Nelson Contracting
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Feb 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 8 completed. Typically 6 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2020 | Completed final sign-off Sep 2020 | 752 Clayton St | repair front stairs. work required less than 50%.Details
repair front stairs. work required less than 50%. | $9,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2020 | 62 Chenery St | repair concrete stairs @ entry. install railingDetails
repair concrete stairs @ entry. install railing | $8,600 |
| Aug 31, 2018 | Completed final sign-off Feb 2020 | 1200 18th St | add private elevator, rebuild stairs, remodel bathroom. no exterior work. no additional condidioned floor areaDetails
add private elevator, rebuild stairs, remodel bathroom. no exterior work. no additional condidioned floor area | $60,000 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 1068 Carolina St | replace existing stairs and handrailing in kind (front) - 36" handrail in height; spacing not to exceed 4" picketsDetails
replace existing stairs and handrailing in kind (front) - 36" handrail in height; spacing not to exceed 4" pickets | $3,500 |
| Feb 5, 2016 | Completed final sign-off Feb 2017 | 131 Bella Vista Wy | convert (e) non-conditioned space at ground floor into habitable space, (n) bedroom, (n) bath, (n) den, (n) interior stairs connecting g/f with upper floor. (n) deck & stairs at rear yard, less than 10' above deck.Details
convert (e) non-conditioned space at ground floor into habitable space, (n) bedroom, (n) bath, (n) den, (n) interior stairs connecting g/f with upper floor. (n) deck & stairs at rear yard, less than 10' above deck. | $50,000 |
| Jul 25, 2014 | Completed final sign-off Sep 2014 | 900 Minnesota St | in unit 116, floor "1" modify area under stair, mezzanine: extend portion of (e) guardwall, add bookcase @ (e) guardwall. sprinklers deferred maher n/aDetails
in unit 116, floor "1" modify area under stair, mezzanine: extend portion of (e) guardwall, add bookcase @ (e) guardwall. sprinklers deferred maher n/a | $7,000 |
| Oct 7, 2013 | Completed final sign-off May 2014 | 679 Connecticut St | add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair.Details
add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair. | $63,500 |
| May 9, 2011 | Completed final sign-off Jul 2013 | 1015 Carolina St | remove and rebuild existing exterior stair in the existing configuration build 1 hour rated fire wall at property line along rebuilt stairs.Details
remove and rebuild existing exterior stair in the existing configuration build 1 hour rated fire wall at property line along rebuilt stairs. | $10,000 |