existing kitchen & bathroom countertop & sink. replace (e) kitchen cooktop/oven. n/a ordinance#155-13. | $4,500 |
| Sep 19, 2014 | Completed final sign-off Mar 2015 | 715 12th Av | in-fill under (e) breakfast rm. construct one bedrm, family rm, bathrm at g/f. remodel (e) kitchen, half bathrm, replace sheetrock in kitchen and construct deck with staircase at rear of building at 2/f. convert (e) bathrm into two full bathrm, construct hallway for rear bedrm at 3fDetails
in-fill under (e) breakfast rm. construct one bedrm, family rm, bathrm at g/f. remodel (e) kitchen, half bathrm, replace sheetrock in kitchen and construct deck with staircase at rear of building at 2/f. convert (e) bathrm into two full bathrm, construct hallway for rear bedrm at 3f | $64,000 |
| Jan 9, 2014 | Completed final sign-off Feb 2014 | 2458 Great Hy | to comply with physical inspection report #cc - 7294. change kitchen cabinets and countertop for 2458 lower unit.Details
to comply with physical inspection report #cc - 7294. change kitchen cabinets and countertop for 2458 lower unit. | $8,500 |
| Jul 10, 2013 | Completed final sign-off Apr 2014 | 606 Noe St | remodel extg sunroom. remove kitchen, add laundry room, remodel extg bathroom, add slider, change name windows, new ceiling lighting, new flooring, change heating system, change balcony.Details
remodel extg sunroom. remove kitchen, add laundry room, remodel extg bathroom, add slider, change name windows, new ceiling lighting, new flooring, change heating system, change balcony. | $20,000 |
| Apr 30, 2012 | Completed final sign-off Jul 2012 | 362 Arkansas St | replace existing kitchen & bathroom countertops, replace existing light fixtures in kitchen to recessed lights, all (n) lighting must comply with cec 150(k)10Details
replace existing kitchen & bathroom countertops, replace existing light fixtures in kitchen to recessed lights, all (n) lighting must comply with cec 150(k)10 | $3,500 |